Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0675
Bid: 0.065
Ask: 0.07
Change: 0.00 (0.00%)
Spread: 0.005 (7.692%)
Open: 0.0675
High: 0.0675
Low: 0.0675
Prev. Close: 0.0675
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

9 Mar 2020 10:07

RNS Number : 4278F
Alba Mineral Resources PLC
09 March 2020
 

 

 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Dry Oil Flows to Surface Following Horse Hill-2z Water Shut-Off Programme

 

Alba Mineral Resources plc (AIM: ALBA), the diversified mineral exploration and development company, announces that it has received the following update from UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and PEDL 246 in which Alba has an 11.765% interest:

 

- The intervention to shut off significant formation water ingress into the Horse Hill-2z ("HH-2z") horizontal production well has been successful.

 

- Following the identification of the water ingress source via production logging, a rigid setting Thermatek® plug was set over a zone of open natural fractures clustered at the deepest part or "toe" of the wellbore. Initial testing of HH-2z post-Thermatek® has demonstrated a flow of dry oil to surface, confirming that the plug was successfully set.

 

- Dry oil flow rates during the initial 48-hour period to date are encouraging, with metered daily rates during periods of flow averaging 223 barrels of oil per day ("bopd"). However, as is to be expected in the very early "clean-up" stage of such a horizontal wellbore, both oil and associated gas rates have been very variable. Half hourly measured rates have thus ranged from a high of 778 bopd to a low of around 10 bopd.

 

- The water ingress problem meant that HH-2z remained shut-in for almost three months, with spent drilling and completion fluids within the near wellbore. Consequently, it is expected that the full clean-up process is likely to take a number of weeks of aggregate flow. As part of the clean-up process, to ensure the full remaining horizontal section contributes towards aggregate oil flow, further interventions are planned to help fine-tune and optimise flow from the well.

 

- HH-2z clean-up operations are planned to continue over the coming week, after which essential maintenance and a planned upgrade of well test and production facilities will occur. These operations, designed primarily to enable simultaneous production from HH-1 and HH-2z, will require both HH-1 and HH-2 to be shut-in for a period of up to ten days.

 

- Full extended well test operations with simultaneous multi-well production are planned to resume directly after the shut-in.

 

George Frangeskides, Alba's Executive Chairman, commented:

 

"We are very pleased to learn of the completion of the well intervention involving HH-2z and that, for the first time since completion of the drilling of the well in late 2019, a significant amount of dry oil has flowed to surface. We look forward to hearing of the outcome of the further works now planned to optimise and stabilise flow from the well."

 

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

 

Qualified Person's Statement

The technical information contained in this announcement has been reviewed and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial College London), a petroleum geologist with over 45 years' experience in the management, exploration, development and production of oil and gas.

 

Glossary

 

horizontal well a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon;

 

oil field an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface; and

 

 

Thermatek® a Halliburton trademarked rigid setting fluid plug designed to isolate zones within a completed wellbore

 

well test or "flow test", involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate and volumes.

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman

+44 20 3907 4297

 

 

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray

+44 20 7213 0880

 

 

 

First Equity Limited (Broker)

Jason Robertson

+44 20 7374 2212

 

 

 

 

 

Alba's Project and Investment Portfolio

Project (commodity)

Location

Ownership

Mining Projects

Amitsoq (graphite)

Greenland

90%

Clogau (gold)

Wales

90%

Inglefield (copper, cobalt, gold)

Greenland

100%

Limerick (zinc-lead)

Ireland

100%

Melville Bay (iron ore)

Greenland

51%

TBS (ilmenite)

Greenland

100%

Oil & Gas Investments

Brockham (oil)

England

5%

Horse Hill (oil)

England

11.765%

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDFLFIIVSIAIII
Date   Source Headline
18th Jul 20177:00 amRNSMultiple New Graphite Beds Discovered at Amitsoq
10th Jul 20177:00 amRNSUpdate on Horse Hill Project
5th Jul 20177:00 amRNSHolding(s) in Company
26th Jun 201712:00 pmRNSBrockham Update
30th May 20179:53 amRNSResult of AGM and Board Change
26th May 20177:00 amRNSAmitsoq Update
11th May 201711:00 amRNSBrockham Update
11th May 20177:00 amRNSBrockham Licence Update
8th May 20171:43 pmRNSAGM Notice
3rd May 20177:00 amRNSFinal Results
12th Apr 20177:00 amRNSAmitsoq Update
4th Apr 20177:00 amRNSHorse Hill Update
10th Mar 20178:09 amRNSBrockham Update
6th Mar 20172:00 pmRNSUpdate Presentation - Amitsoq Graphite Project
3rd Mar 20177:00 amRNSBrockham Update
27th Feb 20174:31 pmRNSCompletion of acquisition of interest in Amitsoq
20th Feb 20177:00 amRNSApproval for Alba Acquiring up to 100% of Amitsoq
14th Feb 20177:00 amRNSLimerick Update
7th Feb 20177:00 amRNSHorse Hill Update
30th Jan 20177:00 amRNSAmitsoq Update
26th Jan 20179:30 amRNSBrockham Update
18th Jan 20177:00 amRNSBrockham Update
13th Jan 20173:34 pmRNSIssue of Share Warrants and Share Options
13th Jan 20172:31 pmRNSExercise of Share Warrants
16th Dec 20164:00 pmRNSLimerick Update
15th Dec 20169:40 amRNSBrockham Oil Field Update
14th Nov 20164:00 pmRNSBrockham Update
1st Nov 20167:00 amRNSAmitsoq Update
25th Oct 20167:00 amRNSLimerick Update
17th Oct 20167:00 amRNSHorse Hill Update
3rd Oct 20163:37 pmRNSAmitsoq Update
22nd Sep 201612:09 pmRNSHolding(s) in Company
19th Sep 20161:38 pmRNSHolding(s) in Company
19th Sep 20167:00 amRNSIssue of Equity
13th Sep 201610:14 amRNSNutech report on Brockham-1 well in Weald Basin
12th Sep 201611:24 amRNSAirborne Electromagnetic Survey over Amitsoq
8th Sep 20167:00 amRNSBulk Sampling Completed at Amitsoq
19th Aug 20169:50 amRNSTotal Voting Rights - Correction
18th Aug 20164:59 pmRNSIssue of Equity and Warrants
9th Aug 201612:26 pmRNSBrockham Update
1st Aug 20167:00 amRNSHalf-year Report
26th Jul 20167:00 amRNSRenewal of Gold Licence
19th Jul 20167:00 amRNSHorse Hill Update
5th Jul 20167:00 amRNSLicence Conversions Granted for Horse Hill Project
16th Jun 201612:50 pmRNSDirector Shareholding
27th May 201610:30 amRNSResult of AGM
26th May 201610:59 amRNSAmitsoq Project Update
29th Apr 20163:30 pmRNSPublication of Annual Report and Notice of AGM
25th Apr 20167:00 amRNSFinal Results
14th Apr 201611:58 amRNSAmitsoq Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.