Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0675
Bid: 0.065
Ask: 0.07
Change: -0.0025 (-3.57%)
Spread: 0.005 (7.692%)
Open: 0.07
High: 0.07
Low: 0.0675
Prev. Close: 0.07
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

18 Jul 2018 14:00

RNS Number : 0569V
Alba Mineral Resources PLC
18 July 2018
 

 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Portland Extended Flow Test ("EWT"): Well Clean-Up Phase Complete, Dry Oil Flows to Surface,

Horse Hill-1 Oil Discovery, PEDL137, Weald Basin, UK

 

Highlights:

 

· Initial Portland well "clean-up" phase completed successfully

· Light sweet crude oil (36 API) and associated solution gas flowed sustainably via pump and natural flow to surface over a 4-day period to date. Oil contains no metered water content (i.e. "dry oil")

· Metered daily oil rates to date equal to or exceed 2016 values. Highest observed hourly rate equivalent to an implied daily rate of 352 barrels of oil per day ("bopd"). Corresponding metered solution gas volumes are up to an implied rate of 30,000 cu ft per day.

· Flow has not yet been optimised for maximum sustainable flow rates

· First tanker containing 214 barrels of dry oil exported to BP's Hamble oil terminal

· Initial analysis indicates well productivity unaffected by 2 year shut-in period since 2016

· Following a planned 24-hour shut in (i.e. pressure build-up test) the first of three planned Portland test sequences will commence

 

Alba (London AIM: ALBA) is pleased to announce that it has been informed by Horse Hill Developments Ltd ("HHDL"), the operator of the Horse Hill-1 ("HH-1") Kimmeridge and Portland oil discovery, that the initial well "clean-up" phase of the Portland extended well test ("EWT") programme has been completed according to plan. Over the past four days, the well has delivered a sustained dry oil and solution gas flow to surface via pump and natural flow.

 

Alba holds an 11.765% beneficial interest in licence PEDL137 containing the HH-1 oil discovery.

 

Alba has been informed by HHDL that:

 

· Observed metered Portland flow rates to date are broadly equivalent to, or exceed, those recorded during the short duration 2016 test. The highest recorded hourly metered rate to date, equates to an implied daily rate of 352 bopd and was achieved using a 20/64" choke, a notably more restricted setting than the 64/64" choke used in 2016. Corresponding solution gas flows have been measured up to an implied rate of 30,000 cubic feet per day. Note that, to date, flow has not yet been optimised for maximum sustainable production rates, this will follow in the subsequent test sequences.

 

· Several periods of sustained natural flow (i.e. flow to surface without pumping) have also been observed over the past few days, with the most productive period producing an implied daily dry oil rate of 228 bopd over a two-hour period.

 

· Initial reservoir parameter analysis indicates that the Portland is performing very well compared to the productivity measured in 2016 prior to temporarily shutting in and suspending the well.

 

· To date a total of 463 barrels of light sweet 36 API crude have been recovered to surface during the clean-up period, together with all 141 barrels of completion and kill fluids (i.e. saline water) used to suspend the well after the 2016 well test.

 

Forward EWT Plans

 

The well will now be shut in for a planned 24-hour pressure build-up test. Operations will then include further flow parameter optimisation, followed by the first of three planned flow sequences designed to assess whether the Portland oil pool contains a commercially viable volume of oil. The first test sequence will likely include an optimised maximum rate test, prior to choking back the well to provide the steady state flow conditions necessary to determine the Portland oil pool's connected oil volume. Note that in order to collect the required data during these steady state flow periods, rates will likely be below any future optimised production rates.

 

Testing of each of the Kimmeridge Limestone 4 ("KL4") and KL3 oil pools will follow completion of the Portland test sequence.

 

Extended Well Test ("EWT") Overview

As the 2016 short flow test campaign established commercially viable initial flow rates for each of the Portland, KL4 and KL3 zones, the 2018 EWT's prime goal is to confirm that the wellbore is connected to a commercially viable oil volume within one or more of the three zones.

 

The long-term reservoir performance data is also expected to provide the necessary data to enable, for the first time, Petroleum Resources Management System compliant Kimmeridge and Portland reserve figures to be estimated at Horse Hill.

 

Each test sequence will include a short, optimised rate test, together with a sequence of "choked back" (i.e. reduced) steady-state flow periods necessary to obtain the data required to determine the connected oil volume within each zone. A series of associated long pressure build up tests are also planned. Oil produced from the EWT will be sold on the "spot" oil market and any revenues will be utilised to offset overall testing costs.

 

Qualified Person's Statement

 

The technical information contained in this announcement has been reviewed and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial), a petroleum geologist with over 45 years' experience in the management, exploration, development and production of oil and gas.

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

For further information please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman +44 20 7264 4366

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray +44 20 7213 0880

 

First Equity Limited (Broker)

Jason Robertson +44 20 7374 2212

 

 Yellow Jersey PR (Financial PR/ IR)

 

Tim Thompson / Henry Wilkinson

alba@yellowjerseypr.com

+44 77 1071 8649

Alba's Principal Operations & Investments

 

Oil & Gas

 

Horse Hill (Oil & Gas, UK): Alba holds an 18.1 per cent interest in Horse Hill Developments Limited, the company which has a 65 per cent participating interest and operatorship of the Horse Hill oil and gas project (licences PEDL 137 and PEDL 246) in the UK Weald Basin.

 

Brockham (Oil & Gas, UK): Alba has a direct 5 per cent interest in Production Licence 235, which comprises the previously producing onshore Brockham Oil Field.

 

Mining

 

Amitsoq (Graphite, Greenland): Alba owns a 90 per cent interest in the Amitsoq Graphite Project in Southern Greenland and has an option over the remaining 10 per cent.

 

Thule Black Sands (Ilmenite, Greenland): Alba owns 100 per cent of mineral exploration licences 2017/29 and 2017/39 in the Thule region, north-west Greenland.

 

Gold Mines of Wales (Gold, Wales, UK): Alba holds a 49 per cent interest in Gold Mines of Wales, the ultimate owner of the Clogau Gold project situated in the Dolgellau Gold Belt in Wales.

 

Inglefield Land (Multi-Commodity, Greenland): Alba owns 100 per cent of mineral exploration licences 2017/40 and 2018/15 in north-west Greenland.

 

Melville Bay (Iron Ore, Greenland): Alba is entitled to a 51 per cent interest in mineral exploration licence 2017/41 in Melville Bay, north-west Greenland. The licence area benefits from an existing inferred JORC resource of 67 Mt @ 31.4% Fe.

 

Web: www.albamineralresources.com 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCSFWFEAFASEDW
Date   Source Headline
24th Apr 202411:44 amRNSAlba Acquires Option - Replacement
24th Apr 202411:16 amRNSAlba Acquires Option
2nd Apr 20249:55 amRNSDolgellau Gold Exploration Update
28th Mar 20247:00 amRNSShare Placing
22nd Mar 20247:00 amRNSClogau Gold Mine Update
22nd Feb 20248:51 amRNSClogau Gold Mine and Regional Exploration Update
7th Feb 20247:00 amRNSGreenRoc ML Application and Licence Changes
31st Jan 20247:00 amRNSGreenRoc Update
18th Jan 202412:45 pmRNSClogau Gold Mine Update
22nd Dec 20237:00 amRNSClogau Gold Mine Update
11th Dec 202310:40 amRNSHorse Hill Update
11th Dec 20237:00 amRNSGrant of Share Options
6th Dec 202312:21 pmRNSOperational and Corporate Update
1st Dec 20233:45 pmRNSHolding(s) in Company
22nd Nov 20238:51 amRNSGROC Update: Share Placing
13th Nov 20237:00 amRNSOperational Update
31st Oct 20237:07 amRNSInvestee Company Update
16th Oct 20237:00 amRNSInvestee Company Update
16th Oct 20237:00 amRNSOperational Update
9th Oct 20237:00 amRNSInvestee Company Update
18th Sep 20237:54 amRNSClogau Operational Update
24th Aug 20231:30 pmRNSLive Webinar Event
17th Aug 20237:00 amRNSHalf-year Report
16th Aug 20237:39 amRNSGROC Update - Interim Results
16th Aug 20237:17 amRNSClogau Operational Update
9th Aug 202311:00 amRNSHolding(s) in Company
2nd Aug 20237:00 amRNSGROC Update - Share Placing
27th Jul 20237:00 amRNSGROC Update - Progress at Amitsoq Graphite Project
24th Jul 202311:30 amRNSCompletion of Broker Option & Operational Update
5th Jul 20237:35 amRNSShare Placing
4th Jul 20237:00 amRNSGrant of Dewatering Permits at Welsh Gold Mine
30th May 202310:19 amRNSResult of AGM
24th May 20237:00 amRNSInvestor Q&A Hosted by VOX Markets
15th May 20237:00 amRNSGROC Update: Amitsoq, Virtual Presentation and Q&A
5th May 20234:00 pmRNSPublication of 2022 Annual Report & Notice of AGM
5th May 20237:00 amRNSFinal Results
2nd May 20233:00 pmRNSAppointment of Sole Broker
28th Mar 20238:03 amRNSHorse Hill Update
27th Mar 20237:00 amRNSOperational Update
24th Mar 20234:35 pmRNSPrice Monitoring Extension
24th Mar 20237:00 amRNSGROC Update - Full Year Results
13th Mar 20236:22 pmRNSHolding(s) in Company
6th Mar 20237:00 amRNSGROC update: MoU with Norwegian Mining Group, LNS
1st Mar 20232:00 pmRNSPrice Monitoring Extension
8th Feb 20232:05 pmRNSSecond Price Monitoring Extn
8th Feb 20232:00 pmRNSPrice Monitoring Extension
8th Feb 20237:00 amRNSGROC Update
23rd Jan 20237:00 amRNSGROC:Near Three Times Increase in Amitsoq Resource
20th Jan 20231:54 pmRNSOperational Update
20th Jan 20237:00 amRNSGROC Update - Project Updates

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.