Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Alba Mineral Resources: Clogau & Lithium Option Update

Alba Mineral Resources: Clogau & Lithium Option Update

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0625
Bid: 0.055
Ask: 0.07
Change: 0.00 (0.00%)
Spread: 0.015 (27.273%)
Open: 0.0625
High: 0.0625
Low: 0.0625
Prev. Close: 0.0625
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Brockham Update

11 May 2017 11:00

RNS Number : 8649E
Alba Mineral Resources PLC
11 May 2017
 

 Alba Mineral Resources plc

 ("Alba" or the "Company")

 

 

 

FDP Addendum submitted to commence production

from Brockham X4Z Kimmeridge layers

 

The Company is pleased to announce that it has been advised the Operator, Angus Energy plc ("Angus Energy" or the "Operator"), that, following consultation with the UK's Oil & Gas Authority (OGA), it has submitted the required Field Development Plan (FDP) Addendum to commence production from the Kimmeridge layers at its Brockham Oil Field, Production Licence 235. In addition to the standard HSE consent for any well operations, Angus Energy advises that the FDP Addendum approval from the OGA is the sole regulatory approval required to produce hydrocarbons from the Kimmeridge layers in addition to the existing Portland production.

The Company will update investors once it is informed that the OGA has approved the FDP Addendum.

In addition, the Company has also been advised by the Operator of the following additional information and updates pertaining to the planning-related matters referred to in the Company's announcement on 10 March 2017:

· Following Angus Energy's RNS dated 10 March 2017, Angus Energy's guidance from 10 March 2017 is unchanged.

 

· Following various press reports and speculation pertaining to the BR-X4Z sidetrack, the legal status of said sidetrack and the future of production from the Brockham Oil Field, for the avoidance of any doubt Angus Energy has taken the precaution of obtaining additional legal review from Queen's Counsel.

 

· Queen's Counsel (the "QC") has confirmed her considered view that well BR-X4 (the donor well of the X4Z sidetrack, also known as well no. 3) has planning permission until 2036. Similarly, the QC confirms that the sidetrack to Well BR-X4, drilled in January 2017, is authorised by the 2006 planning permission.

 

· With the review completed, Angus Energy highlights below the potential cause for any perceived misunderstanding. Although not material in its own right, a mismatch of well numbering in prior administrative paperwork provided to Angus Energy appears to have allowed some confusion to arise as to the actual operations at the Brockham Oil Field. The key points highlighted by Angus Energy are as follows:

 

· As stated in Angus Energy's admission document to AIM, it was the objective to drill a sidetrack from the BR-X4 well to ensure the continued use and production from the Portland reservoir and assess the hydrocarbon production potential from the Kimmeridge layers and Corallian section.

 

· During the preparation phase of the drilling operation, Angus Energy detected that the surface infrastructure of the BR-X4 well did not match its expected subsurface composition but instead, based on the documentation available to Angus Energy, appeared to be the original Brockham-X1 well. Angus Energy acquired the Brockham Oil Field in 2012 and had not re-entered either the BR-X4 or Brockham-X1 well before commencement of these operations, so this was the first time this apparent mismatch in surface and subsurface composition had come to light.

 

· In addition to necessary maintenance, re-entry of the original Brockham-X1 well also allowed for the proper assessment of the layers of interest.

 

· The Brockham site had the benefit of existing planning permissions granted by Surrey County Council (SCC) and the required approvals from the EA, HSE and OGA for the maintenance work, re-entry and/or planned sidetrack, therefore the subsurface assessment continued. The re-entry with Measurement While Drilling (MWD) tools confirmed that the well that had been entered was indeed BR-X4 rather than Brockham-X1.

 

· Best practice for operational safety dictated that only when operations were finished and the well was safely cased off could Angus Energy determine the root cause of the well numbering confusion. Angus Energy determined that the mismatch was caused by an undocumented, non-standard, spool piece which was installed by the previous owners of the field and resulted in the 'mislabelling' of the well head.

 

· No matter the determination by Angus Energy, whether it was a re-entry of Brockham-X1 or a sidetrack of BR-X4, either operation was fully permitted within Angus Energy's regulatory approvals from the relevant authorities. It should be noted, that a sidetrack is a component of a drilled well. It is not a well and cannot be created or exist independent of the actual well.

 

· Angus Energy has been transparent throughout its operations. As such, it apprised the SCC of the documentation discrepancy as discovered during the January operations.

 

· Prior to the confusion over well numbering, in December 2016 the County Council gave advice that any new well was not to be drilled into 'any different geological formations or to a deeper depth or into any undrilled area than already drilled to'''. The geological area of interest was already drilled and defined by the existing permits for the wells and their inclusive sidetracks. Taken in the context of the actual communications, this letter is unrelated to the operations in January.

 

· For reference, the original Brockham-X1 well was drilled by BP to a total depth of 2,070m Total Vertical Depth (TVD) while the X4Z sidetrack only reached a depth of 1,391m TVD. Well within the constraints of the existing geological envelope of operations.

 

· Despite the misleading press reports, no new well was drilled nor were any operations conducted into any different geological formations, at a deeper depth or in any undrilled area.

 

· Upon OGA approval, Angus Energy plans to put this well into production as soon as possible.

 

Michael Nott, Alba's CEO, commented:

"We are very pleased to report that the Field Development Plan (FDP) Addendum has now submitted to the OGA to commence production from the Kimmeridge layers at the Brockham Oil Field. We await further updates from the Operator, Angus Energy, with great interest."

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

For further information please contact:

 

Alba Mineral Resources plc

Michael Nott, CEO

 

 

+44 20 7264 4366

Cairn Financial Advisers LLP

James Caithie / Liam Murray

 

+44 20 7213 0880

 

Dowgate Capital Stockbrokers Limited

Jason Robertson / Neil Badger

 

+44 1293 517744

 

 

About Alba

Alba holds a 15 per cent interest in Horse Hill Developments Limited, the company which has a 65 per cent participating interest and operatorship of the Horse Hill oil and gas project (licences PEDL 137 and PEDL 246) in the UK Weald Basin. Alba also has a direct 5% interest in Production Licence 235, which comprises the producing onshore Brockham Oil Field.

Alba owns a 90 per cent interest in the Amitsoq Graphite Project in Southern Greenland and has an option over the remaining 10 per cent.

In addition, the Company has 100 per cent of the Limerick base metal project in the Republic of Ireland and has applied for the reissue of a uranium permit in northern Mauritania, centred on known uranium-bearing showings.

Alba continues actively to review and discuss numerous other project opportunities which have value-enhancing potential for the Company whether by bolt-on or stand-alone acquisition, farm in or joint venture.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUAVKRBOAVARR
Date   Source Headline
2nd Apr 201511:04 amRNSHolding(s) in Company
30th Mar 201510:34 amRNSHolding(s) in Company
19th Mar 201510:19 amRNSHolding(s) in Company
18th Mar 20157:00 amRNSUpdate on Horse Hill discovery, UK Weald Basin
16th Mar 20157:00 amRNSPlacing to raise £500,000
12th Mar 201512:30 pmRNSAcquisition of Further Interest in Horse Hill
27th Feb 20151:50 pmRNSDirector/PDMR Shareholding
23rd Feb 20154:22 pmRNSHolding(s) in Company
16th Feb 20157:00 amRNSIssue of Equity
13th Jan 20151:55 pmRNSResult of GM
19th Dec 20147:00 amRNSPublication of Circular and Notice of GM
17th Dec 201412:52 pmRNSHorse Hill-1 Oil Discovery Update
5th Nov 20148:00 amRNSHorse Hill-1 Provisional Results at TD
29th Oct 201410:35 amRNSHolding(s) in Company
24th Oct 20147:00 amRNSPortland Oil Discovery, Horse Hill-1, Weald Basin
16th Oct 201411:30 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
13th Oct 20145:27 pmRNSDirector's Dealing
6th Oct 20147:00 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
29th Sep 201411:00 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
24th Sep 20141:00 pmRNSDrilling Update, Horse Hill-1, Weald Basin UK
18th Sep 20142:00 pmRNSUpdate, Horse Hill-1, Weald Basin UK
17th Sep 20143:06 pmRNSHolding(s) in Company
4th Sep 20142:14 pmRNSIncrease in Horse Hill Area Acreage Holding
4th Sep 20141:35 pmRNSChange of business address and phone number
3rd Sep 201410:04 amRNSIssue of Equity & Director's Dealing (transfer of
3rd Sep 20147:00 amRNSDrilling commences at Horse Hill
15th Aug 20147:00 amRNSChange of Adviser
7th Aug 20143:05 pmRNSHolding(s) in Company
6th Aug 201412:00 pmRNSHorse Hill Update
28th Jul 20147:00 amRNSPlacing
21st Jul 20147:00 amRNSHalf Yearly Report
21st Jul 20147:00 amRNSHorse Hill Update
11th Jul 20147:00 amRNSInvestment in UK Onshore Oil and Gas Project
9th Jul 20144:00 pmRNSHolding(s) in Company
9th Jun 20147:00 amRNSLimerick Licence Update
30th May 201410:37 amRNSResult of AGM
29th May 20147:00 amRNSShare Placing
30th Apr 20142:23 pmRNSNotice of AGM and Posting of Report and Accounts
28th Apr 20147:00 amRNSFinal Results
27th Mar 20149:16 amRNSResult of EGM
4th Mar 20147:00 amRNSProposed Subscription and Directorate Change
11th Dec 201311:11 amRNSChange of Registered Office
19th Nov 20137:00 amRNSIssue of Equity
19th Sep 20133:13 pmRNSIssue of Equity & Warrants - Replacement
19th Sep 20137:00 amRNSIssue of Equity & Warrants
19th Aug 20137:00 amRNSHalf Yearly Report
28th May 201311:28 amRNSResult of AGM
1st May 201312:03 pmRNSNotice of AGM and Posting of Report and Accounts
26th Apr 201311:00 amRNSFinal Results
18th Jan 20137:00 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.