Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Alba Mineral Resources: Clogau & Lithium Option Update

Alba Mineral Resources: Clogau & Lithium Option Update

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0625
Bid: 0.055
Ask: 0.07
Change: 0.00 (0.00%)
Spread: 0.015 (27.273%)
Open: 0.0625
High: 0.0625
Low: 0.0625
Prev. Close: 0.0625
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Brockham Update

11 May 2017 11:00

RNS Number : 8649E
Alba Mineral Resources PLC
11 May 2017
 

 Alba Mineral Resources plc

 ("Alba" or the "Company")

 

 

 

FDP Addendum submitted to commence production

from Brockham X4Z Kimmeridge layers

 

The Company is pleased to announce that it has been advised the Operator, Angus Energy plc ("Angus Energy" or the "Operator"), that, following consultation with the UK's Oil & Gas Authority (OGA), it has submitted the required Field Development Plan (FDP) Addendum to commence production from the Kimmeridge layers at its Brockham Oil Field, Production Licence 235. In addition to the standard HSE consent for any well operations, Angus Energy advises that the FDP Addendum approval from the OGA is the sole regulatory approval required to produce hydrocarbons from the Kimmeridge layers in addition to the existing Portland production.

The Company will update investors once it is informed that the OGA has approved the FDP Addendum.

In addition, the Company has also been advised by the Operator of the following additional information and updates pertaining to the planning-related matters referred to in the Company's announcement on 10 March 2017:

· Following Angus Energy's RNS dated 10 March 2017, Angus Energy's guidance from 10 March 2017 is unchanged.

 

· Following various press reports and speculation pertaining to the BR-X4Z sidetrack, the legal status of said sidetrack and the future of production from the Brockham Oil Field, for the avoidance of any doubt Angus Energy has taken the precaution of obtaining additional legal review from Queen's Counsel.

 

· Queen's Counsel (the "QC") has confirmed her considered view that well BR-X4 (the donor well of the X4Z sidetrack, also known as well no. 3) has planning permission until 2036. Similarly, the QC confirms that the sidetrack to Well BR-X4, drilled in January 2017, is authorised by the 2006 planning permission.

 

· With the review completed, Angus Energy highlights below the potential cause for any perceived misunderstanding. Although not material in its own right, a mismatch of well numbering in prior administrative paperwork provided to Angus Energy appears to have allowed some confusion to arise as to the actual operations at the Brockham Oil Field. The key points highlighted by Angus Energy are as follows:

 

· As stated in Angus Energy's admission document to AIM, it was the objective to drill a sidetrack from the BR-X4 well to ensure the continued use and production from the Portland reservoir and assess the hydrocarbon production potential from the Kimmeridge layers and Corallian section.

 

· During the preparation phase of the drilling operation, Angus Energy detected that the surface infrastructure of the BR-X4 well did not match its expected subsurface composition but instead, based on the documentation available to Angus Energy, appeared to be the original Brockham-X1 well. Angus Energy acquired the Brockham Oil Field in 2012 and had not re-entered either the BR-X4 or Brockham-X1 well before commencement of these operations, so this was the first time this apparent mismatch in surface and subsurface composition had come to light.

 

· In addition to necessary maintenance, re-entry of the original Brockham-X1 well also allowed for the proper assessment of the layers of interest.

 

· The Brockham site had the benefit of existing planning permissions granted by Surrey County Council (SCC) and the required approvals from the EA, HSE and OGA for the maintenance work, re-entry and/or planned sidetrack, therefore the subsurface assessment continued. The re-entry with Measurement While Drilling (MWD) tools confirmed that the well that had been entered was indeed BR-X4 rather than Brockham-X1.

 

· Best practice for operational safety dictated that only when operations were finished and the well was safely cased off could Angus Energy determine the root cause of the well numbering confusion. Angus Energy determined that the mismatch was caused by an undocumented, non-standard, spool piece which was installed by the previous owners of the field and resulted in the 'mislabelling' of the well head.

 

· No matter the determination by Angus Energy, whether it was a re-entry of Brockham-X1 or a sidetrack of BR-X4, either operation was fully permitted within Angus Energy's regulatory approvals from the relevant authorities. It should be noted, that a sidetrack is a component of a drilled well. It is not a well and cannot be created or exist independent of the actual well.

 

· Angus Energy has been transparent throughout its operations. As such, it apprised the SCC of the documentation discrepancy as discovered during the January operations.

 

· Prior to the confusion over well numbering, in December 2016 the County Council gave advice that any new well was not to be drilled into 'any different geological formations or to a deeper depth or into any undrilled area than already drilled to'''. The geological area of interest was already drilled and defined by the existing permits for the wells and their inclusive sidetracks. Taken in the context of the actual communications, this letter is unrelated to the operations in January.

 

· For reference, the original Brockham-X1 well was drilled by BP to a total depth of 2,070m Total Vertical Depth (TVD) while the X4Z sidetrack only reached a depth of 1,391m TVD. Well within the constraints of the existing geological envelope of operations.

 

· Despite the misleading press reports, no new well was drilled nor were any operations conducted into any different geological formations, at a deeper depth or in any undrilled area.

 

· Upon OGA approval, Angus Energy plans to put this well into production as soon as possible.

 

Michael Nott, Alba's CEO, commented:

"We are very pleased to report that the Field Development Plan (FDP) Addendum has now submitted to the OGA to commence production from the Kimmeridge layers at the Brockham Oil Field. We await further updates from the Operator, Angus Energy, with great interest."

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

For further information please contact:

 

Alba Mineral Resources plc

Michael Nott, CEO

 

 

+44 20 7264 4366

Cairn Financial Advisers LLP

James Caithie / Liam Murray

 

+44 20 7213 0880

 

Dowgate Capital Stockbrokers Limited

Jason Robertson / Neil Badger

 

+44 1293 517744

 

 

About Alba

Alba holds a 15 per cent interest in Horse Hill Developments Limited, the company which has a 65 per cent participating interest and operatorship of the Horse Hill oil and gas project (licences PEDL 137 and PEDL 246) in the UK Weald Basin. Alba also has a direct 5% interest in Production Licence 235, which comprises the producing onshore Brockham Oil Field.

Alba owns a 90 per cent interest in the Amitsoq Graphite Project in Southern Greenland and has an option over the remaining 10 per cent.

In addition, the Company has 100 per cent of the Limerick base metal project in the Republic of Ireland and has applied for the reissue of a uranium permit in northern Mauritania, centred on known uranium-bearing showings.

Alba continues actively to review and discuss numerous other project opportunities which have value-enhancing potential for the Company whether by bolt-on or stand-alone acquisition, farm in or joint venture.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUAVKRBOAVARR
Date   Source Headline
2nd Nov 20129:38 amRNSTotal Voting Rights
10th Oct 201211:37 amRNSIssue of Equity
30th Aug 20127:00 amRNSHalf Yearly Report
13th Aug 201212:14 pmRNSHolding(s) in Company
31st May 20122:10 pmRNSResult of AGM
1st May 20127:00 amRNSFinal Results
23rd Apr 20123:46 pmRNSIssue of Equity
6th Feb 20127:00 amRNSJoint Venture, Issue of Equity & Trading Update
7th Dec 20117:00 amRNSExploration Option and Joint Venture Agreement
31st Aug 20117:00 amRNSHalf Yearly Report
6th May 20117:00 amRNSFinal Results
14th Jan 20114:35 pmRNSHolding(s) in Company
3rd Nov 20107:00 amRNSNominated adviser and broker change of name
31st Aug 201011:45 amRNSInterim Results
24th May 20103:07 pmRNSResult of AGM
30th Apr 20107:00 amRNSFinal Results
22nd Dec 20097:00 amRNSChange of Adviser and Trading & Financing Update
28th Aug 20097:00 amRNSHalf Yearly Report
28th Aug 20097:00 amRNSTotal Voting Rights And Capital
3rd Aug 20097:30 amRNSIssue of Equity and Directors Dealing
29th Jun 20099:47 amRNSResult of AGM
28th May 20097:00 amRNSFinal Results
7th Jan 200911:44 amRNSResult of EGM
12th Dec 200812:41 pmRNSPosting of Circular
26th Aug 20087:00 amRNSInterim Results
1st Aug 200812:46 pmRNSIssue of Equity
1st Aug 200812:45 pmRNSResult of AGM
7th Jul 20087:00 amRNSAward Of Exploration Permits
28th May 200811:08 amRNSFinal Results
14th Apr 20087:00 amRNSChange of Adviser
7th Apr 20085:01 pmRNSAdviser Change of Name
28th Feb 20087:01 amRNSFieldwork Recommences
15th Feb 200812:25 pmRNSHolding(s) in Company
13th Dec 20072:17 pmRNSTrading Statement
30th Nov 20074:48 pmRNSTotal Voting Rights
23rd Nov 20072:48 pmRNSHolding(s) in Company
22nd Nov 200712:30 pmRNSIssue of Equity
9th Nov 20073:29 pmRNSIssue of Equity
9th Nov 20073:20 pmRNSHolding(s) in Company
7th Nov 200711:04 amRNSIssue of Equity
11th Oct 200712:18 pmRNSTrading Statement
30th Aug 20074:35 pmRNSHalf Yearly Report
20th Aug 20075:55 pmRNSHolding(s) in Company
16th Aug 200710:06 amRNSAIM Rule 26 - Company Website
6th Aug 20075:01 pmRNSResult of AGM
16th May 20079:19 amRNSFinal Results
27th Apr 200711:07 amRNSTrading Statement
4th Apr 200711:20 amRNSDirectorate Change
27th Mar 20077:02 amRNSDirectorate Change
8th Mar 20071:00 pmRNSMauritania Fieldwork Begins

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.