The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.80
Bid: 0.75
Ask: 0.85
Change: 0.00 (0.00%)
Spread: 0.10 (13.333%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.80
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Updated Mine Plan Materially Increases Production

12 May 2020 10:00

 

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

12 May 2020

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Updated Mine Plan Materially Increases Production

Armadale Capital plc (LON: ACP), the AIM quoted investment group focused on natural resource projects in Africa, is pleased to provide details of further improvements to the Mine Schedule for the Mahenge Liandu Graphite Project (‘Mahenge’ or ‘the Project’) in south-east Tanzania, which was completed by experienced graphite specialists BatteryLimits. Following completion of an updated Mine Schedule using a higher-grade cut off of 9% TGC and a higher strip ratio of 1.95:1, and a revised expansion schedule, the Company is pleased to announce an increased production profile, increasing the average annual output to 109ktpa of concentrate over life of mine, which is a 30% increase on the recently completed Definitive Feasibility Study (‘DFS’).

Highlights

Completion of an updated Mine Schedule using a higher-grade cut off of 9% Total Graphitic Carbon (‘TGC’), a higher strip ratio of 1.95:1, revised expansion schedule and includes a proportion of high-grade Inferred material30% increase in average annual production of large flake high-purity graphite to 109ktpa compared to recently completed DFSHigher overall production from increased cut off of 9% TGC will materially increase annual production and has potential to significantly increase the US$358 million project NPV with minimal impact on the capexA higher-grade cut off is expected to allow the Company to maximise initial production and build lower grade stockpiles in subsequent yearsUpdated Feasibility Study based on updated Mine Schedule anticipated by the end of MayProduction profile planned to take advantage of increasing demand for graphite as the Electric Vehicle market rapidly expands

Armadale Chairman, Nick Johansen, commented: “The updated mine schedule demonstrates the exceptional potential of the Mahenge Liandu Graphite Project. The use of a higher-grade cut off and mining of a higher-grade material at an increased pace leaves significant scope for the Project to produce higher volumes of graphite over the 15 year mine life at a higher EBITDA margin, thus enhancing its overall near-term upside.

“The Project has a relatively long life of mine, low cost of production and has now been significantly de-risked at a time of rapidly increasing demand for large-flake graphite. As such it represents an attractive opportunity for investors who wish to gain exposure at a crucial inflection point in its development.

“The detail from the recently completed Mine Schedule desktop studies is in the process of being worked into an upgraded Definitive Feasibility Study, which will be based upon a throughput of higher-grade material over a 15 year mine life, and we are expecting that it will have a significant impact on the results.

“In addition to this work, multiple workstreams are currently in progress including continued Detailed Design Engineering, the progressing of existing off-take agreements from MoUs to binding agreements, finalising of the Company’s application for a full Mining licence (and thus furthering major permitting milestones), and crucially, advancing discussions with potential debt finance partners and project level development funding for construction.

“Having delivered a number of key value accretive milestones in recent months, we look forward to maintaining this momentum in the near term in order to continue to build value for shareholders.”

Details

The Mahenge Project, graphite which recently delivered a Definitive Feasibility Study (‘DFS’) confirming Mahenge it as a long-life low-cost graphite project with a US$358 million NPV and an IRR of 91%. With the completion of an updated Mine Schedule using a higher-grade cut off of 9% TGC the average production increases 30% to 109 ktpa. This material increase in production is expected to have significant potential to further improve the already compelling economics at Mahenge, significantly uplifting average annual output with only incremental changes to the initial capex. New financial metrics for this will be included within Armadale’s updated Feasibility Study anticipated by the end of May.

The implication of the updated Mine Schedule is that more high-grade graphite will be processed over the life of mine, ultimately bolstering potential cashflow and enhancing the Project’s overall valuation, while allowing for the stockpiling of lower grade material for potential future processing.

The updated mine schedule is based on the following key changes;

Increase in cut off grade to 9% TGCRevision of phased production expansion profile with stage 2 expansion moved forward from year 5 to year 4 resulting in average stage 1 production of 61 ktpa increasing to 121 ktpa in year 4.Inclusion of a proportion of high-grade inferred material

Area

Unit

DFS results

Update

Mining inventory

(Mt)

14.40

13.42

Measured and indicated

(Mt)

14.40

10.84

Inferred

(Mt)

 

2.58

Mine grade

(TGC%)

9.90

12.50

Strip ratio

 

1.10

1.95

Table 1: The updated mining inventory

The revised production profile is shown in table 2 which now starts at 53.3ktpa ramping up to an average rate of 121ktpa after year 4.

Year

Mill Feed Mt

Head Grade TGC %

Concentrate Kt

Y1

0.4

14.5%

53.3

Y2

0.5

12.1%

71.0

Y3

0.5

12.4%

59.1

Y4

1.0

13.4%

121.5

Y5

1.0

12.1%

131.3

Y6

1.0

11.9%

118.6

Y7

1.0

13.1%

116.3

Y8

1.0

11.7%

128.5

Y9

1.0

12.4%

115.1

Y10

1.0

12.5%

122.0

Y11

1.0

12.6%

122.1

Y12

1.0

12.2%

123.6

Y13

1.0

12.3%

119.1

Y14

1.0

12.5%

120.2

Y15

1.0

13.1%

121.9

Table 2: Updated Production Schedule by Year.

Mahenge Liandu Graphite Project, Tanzania

Armadale’s wholly-owned Mahenge Liandu Graphite Project is located in a highly prospective region, with a high-grade JORC compliant indicated and inferred mineral resource estimate announced February 2018 – 59.5Mt at 9.8% TGC. This includes 11.5Mt @ 10.5% Measured 32.Mt Indicted at 9.6% and 15.9Mt at 9.8% TGC, making it one of the largest high-grade resources in Tanzania.

The work to date has demonstrated the Project’s potential as a commercially viable deposit, with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

A recently completed Definitive Feasibility Study confirmed Mahenge as a long-life low-cost graphite project with a US$358m NPV and IRR of 91% based on a two-stage expansion strategy comprising:

Stage One – processing plant and infrastructure at a nominal design basis rate of 0.4-0.5 Mt/pa to produce a nominal 60,000t/pa graphite concentrate in the first four years of productionStage Two – a second 0.5 Mt/y plant and associated additional infrastructure doubling throughput to 1 Mt/y from Year 5 of operation

The DFS shows that Armadale can be a significant low-cost supplier to the graphite industry with the potential to generate pre-tax cashflows of US$882m over an initial 17 year mine-life and scope for further improvement as this utilises just 25% of the current resource, which remains open in multiple directions.

Projected timeline to first production is expected to be approximately 10-12 months from the start of construction and the capital cost estimate for Stage 1 is US$38.6m, which includes a contingency of U$S4.1m or 15% of total direct capital cost, with a 1.6 year payback for Stage 1 (after tax) based on an average sales price of US$1,179/t. Stage 2 expansion is expected to be funded from cashflow.

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:

 

Armadale Capital Plc

Nick Johansen, Non-Executive Director

Tim Jones, Company Secretary

+44 (0) 20 7236 1177

Nomad and broker: FinnCap Ltd

Christopher Raggett / Edward Whiley

+44 (0) 20 7220 0500

Joint Broker: SI Capital Ltd

Nick Emerson

+44 (0) 1483 413500

Press Relations: St Brides Partners Ltd

Charlotte Page / Beth Melluish

+44 (0) 20 7236 1177

 

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 59.48Mt @ 9.8% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in, include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com.

View source version on businesswire.com: https://www.businesswire.com/news/home/20200512005388/en/

Copyright Business Wire 2020

Date   Source Headline
13th Oct 20147:00 amBUSFurther Upgrade of JORC Resource at Mpokoto Gold Project
1st Oct 20149:15 amBUSChange of Registered Office
25th Sep 20149:00 amBUSCompletion of Acquisition of Kisenge Limited
15th Sep 20147:35 amBUSDirector Shareholding
11th Sep 20147:00 amBUSInterim Results for the six months ended 30 June 2014
4th Sep 20147:00 amBUSPositive Assay Results Underpin Value of Mpokoto Gold Project
1st Sep 20149:02 amBUSAcquisition of Kisenge Limited
25th Jun 20142:45 pmBUSConversion of MRI Debt
25th Jun 201412:00 pmBUSResult of AGM
18th Jun 20147:00 amBUSCommenced Drilling at Mpokoto Gold Project
2nd Jun 20147:00 amBUSPosting of Report & Accounts and Notice of AGM
20th May 201412:45 pmBUSDirector Shareholding
19th May 20147:00 amBUSUnaudited Preliminary Results for the Year Ended 31 December 2013
12th May 20149:00 amBUSUpdate on MRI Operations
7th Apr 20147:00 amBUSStrong Financial Returns Demonstrated from Mpokoto Scoping Study
2nd Apr 20147:00 amBUSUpgrade of JORC Resource at Mpokoto Gold Project
31st Mar 20147:00 amBUSMining Licence Application & Delivery of Scoping Study
12th Mar 20147:00 amBUSPlacing to raise £525,000
10th Mar 20149:00 amBUSPortfolio Investment
21st Feb 201410:30 amBUSMRI - Production Update, Offtake and Completion of Financing
19th Feb 20149:00 amBUSUpdate on the Mpokoto Gold Project
30th Jan 20147:00 amBUSHolding(s) in Company
20th Jan 20147:00 amBUSMRI Coal Briquetting Operation to Commence Full Commercial Production
10th Jan 20142:30 pmBUSInvestment Portfolio Update
20th Dec 20137:00 amBUSHolding(s) in Company
19th Dec 20137:00 amBUS35% Increase of JORC Resource Upgrade at Mpokoto Gold Project
12th Dec 20137:00 amBUSAcquisition of Loan
5th Dec 201311:00 amBUSPlacing to raise £550,000
26th Nov 20134:00 pmBUSHolding(s) in Company
25th Nov 20137:00 amBUSHigh Grade Gold Mineralisation Demonstrated at Mpokoto Gold Project
25th Nov 20137:00 amBUSHolding(s) in Company
18th Nov 201310:48 amBUSMRI Commencement of Coal Briquetting Operations in South Africa
15th Nov 20137:01 amBUSAcquisition
31st Oct 201311:19 amBUSHolding(s) in Company
16th Oct 20137:00 amBUSBriquetting Update
14th Oct 201310:24 amBUSHolding(s) in Company
4th Oct 20137:00 amBUSGrant of Options
30th Sep 201310:09 amBUSIssue of Equity
25th Sep 20137:00 amBUSHalf-yearly Report
23rd Sep 20132:27 pmBUSHolding(s) in Company
23rd Sep 201310:46 amBUSResult of EGM
6th Sep 201310:14 amBUSNotice of EGM - Replacement
6th Sep 20137:00 amBUSNotice of EGM
28th Aug 201312:08 pmBUSHolding(s) in Company
21st Aug 20137:00 amBUSInvestment
30th Jul 201310:25 amBUSPlacing of Shares
19th Jul 201311:34 amBUSInvestment Update
11th Jul 201310:15 amBUSDirectorate Change
5th Jul 20137:00 amBUSNew Website
2nd Jul 20133:15 pmBUSChange of Name

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.