Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.80
Bid: 0.75
Ask: 0.85
Change: 0.00 (0.00%)
Spread: 0.10 (13.333%)
Open: 0.80
High: 0.80
Low: 0.80
Prev. Close: 0.80
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on the Mpokoto Gold Project

19 Feb 2014 09:00

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

19 February 2014

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Update on the Mpokoto Gold Project

Armadale Capital Plc (‘Armadale’ or ‘the Company’), the AIM quoted investment company focused on natural resource projects in Africa, is pleased to provide an update on progress at the Mpokoto Gold Project in the Katanga Province in the south of the Democratic Republic of Congo (‘Mpokoto’ or ‘the Project’), which has a current Total Mineral Resource of 510,000oz gold (‘Au’) from 11.2 million tonnes (‘Mt’) @ 1.42g/t Au at a cut-off grade of 0.5g/t.

Highlights:

Acceleration of development at Mpokoto – Scoping Study and related metallurgical and environmental reports nearing completion in conjunction with the Mining Licence application, which is expected to be made by 31 March 2014 Highly encouraging initial results from metallurgical studies, which suggest weathered and oxide ore is amenable to gravity separation allowing for higher recoveries at a lower cost Gravity separation would considerably enhance the overall economics of the Project – targeting overall opex costs of less than US$650/oz Au produced for Phase 1 targeting the weathered ore Significant potential for further economic enhancement through resource upside – Exploration Target of 10Mt-15Mt at 1.2g/t-1.5g/t Au Defined development strategy to rapidly advance the Project through to low capex, low opex gold production in 24 months

Justin Lewis, Director of Armadale, said, “Our ambitious development strategy at our flagship Mpokoto Project is bearing fruit for the Company, with these latest results further enhancing the value of this asset and driving development forwards with the aim of commencing commercial production within 24 months. The highly encouraging initial metallurgical studies, which have confirmed that the weathered and oxide proportions of the ore are amenable to gravity separation and concentration, will allow us to further reduce our anticipated operating costs, something we regard as critical in the current gold price environment. With total opex costs targeted to be less than US$650 per oz of gold produced for Phase 1 targeting the weathered ore, our current modelling shows an extremely attractive net present value for the Project, at a significantly premium to the purchase price by Armadale. We very much look forward to updating shareholders with the key findings and parameters of the Scoping Study before 31 March 2014, and remain focused on further delineating gold resource ounces, together with completing the additional critical development work required to take Mpokoto into low cost commercial gold production.”

Mpokoto Gold Project Development

Mpokoto is located in the western part of the Katanga Province approximately 250km west of Kolwezi in the Democratic Republic of Congo, and approximately 25km from the Zambian border. The area is highly prospective, with local operators including Ivanplats Limited and Glencore Plc and since 1998, approximately US$20 million was spent on gold exploration at the Project.

Armadale continues to make strong progress towards the completion of its scoping study and related reports on the Project. Since completing an upgrade to the geological model and resource at the end of 2013, which led to a 35% increase in the overall resource to 510,000oz Au from 11.2Mt @ 1.42g/t Au at a cut-off grade of 0.5g/t, the Company has progressed with a number of further studies including metallurgical and environmental reports required to complete the scoping study. The scoping study and related reports will be incorporated into the Mining Licence Application, which is on course to be submitted by 31 March 2014.

The results received from the initial metallurgical studies undertaken over the past few months suggest that the weathered and oxide proportions of the ore are amenable to gravity separation and concentration. In particular the tests suggest that recoveries of up to 80% are achievable from this process. The advantage of this process is that as a result of the limited use of chemicals, such as cyanide, the overall cost of processing the ore is considerably reduced, with Armadale now targeting overall opex costs of less than US$650 per oz of gold produced for Phase 1 targeting the weathered ore. This will lead to a significant uplift in the overall value of the Project.

The Company anticipates publishing the results of its Scoping Study before 31 March 2014 that will include an initial estimate of operating and capital costs.

In addition to development work, the Company will also continue to assess the Resource upside potential of the Project, which has a total Exploration Target of between 10 and 15Mt at 1.2g/t-1.5g/t Au. The quantity and grade of the Exploration Target is conceptual and there has been insufficient exploration to define a Mineral Resource.

The potential for additional resources and reserves is strong. Should this target mineralisation be converted to Inferred and Indicated resources and then to reserves, it is likely that the Project throughput rate can be substantially upgraded. Resource delineation drilling programmes are planned to test the target potential.

Competent Person Statement

Scientific or technical information in this release has been reviewed by Andrew (Jim) Pooley PR Eng, BSc Eng (Hons), FSAIMM, Managing Director, of Bara Consulting Pty Ltd. Mr Pooley is a Fellow of the Southern African Institute of Mining and Metallurgy (SAIMM) and has 20 years’ experience, which is relevant to the style of mineralisation under consideration and to the activity which they are undertaking to qualify as Competent Persons, as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). Mr Pooley consents to the inclusion in this announcement of his name, in the form and context in which it appears.

**ENDS**

Enquiries:

Company

Justin Lewis, Director +61 439 162369

Charles Zorab +44 207 233 1462

Nomad and broker: finnCap Limited

Stuart Andrews/ Christopher Raggett +44 207 220 0500

Press relations: St Brides Media & Finance Ltd.

Susie Geliher/ Charlotte Heap +44 207 236 1177

More information can be found on the website www.armadalecapitalplc.com

Notes

Armadale Capital Plc is focussed on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth potential businesses where it can take an active role in their advancement.

Armadale currently holds a right to an 80% interest in the Mpokoto Gold Project in the Democratic Republic of Congo. Armadale are focused on proving up the resource potential of Mpokoto with a view to commencing commercial gold production in 2015.

Armadale also holds approximately a 40% interest in Mine Restoration Investments Ltd, a South African listed company, which aims to develop profitable operations within the South African mining industry through its coal briquetting operation in KwaZulu Natal and acid mine drainage technology in the Witwatersrand basins.

In addition, Armadale has a small portfolio of listed investments which are focused on gold production and exploration. The Directors continue to maintain an active acquisition strategy and will review investment opportunities that they believe have the potential to be accretive in terms of shareholder value.

Copyright Business Wire 2014

Date   Source Headline
2nd May 20249:30 amRNSUpdate on Canyon Silver Asset
24th Apr 20248:30 amRNSProposed Investment, Subscription & Board Changes
27th Feb 20242:45 pmRNSMahenge Project Update
19th Dec 202311:15 amRNSBlock listing Interim Review
29th Sep 20237:00 amRNSHalf-year Report
20th Jun 202310:38 amRNSResult of AGM
19th Jun 20237:00 amRNSBlock listing Interim Review
12th May 20237:00 amRNSFinal Results and Notice of AGM
13th Feb 20239:00 amRNSMahenge Project Update
19th Dec 20227:00 amRNSBlock listing Interim Review
29th Sep 20227:00 amRNSHalf-year Report
20th Jun 202210:45 amRNSResult of AGM
17th Jun 20223:30 pmRNSBlock listing Interim Review
23rd May 20227:00 amRNSFinal Results and Notice of AGM
3rd May 20227:00 amRNSIssue of Equity Under Block Admission Arrangements
1st Apr 20227:00 amRNSIssue of Equity Under Block Admission Arrangements
17th Mar 20223:20 pmRNSHolding(s) in Company
11th Mar 20222:45 pmRNSDirector/PDMR Shareholding and TVR
8th Feb 20228:15 amRNSAdvancing Mining Lease and Expanded Footprint
17th Dec 20217:00 amRNSBlock listing Interim Review
15th Dec 20219:30 amRNSManagement Team Enhanced With Key Appointment
1st Dec 20217:00 amRNSIssue of Equity Under Block Admission Arrangements
1st Nov 20217:00 amRNSIssue of Equity Under Block Admission Arrangements
1st Oct 20217:00 amRNSIssue of equity under block admission arrangements
29th Sep 20217:00 amRNSHalf-year Report
3rd Sep 20219:00 amRNSMahenge Mining Licence Granted
31st Aug 20217:00 amRNSNotification of Changes in Major Holdings
6th Aug 20211:25 pmRNSConversion of Loan Notes and Director Shareholding
28th Jun 202112:40 pmRNSBlock Admission & TVR
28th Jun 202112:18 pmRNSAGM Statement
17th Jun 20217:00 amRNSBlock listing Interim Review
28th May 20213:45 pmRNSSubscription and Investment Portfolio Update
28th May 20213:18 pmRNSFinal Results And Notice of AGM
22nd Apr 202110:00 amRNSCompletion of Test Work Program
12th Apr 20219:20 amRNSChange of Adviser
30th Mar 20219:58 amRNSESIA Approval from NEMC of Tanzania
24th Mar 20217:35 amRNSBoard Change
8th Mar 202112:36 pmRNSNotification of Changes in Major Holdings
17th Feb 20214:41 pmRNSSecond Price Monitoring Extn
17th Feb 20214:35 pmRNSPrice Monitoring Extension
10th Feb 202111:00 amRNSArmadale Reports Successful Chinese EPC Test-Work
11th Jan 202111:00 amRNSCSIRO Graphite Test Work Results
17th Dec 20207:00 amRNSBlock listing Interim Review
24th Nov 202012:03 pmRNSTest-Work Commenced with Leading EPC Contractor
20th Nov 20204:41 pmRNSSecond Price Monitoring Extn
20th Nov 20204:36 pmRNSPrice Monitoring Extension
13th Oct 202010:00 amBUSMahenge Graphite Project Update
6th Oct 20204:41 pmRNSSecond Price Monitoring Extn
6th Oct 20204:36 pmRNSPrice Monitoring Extension
29th Sep 20208:46 amBUSHalf-year Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.