Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.80
Bid: 0.75
Ask: 0.85
Change: 0.00 (0.00%)
Spread: 0.10 (13.333%)
Open: 0.80
High: 0.80
Low: 0.80
Prev. Close: 0.80
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Metallurgical Testwork at Mpokoto Gold Project

26 Nov 2014 07:00

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

26 November 2014

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Update on Metallurgical Testwork at Mpokoto Gold Project

Armadale, the AIM quoted investment company focused on natural resources projects in Africa, is pleased to announce a positive update on the metallurgical testwork programme for the Mpokoto Gold Project (‘Mpokoto’ or the ‘Project’) in the Katanga Province of the Democratic Republic of Congo which has demonstrated increased gold recoveries of 84% from transitional and fresh ore.

This follows the completion of metallurgical testwork on the deeper transitional and fresh ores. Further testwork is to be carried out over the next few months with a view to increasing the recovery of gold from the shallower oxide ore at Mpokoto.

Mpokoto has a current Total Mineral Resource of 678,000oz gold (‘Au’) from 14.58 million tonnes (‘Mt’) @ 1.45g/t Au at a cut-off grade of 0.5g/t. The Company has recently announced the results of an Expanded Scoping Study for Mpokoto which demonstrated a post-tax net present value of US$55.3m based upon a discount rate of 8% and a gold price of US$1,250/oz. The Project is subject to four Mining Licences which are valid for an initial term of 30 years from 30 September 2014.

Highlights:

Testwork demonstrated an increased gold recovery of 84% from the transitional and fresh ore (previously 81%) which totals more than 300,000 ounces Metallurgical testwork on oxide ore has previously demonstrated recoveries of 90% Anticipated recovery of 90% of contained gold from the oxide ores Further testwork on oxide ores is to be undertaken with the objective of further increasing recoveries – samples have been dispatched from Mpokoto Defined development strategy to rapidly advance the Project through to low capex, low opex gold production in H1 2016 – additional drilling is planned for early 2015 to further expand resource and overall size of Project

Justin Lewis, Director of Armadale, said, “The scope and scale of the Mpokoto Gold Project continues to grow and fuel our confidence that we will be able to deliver a low capex, low opex commercial gold mining project in the near future. The results of this metallurgical testwork further increase the anticipated gold recoveries achievable from the deeper transition and fresh ore. Higher recoveries will further improve the economics of the Project and lower the costs of producing gold on a unit basis.

“Mpokoto continues to offer highly attractive returns and near term production potential, with robust economics even at low gold prices, and we are focused on rapidly advancing this Project into production in H1 2016. The continued unlocking of the Project’s resource potential represents a major step within this development, and we now remain focused on completing further value enhancing milestones. Over the next few months we will be undertaking a drilling programme with the intention of further expanding the resource at Mpokoto as well as further metallurgical testwork, all of which will feed into a full feasibility study.

“With these initiatives in mind, I expect the remainder of the year to be highly active in terms of news flow.”

Summary of results of Metallurgical Testwork

Subsequent to the completion of metallurgical testwork on the oxide ores which showed a recovery of 90% of the contained gold, further metallurgical testwork has been undertaken to focus on the transition and fresh rock ore zones, which represent a target of over 300,000 ounces lying below the oxide ore and above the 120 metre below surface level. The results for this testwork have now been received.

The testwork programme incorporated semi-batch (low mass yield) gravity recovery as used for free gold, flotation of gravity tails, ultrafine milling of gravity tails prior to gravity amenability testing (GAT). The flotation concentrate was then cyanide leached.

The testwork demonstrated that gravity extraction using a Knelson Centrifugal Concentrator, following a grind to 80% passing 75 microns, recovered approximately 43% of the gold in the transition and fresh ore zone. Flotation of the gravity tailings, followed by fine grinding and intense cyanidation of the flotation concentrate, recovered a further 41% of the gold. Overall recovery was therefore 84%.

Low cost modular process equipment is available; this will allow the Project’s metallurgists to design additions to the initial oxide plant to treat the transition and fresh rock to recover up to 84% of the contained gold. The current Expanded Scoping Study has used a more conservative recovery of 81% pending confirmation of the recovery from the batch Knelson concentrator in pilot scale testwork.

As set out in the Expanded Scoping Study, the plant additions, required only after the oxide plant has been in operation for approximately 4 years, will have a capital cost of approximately US$13 million and will extend the life of the mine by over 5 years.

The testwork was carried out in the laboratories of Peacocke and Simpson in Harare, Zimbabwe. The consulting metallurgist overseeing the testwork and plant design for Armadale is Richard Way of Bara Consulting – a Johannesburg based mining consultancy firm.

Further Metallurgical Testwork

Over the next few months further testwork is being undertaken on the oxide ore. Further samples have recently been selected and are being dispatched to Peacocke and Simpson for further tests. The aim of these tests will be to confirm the design of the current process flowsheet and will also seek to further improve the current anticipated 90% recovery of gold from the oxide ores. Increasing the rate of recovery should result in a further reduction of operating costs per ounce of gold produced as well adding value to the overall Project.

About Mpokoto Gold Project

Mpokoto is located in the western part of the Katanga Province approximately 250km west of Kolwezi in the Democratic Republic of Congo, approximately 25km from the Zambian border. The area is highly prospective, with local operators including Ivanhoe Mines and Glencore Plc. Since 1998, approximately US$20 million has been spent on gold exploration at the Project.

Competent Person Statement:

Scientific or technical information in this release has been reviewed by Mr. Andrew (Jim) Pooley Pr Eng, BSc Eng (Hons), FSAIMM, Managing Director, of Bara Consulting Pty Ltd. Jim Pooley is a fellow of the Southern African Institute of Mining and Metallurgy and has over 19 years’ experience, which is relevant to the style of mineralisation under consideration and to the activity which he is undertaking to qualify as a Competent Person, as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). Mr. Jim Pooley consents to the inclusion in this announcement of the information, in the form and context in which it appears.

A copy of the announcement can be found on the Company’s website at www.armadalecapitalplc.com.

Glossary of Technical Terms

Au Gold
Fresh Depth of rock where the original mineralogy of the rock remains intact, without being affected by chemical or mechanical processes.
Gravity Separation A process in the treatment of ore whereby heavy mineral species such as gold are separated from the lighter minerals, such as quartz, by passing the ore through one of a variety of gravity separators.
g/t Grams per tonne
Knelson Centrifugal Concentrator A part of the process plant that undertakes Gravity Separation
Measured That part of a Mineral Resource for which quantity , grade, densities, shape and physical characteristics are estimated with sufficient confidence to support detailed mine planning and final evaluation of the economic viability of the deposit. A Measured classification is the highest classification level for Mineral Resource estimates.
Indicated That part of a Mineral Resource for which quantity , grade, densities, shape and physical characteristics are estimated with sufficient confidence to support mine planning and the evaluation of the economic viability of the deposit. An Indicated classification is of a lower confidence level than a Measured classification.
Inferred That part of a Mineral Resource for which quantity and grade are estimated on the basis of limited geological evidence and sampling. An Inferred classification is of a lower confidence level than an Indicated classification.
Oxide Shallow depth of rock where the original mineralogy of the rock is extensively broken down by the action of external agencies such as water percolation and chemical leaching.
oz Ounce
QAQC Quality Assurance and Quality Control
Transitional Shallow to intermediate depth of rock (generally
Weathering The process by which rocks are broken down and decomposed by the action of external agencies such as wind, rain, temperature changes, plants and bacteria.

**ENDS**

Enquiries:

CompanyJustin Lewis, Director +61 439 162369Charles Zorab +44 207 233 1462

Nomad and broker: finnCap LimitedStuart Andrews/ Christopher Raggett +44 207 220 0500

Press relations: St Brides Media & Finance Ltd.Susie Geliher/Charlotte Heap +44 207 236 1177

More information can be found on the website www.armadalecapitalplc.com

Notes

Armadale Capital Plc is focussed on investing in and developing a portfolio of investments, targeting the natural resources sector in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth potential businesses where it can take an active role in their advancement.

Armadale owns 80% of the Mpokoto Gold Project in the Democratic Republic of Congo. Armadale is focussed on proving up the resource potential of Mpokoto with a view to commencing commercial gold production.

Armadale also holds approximately a 30% interest in Mine Restoration Investments Ltd, a South African listed company, which aims to develop profitable operations within the South African mining industry through its coal briquetting operation in KwaZulu Natal.

In addition, Armadale has a small portfolio of listed investments which are focused on gold and copper production and exploration. The Directors continue to maintain an active acquisition strategy and will review investment opportunities that they believe have the potential to be accretive in terms of shareholder value.

Copyright Business Wire 2014

Date   Source Headline
19th Jul 20177:00 amBUSExploration Update at Mahenge Liandu Graphite Project, Tanzania
13th Jul 201712:01 pmBUSConvertible Note Update
4th Jul 20172:31 pmBUSTanzanian Legislation
26th Jun 20174:35 pmBUSResult of AGM
26th Jun 20177:00 amBUSAGM Statement
21st Jun 20177:00 amBUSExploration Update: Trenching Intercepts Wide Zones of High Grade Graphite
5th Jun 20177:00 amBUSUpdate on 2017 Exploration Programme at Mahenge Liandu Graphite Project
2nd Jun 20177:00 amBUSFinal Results
3rd May 20177:00 amBUSGraphite Concentrate Upgraded to Purity of up to 99.99% Graphitic Carbon
21st Apr 20179:31 amBUSExcellent Test Results for Mahenge Liandu Graphite Concentrate
29th Mar 20177:00 amBUS2017 Mahenge Liandu Exploration Programme Commenced: Targeting Resource Increase and Upgrade
28th Feb 201712:47 pmBUSDirectorate change
2nd Feb 201711:45 amBUSInitial Metallurgical Test-work Results
23rd Jan 20172:16 pmBUSDirector/PDMR Dealing
20th Jan 20174:12 pmBUSNew Corporate Website - Replacement
20th Jan 20173:40 pmBUSNew Corporate Website
18th Jan 20177:00 amBUSPlacing to Raise £650,000
5th Jan 20177:00 amBUSNumber of Shares in Issue
8th Dec 20167:00 amBUSMaiden JORC Compliant Mineral Resource Estimate of 40.9Mt @ 9.41% Total Graphitic Content
5th Dec 20167:00 amBUSJoint Venture Agreement Proceeding on Mpokoto Gold Project
11th Nov 201610:00 amBUSHolding(s) in Company
8th Nov 20167:00 amBUSInitial Assay Results Confirm High-Grade Graphite Mineralisation up to 26% TGC
2nd Nov 20169:45 amBUSHolding(s) in Company
26th Oct 20167:00 amBUS85% Strike Rate of High Grade Graphite Mineralisation from Drilling at Mahenge Liandu, Tanzania
18th Oct 20167:00 amBUSPositive Drill Results from Mahenge Liandu Graphite Project
18th Oct 20167:00 amBUSDirectorate change
11th Oct 20167:00 amBUSIssue of Equity
7th Oct 20167:00 amBUSDiscovery of High-Grade Coarse Flake Graphite Mineralisation Mahenge Liandu Project
28th Sep 20167:39 amBUSBinding HOA to Form Joint Venture to Develop Mpokoto and Directorate Change
23rd Sep 20167:00 amBUSDrilling Commences at the Mahenge Liandu Graphite Project, Tanzania
22nd Sep 20167:00 amBUSInterim Results
16th Aug 20167:00 amBUSGeological Mapping Identifies Extensive Outcropping Mineralisation at Mahenge Liandu Graphite Project, Tanzania
10th Aug 20167:00 amBUSDirectorate Change
28th Jul 20168:00 amBUSDirector/PDMR Shareholding
25th Jul 20167:00 amBUSEM Survey Defines Multiple Drill Targets at Mahenge Liandu Graphite Project, Tanzania
21st Jul 20167:00 amBUSDirectorate change
13th Jul 20169:35 amBUSHolding(s) in Company
11th Jul 20167:00 amBUSCompletes Acquisition of High Grade Graphite Project in Tanzania
24th Jun 201611:35 amBUSResult of AGM
23rd Jun 201612:00 pmBUSRaises £825,000 to Advance High Grade Liandu Graphite Project, Tanzania
20th Jun 201611:30 amBUSHigh Grade Graphite Mineralisation Confirmed at Liandu Project
2nd Jun 20167:00 amBUSProposed acquisition of a High Grade Coarse Flake Graphite Project in Tanzania
20th May 20167:00 amBUSFinal Results and Notice of AGM
3rd May 20167:00 amBUSArmadale Capital Plc (‘Armadale’ or ‘the Company’) Update on Exploration Programme at Mpokoto
7th Apr 201611:00 amBUSHolding(s) in Company
21st Mar 20164:15 pmBUSHolding(s) in Company
16th Mar 20163:40 pmBUSHolding(s) in Company
9th Mar 20167:00 amBUSPlacing & Planned Exploration Programme at Mpokoto
22nd Feb 20163:19 pmBUSRepayment of Loan
9th Feb 201611:32 amBUSRobust Project Demonstrated by Mpokoto Feasibility Study - Replacement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.