Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.75
Bid: 0.70
Ask: 0.80
Change: 0.025 (3.45%)
Spread: 0.10 (14.286%)
Open: 0.725
High: 0.75
Low: 0.725
Prev. Close: 0.725
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

31 Year Mine Plan Completed for Mahenge Liandu Graphite Project

19 Mar 2018 07:00

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

19 March 2018

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Mahenge Liandu Pit Optimisation and

31 Year Mine Plan Completed for Mahenge Liandu Graphite Project

Armadale, the AIM quoted investment company focused on natural resource projects in Africa, is pleased to announce that an optimisation study for the Mahenge Liandu Graphite Project in Tanzania (‘Mahenge’) has now been completed by ROM Resources. The results of the optimisation study were used to generate a mining schedule focusing on high grade near surface mineralisation. The first seven years of production show exceptionally high graphite grades averaging 15.5% Total Graphitic Carbon (‘TGC’) with an average grade of 12.5% over the life of mine.

Overview

A mining schedule over 31 years was produced at 400,000 tpa averaging 12.5% TGC over the life of the mine The initial seven years show an exceptional average grade of 15.5% TGC The near surface nature of the deposit produced a low strip ratio of approximately 1:1 for the life of the mine Substantial potential for both the expansion of the throughput and mine life due to the large size of the resource Optimisation results underpin the low cost, high grade potential of the project, which together with the high quality of the graphite concentrates produced to date point to the ability to produce an extremely robust initial scoping study, results of which are expected in the coming weeks and will provide initial project economics A diamond drilling programme, targeted to commence in Q2 2018, will focus on obtaining representative samples of ore from the first areas to be mined as well as geotechnical drilling to support the final pit design

Nick Johansen, Director of Armadale said: “To have defined a 31 year mine plan that can produce 400,000tpa of graphite at a grade of 12.5% is very exciting. Crucially the mine plan is based on near surface material with a very low strip ratio, which has positive cost impacts as the deposit will be relatively simple to mine and metallurgical test work to date has shown that minimal processing is required to produce a high grade, quality graphite concentrate. The results of this mine plan and optimisation work will feed into the Scoping Study, which is now nearing completion. The results will give a clearer indication of the project economics from which we will be able to better define our development plan. We look forward to sharing the results of this with shareholders in the coming weeks.”

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:  
Armadale Capital Plc

Tim Jones, Company Secretary

+44 20 7236 1177
Nomad and broker: finnCap Ltd

Christopher Raggett / Simon Hicks

+44 20 7220 0500
Press Relations: St Brides Partners Ltd

Susie Geliher / Charlotte Page

+44 20 7236 1177

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 51.1Mt @ 9.3% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

Competent Person statement

The information in this announcement that relates to exploration results is based on information compiled by Mr Matt Bull, a competent person, who is a Member of the Australian Institute of Geoscientists. Mr Bull has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Bull consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

More information can be found on the website www.armadalecapitalplc.com

View source version on businesswire.com: http://www.businesswire.com/news/home/20180319005110/en/

Copyright Business Wire 2018

Date   Source Headline
19th Jul 20177:00 amBUSExploration Update at Mahenge Liandu Graphite Project, Tanzania
13th Jul 201712:01 pmBUSConvertible Note Update
4th Jul 20172:31 pmBUSTanzanian Legislation
26th Jun 20174:35 pmBUSResult of AGM
26th Jun 20177:00 amBUSAGM Statement
21st Jun 20177:00 amBUSExploration Update: Trenching Intercepts Wide Zones of High Grade Graphite
5th Jun 20177:00 amBUSUpdate on 2017 Exploration Programme at Mahenge Liandu Graphite Project
2nd Jun 20177:00 amBUSFinal Results
3rd May 20177:00 amBUSGraphite Concentrate Upgraded to Purity of up to 99.99% Graphitic Carbon
21st Apr 20179:31 amBUSExcellent Test Results for Mahenge Liandu Graphite Concentrate
29th Mar 20177:00 amBUS2017 Mahenge Liandu Exploration Programme Commenced: Targeting Resource Increase and Upgrade
28th Feb 201712:47 pmBUSDirectorate change
2nd Feb 201711:45 amBUSInitial Metallurgical Test-work Results
23rd Jan 20172:16 pmBUSDirector/PDMR Dealing
20th Jan 20174:12 pmBUSNew Corporate Website - Replacement
20th Jan 20173:40 pmBUSNew Corporate Website
18th Jan 20177:00 amBUSPlacing to Raise £650,000
5th Jan 20177:00 amBUSNumber of Shares in Issue
8th Dec 20167:00 amBUSMaiden JORC Compliant Mineral Resource Estimate of 40.9Mt @ 9.41% Total Graphitic Content
5th Dec 20167:00 amBUSJoint Venture Agreement Proceeding on Mpokoto Gold Project
11th Nov 201610:00 amBUSHolding(s) in Company
8th Nov 20167:00 amBUSInitial Assay Results Confirm High-Grade Graphite Mineralisation up to 26% TGC
2nd Nov 20169:45 amBUSHolding(s) in Company
26th Oct 20167:00 amBUS85% Strike Rate of High Grade Graphite Mineralisation from Drilling at Mahenge Liandu, Tanzania
18th Oct 20167:00 amBUSPositive Drill Results from Mahenge Liandu Graphite Project
18th Oct 20167:00 amBUSDirectorate change
11th Oct 20167:00 amBUSIssue of Equity
7th Oct 20167:00 amBUSDiscovery of High-Grade Coarse Flake Graphite Mineralisation Mahenge Liandu Project
28th Sep 20167:39 amBUSBinding HOA to Form Joint Venture to Develop Mpokoto and Directorate Change
23rd Sep 20167:00 amBUSDrilling Commences at the Mahenge Liandu Graphite Project, Tanzania
22nd Sep 20167:00 amBUSInterim Results
16th Aug 20167:00 amBUSGeological Mapping Identifies Extensive Outcropping Mineralisation at Mahenge Liandu Graphite Project, Tanzania
10th Aug 20167:00 amBUSDirectorate Change
28th Jul 20168:00 amBUSDirector/PDMR Shareholding
25th Jul 20167:00 amBUSEM Survey Defines Multiple Drill Targets at Mahenge Liandu Graphite Project, Tanzania
21st Jul 20167:00 amBUSDirectorate change
13th Jul 20169:35 amBUSHolding(s) in Company
11th Jul 20167:00 amBUSCompletes Acquisition of High Grade Graphite Project in Tanzania
24th Jun 201611:35 amBUSResult of AGM
23rd Jun 201612:00 pmBUSRaises £825,000 to Advance High Grade Liandu Graphite Project, Tanzania
20th Jun 201611:30 amBUSHigh Grade Graphite Mineralisation Confirmed at Liandu Project
2nd Jun 20167:00 amBUSProposed acquisition of a High Grade Coarse Flake Graphite Project in Tanzania
20th May 20167:00 amBUSFinal Results and Notice of AGM
3rd May 20167:00 amBUSArmadale Capital Plc (‘Armadale’ or ‘the Company’) Update on Exploration Programme at Mpokoto
7th Apr 201611:00 amBUSHolding(s) in Company
21st Mar 20164:15 pmBUSHolding(s) in Company
16th Mar 20163:40 pmBUSHolding(s) in Company
9th Mar 20167:00 amBUSPlacing & Planned Exploration Programme at Mpokoto
22nd Feb 20163:19 pmBUSRepayment of Loan
9th Feb 201611:32 amBUSRobust Project Demonstrated by Mpokoto Feasibility Study - Replacement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.