Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.725
Bid: 0.70
Ask: 0.75
Change: 0.00 (0.00%)
Spread: 0.05 (7.143%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.725
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

31 Year Mine Plan Completed for Mahenge Liandu Graphite Project

19 Mar 2018 07:00

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

19 March 2018

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Mahenge Liandu Pit Optimisation and

31 Year Mine Plan Completed for Mahenge Liandu Graphite Project

Armadale, the AIM quoted investment company focused on natural resource projects in Africa, is pleased to announce that an optimisation study for the Mahenge Liandu Graphite Project in Tanzania (‘Mahenge’) has now been completed by ROM Resources. The results of the optimisation study were used to generate a mining schedule focusing on high grade near surface mineralisation. The first seven years of production show exceptionally high graphite grades averaging 15.5% Total Graphitic Carbon (‘TGC’) with an average grade of 12.5% over the life of mine.

Overview

A mining schedule over 31 years was produced at 400,000 tpa averaging 12.5% TGC over the life of the mine The initial seven years show an exceptional average grade of 15.5% TGC The near surface nature of the deposit produced a low strip ratio of approximately 1:1 for the life of the mine Substantial potential for both the expansion of the throughput and mine life due to the large size of the resource Optimisation results underpin the low cost, high grade potential of the project, which together with the high quality of the graphite concentrates produced to date point to the ability to produce an extremely robust initial scoping study, results of which are expected in the coming weeks and will provide initial project economics A diamond drilling programme, targeted to commence in Q2 2018, will focus on obtaining representative samples of ore from the first areas to be mined as well as geotechnical drilling to support the final pit design

Nick Johansen, Director of Armadale said: “To have defined a 31 year mine plan that can produce 400,000tpa of graphite at a grade of 12.5% is very exciting. Crucially the mine plan is based on near surface material with a very low strip ratio, which has positive cost impacts as the deposit will be relatively simple to mine and metallurgical test work to date has shown that minimal processing is required to produce a high grade, quality graphite concentrate. The results of this mine plan and optimisation work will feed into the Scoping Study, which is now nearing completion. The results will give a clearer indication of the project economics from which we will be able to better define our development plan. We look forward to sharing the results of this with shareholders in the coming weeks.”

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:  
Armadale Capital Plc

Tim Jones, Company Secretary

+44 20 7236 1177
Nomad and broker: finnCap Ltd

Christopher Raggett / Simon Hicks

+44 20 7220 0500
Press Relations: St Brides Partners Ltd

Susie Geliher / Charlotte Page

+44 20 7236 1177

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 51.1Mt @ 9.3% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

Competent Person statement

The information in this announcement that relates to exploration results is based on information compiled by Mr Matt Bull, a competent person, who is a Member of the Australian Institute of Geoscientists. Mr Bull has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Bull consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

More information can be found on the website www.armadalecapitalplc.com

View source version on businesswire.com: http://www.businesswire.com/news/home/20180319005110/en/

Copyright Business Wire 2018

Date   Source Headline
13th Aug 20201:15 pmBUSAssessment of Mahenge Natural Flake Graphite for Battery Applications
16th Jul 202011:43 amBUSUpdated Corporate Presentation
2nd Jul 202010:45 amBUSMining Licence Application Submitted
30th Jun 202010:30 amBUSAGM Statement
18th Jun 202012:00 pmBUSBlock Admission
15th Jun 202010:00 amBUSProject Finance Update
8th Jun 20202:00 pmRNSPrice Monitoring Extension
8th Jun 202011:45 amBUSConversion of CLNs, Exercise of Warrants and Issue of Equity
5th Jun 202011:45 amBUSDFS update increases Mahenge NPV to $430 million
4th Jun 20207:37 amBUSFinal Results and Notice of AGM
29th May 20202:00 pmBUSExercise of Warrants and Issue of Equity
27th May 20202:06 pmRNSSecond Price Monitoring Extn
27th May 20202:00 pmRNSPrice Monitoring Extension
26th May 20207:30 amBUSExercise of Warrants and Issue of Equity
18th May 20207:00 amBUSConversion of CLNs, Exercise of Warrants and Issue of Equity
12th May 202010:00 amBUSUpdated Mine Plan Materially Increases Production
11th May 202010:30 amBUSExercise of Warrants and Issue of Equity
5th May 202011:05 amRNSSecond Price Monitoring Extn
5th May 202011:00 amRNSPrice Monitoring Extension
4th May 202010:45 amBUSExercise of Warrants and Issue of Equity
30th Apr 202010:54 amBUSSubscription
29th Apr 20202:51 pmBUSConversion of Convertible Loan Note
24th Apr 202010:35 amBUSBoard Appointment
16th Apr 202012:45 pmBUSDirectorship Changes
31st Mar 20202:00 pmBUSDFS confirms Mahenge as a long-life low-cost graphite project with US$358m NPV and IRR of 91%
25th Mar 20202:01 pmRNSPrice Monitoring Extension
25th Mar 20201:15 pmBUSTest work produces 97% TGC concentrates
24th Mar 20202:06 pmRNSSecond Price Monitoring Extn
24th Mar 20202:00 pmRNSPrice Monitoring Extension
18th Mar 20204:43 pmRNSSecond Price Monitoring Extn
18th Mar 20204:38 pmRNSPrice Monitoring Extension
10th Mar 202011:30 amBUSImproved Mine Plan Increases Production Output by 100% via staged ramp-up
21st Feb 20207:00 amBUSProject Update
17th Jan 20207:00 amRNSExercise of Warrants and Issue of Equity
7th Jan 202011:01 amBUSAppointment of Non-executive Director
27th Dec 20191:00 pmBUSREPLACEMENT: Exercise of Warrants and Issue of Equity
23rd Dec 20191:45 pmBUSExercise of Warrants
18th Dec 201912:00 pmBUSCorporate Update
6th Dec 20197:00 amRNSAppointment of Non-executive Director
26th Nov 20198:25 amBUSDirectorate change
11th Nov 20199:25 amBUSMine Design & Project Engineer Site Visit Update
1st Nov 201910:36 amRNSFurther Information on Strategic Financing
30th Oct 201910:15 amBUSFurther Strategic Financing
25th Oct 20199:40 amBUSFurther Offtake Agreement MOU
18th Oct 20197:00 amRNSShareholder Webinar
15th Oct 20199:40 amBUSResource Upgrade Confirms High Grade Near Surface Mineralisation
3rd Oct 20197:00 amRNSNew Corporate Presentation
26th Sep 20197:00 amBUSFurther Offtake Agreement MOU
25th Sep 20192:20 pmRNSInvestor Presentation Evening
16th Sep 20191:41 pmBUSStrategic Financing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.