The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 70.00
Bid: 69.00
Ask: 71.00
Change: -1.00 (-1.41%)
Spread: 2.00 (2.899%)
Open: 71.50
High: 72.50
Low: 70.00
Prev. Close: 71.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Results & Update

17 Jan 2006 07:01

Anglo Asian Mining PLC17 January 2006 17 January 2006 AIM: AAZ ANGLO ASIAN MINING PLC ("Anglo Asian" or "the Company") Further exploration results from Azerbaijan and trading update Anglo Asian reports on the further preliminary exploration work carried outwithin the Gosha property and the Ordubad Contract Area, which includes thePiyazbashi, Shakardara and Misdag properties, in accordance with its ongoingexploration programme. The initial results from the Gosha and Piyazbashiproperties have been encouraging and confirm the original Soviet data. Theresults from the first of three adits at Shakardara have been disappointing. Gosha Results from the first 100 continuous channel samples over 200 metres from adits5 and 7 of the Gosha property give an average of 3.02 grams per tonne ("g/t") ofgold, including 48 metres averaging 5.18g/t gold in adit 5 and 20 metres at14.84g/t gold in adit 7. These results confirm two of the large vein-likestructures as described in the AIM Admission Document and are in line with theSoviet data. Results from a further 218 samples from adits 5 and 7 are expectedby the end of January 2006. Ordubad Anglo Asian has carried out preliminary sampling and drilling at its Piyazbashiproperty and sampling at its Shakardara and Misdag properties within the OrdubadContract Area. Piyazbashi Results have been received from the first two deep diamond drill holes on thePiyazbashi property along with 28 samples from adit 1. The preliminary resultsreceived to date confirm the presence and gold grade of the veins, which isbroadly in line with the Soviet data. Full detailed results will be publishedin the near future together with the results of continuing further drilling. Areas outside the defined Piyazbashi property have also been investigated by theuse of trenching and reverse circulation drilling. The results from thesestep-out areas showed minimal gold content. These areas did not include anyinferred resources. Shakardara At Shakardara, although a single sample result yielded 2.1 g/t gold, the averageof the preliminary channel sampling of adit 12 was 0.09 g/t of gold, as opposedto the Soviet classified grade in that adit of an average of 1.1 g/t gold over380 metres. Retesting and resampling of the dump outside adit 12 (although anunrepresentative method of sampling) gave two results around 1 g/t, in contrastto the significantly higher grades of two samples taken by the Company'sconsultants, which were included in the AIM Admission Document of 14.88 and 33.6g/t gold. Those two high grade samples were not used to calculate the inferredresource but contributed to the estimation of the upside potential. The copper inferred resource of Shakardara stated in the AIM Admission Documentis not based on adit 12 but mainly from results from other parts of the deposit,including adit 10. Sampling will commence on adits 10 and 11, the other mainadits at Shakardara, following the clearance of blockages. Results from theseadits are therefore not expected until at least the end of March 2006.Continued sampling at Shakardara will help to establish the reasons for the goldgrade shortfall in and around adit 12 and to gain further information on thisproperty. Misdag Forty reconnaissance composite samples at 10 metre intervals have been taken atadits 12 and 13 at the Misdag property, which gave an average of 0.64% copper,including one sample at 3.78% copper. The Soviet data gave an average grade forMisdag of 0.43% copper. More extensive sampling work is due to commence in lateMarch. Going forward The Company has retained SRK Consulting to assist in the prioritisation of itsproperties. The CIL plant acquired by the Company in Australia is currently beingdismantled, put into containers and transported to the port of Mackay,Queensland. This is expected to be completed by late February, with a largepart of the plant already in the port vicinity. The Company will then be ableto store the plant at the port, maintaining flexibility for it to be moved atshort notice. A new portable modular analytical laboratory, capable of processing 300 samplesper day, is presently en route to Azerbaijan from the USA. This is expected tobe fully operational within three months. The exploration programme will be extended to the Gedebek property, whereextensive cleaning of adits and establishment of some infrastructure has alreadybeen carried out. Further sampling will be carried out at Misdag, Agyurt and Shakardara in orderto optimise the drilling programme planned for these properties. The Company had cash resources of $21.3 million at 31 December 2005, at whichpoint an estimated $5 million was outstanding on the plant and for completion ofthe dismantling contract. Once these obligations have been discharged, theCompany will own the containerised asset at the port in Australia. Reza Vaziri, Executive Chairman of Anglo Asian, commented, "The Gosha andPiyazbashi results give the Company comfort and encouragement in contrast to ourdisappointment with the first adit result at Shakardara. The full impact ofthis initial adit result on Shakardara will not be established until samplingfrom adits 10 and 11 have been analysed." -Ends- For further details, please contact: Anglo Asian Mining PLC Charles Hancock, Chief Executive +44 20 7409 3232 Numis Securities Limited John Harrison +44 20 7776 1590 Parkgreen Communications Justine Howarth / Victoria Thomas +44 20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
22nd May 20157:00 amRNSDirector Loan
14th Apr 20157:00 amRNSQ1 2015 Gedabek Update
19th Mar 201511:54 amRNSDirector Dealing
12th Mar 20152:37 pmRNSDirector Dealing
9th Mar 20158:40 amRNSFlotation Plant Update - Gedabek Mine Azerbaijan
14th Jan 20157:15 amRNSQ4 2014 and FY 2014 Production Update Gedabek
6th Jan 20151:35 pmRNSDirector Share Dealing
20th Nov 20143:32 pmRNSFlotation Plant Construction and Production Update
19th Nov 20147:00 amRNSIncrease in JORC Ore Reserve at Gedabek mine
15th Oct 201410:30 amRNSQ3 2014 Production and Operational Update
23rd Sep 20147:00 amRNSInterim Results
18th Jul 20147:00 amRNSQ2 2014 and H1 2014 Operations Update
30th Jun 20142:39 pmRNSResult of AGM
30th Jun 20147:00 amRNSAGM Statement
5th Jun 20143:44 pmRNS29% Increase in Resource - Gedabek (Replacement)
5th Jun 20147:00 amRNS29 per cent Increase in Resource at Gedabek
4th Jun 20143:58 pmRNSPosting of Report and Accounts and Notice of AGM
28th May 20147:00 amRNSFinal Results
22nd May 20147:00 amRNSLoan Agreement
14th May 20144:41 pmRNSSecond Price Monitoring Extn
14th May 20144:35 pmRNSPrice Monitoring Extension
14th May 20142:30 pmRNSUpdate re Final Results
6th May 20147:01 amRNSNew Copper Sales Contract - Gedabek Azerbaijan
17th Apr 20148:30 amRNSGedabek and Gosha Q1 2014 Update
28th Feb 20149:36 amRNSDirector's Shareholding
20th Feb 20143:10 pmRNSDirector's Shareholding
31st Jan 20147:00 amRNSTotal Voting Rights
23rd Jan 20149:33 amRNSDirector's Dealing and Issue of Equity
15th Jan 20147:00 amRNSQ4 Operations and FY 2013 Update for Gedabek Mine
8th Jan 20147:00 amRNSHighly Positive Exploration Update at Gedabek
20th Dec 20137:00 amRNSGedabek Gold Mine Update Azerbaijan
2nd Dec 20137:00 amRNSNew High Grade Gold Discovered at Gedabek Mine
18th Nov 20137:00 amRNSAppointment of Director of Geology
21st Oct 20139:00 amRNSHolding(s) in Company
16th Oct 20137:34 amRNSInvestor Evenings - Dublin and Manchester
11th Oct 201310:32 amRNSGedabek Resource Increase to 1.12 Moz of gold
10th Oct 20137:00 amRNSRecord Gold Production Q3 2013 - Gedabek
9th Oct 20137:00 amRNSDebt Refinancing - USD37M Loan Facility
26th Sep 20137:00 amRNSInterim Results
11th Sep 20137:00 amRNSGedabek & Gosha Gold Mining Update Azerbaijan
11th Jul 20137:00 amRNSQ2 2013 Gedabek Operations Update
8th Jul 20137:00 amRNSCopper Sales Update, Gedabek
1st Jul 20139:40 amRNSResult of AGM
28th Jun 20137:00 amRNSAGM Statement
5th Jun 20135:49 pmRNSNotice of AGM and Posting of R&A
5th Jun 20137:00 amRNSAgitation Leaching Plant - Full Commissioning
28th May 20137:00 amRNSFinal Results
22nd May 20137:00 amRNSAnalyst Conference Call for Final Results
10th Apr 20137:00 amRNSQ1 2013 Production and Operations Update - Gedabek
6th Feb 20137:00 amRNSCompany Gold Production Update, Azerbaijan

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.