The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 72.50
Bid: 71.00
Ask: 74.00
Change: 1.50 (2.11%)
Spread: 3.00 (4.225%)
Open: 71.50
High: 72.50
Low: 71.50
Prev. Close: 71.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Results & Update

17 Jan 2006 07:01

Anglo Asian Mining PLC17 January 2006 17 January 2006 AIM: AAZ ANGLO ASIAN MINING PLC ("Anglo Asian" or "the Company") Further exploration results from Azerbaijan and trading update Anglo Asian reports on the further preliminary exploration work carried outwithin the Gosha property and the Ordubad Contract Area, which includes thePiyazbashi, Shakardara and Misdag properties, in accordance with its ongoingexploration programme. The initial results from the Gosha and Piyazbashiproperties have been encouraging and confirm the original Soviet data. Theresults from the first of three adits at Shakardara have been disappointing. Gosha Results from the first 100 continuous channel samples over 200 metres from adits5 and 7 of the Gosha property give an average of 3.02 grams per tonne ("g/t") ofgold, including 48 metres averaging 5.18g/t gold in adit 5 and 20 metres at14.84g/t gold in adit 7. These results confirm two of the large vein-likestructures as described in the AIM Admission Document and are in line with theSoviet data. Results from a further 218 samples from adits 5 and 7 are expectedby the end of January 2006. Ordubad Anglo Asian has carried out preliminary sampling and drilling at its Piyazbashiproperty and sampling at its Shakardara and Misdag properties within the OrdubadContract Area. Piyazbashi Results have been received from the first two deep diamond drill holes on thePiyazbashi property along with 28 samples from adit 1. The preliminary resultsreceived to date confirm the presence and gold grade of the veins, which isbroadly in line with the Soviet data. Full detailed results will be publishedin the near future together with the results of continuing further drilling. Areas outside the defined Piyazbashi property have also been investigated by theuse of trenching and reverse circulation drilling. The results from thesestep-out areas showed minimal gold content. These areas did not include anyinferred resources. Shakardara At Shakardara, although a single sample result yielded 2.1 g/t gold, the averageof the preliminary channel sampling of adit 12 was 0.09 g/t of gold, as opposedto the Soviet classified grade in that adit of an average of 1.1 g/t gold over380 metres. Retesting and resampling of the dump outside adit 12 (although anunrepresentative method of sampling) gave two results around 1 g/t, in contrastto the significantly higher grades of two samples taken by the Company'sconsultants, which were included in the AIM Admission Document of 14.88 and 33.6g/t gold. Those two high grade samples were not used to calculate the inferredresource but contributed to the estimation of the upside potential. The copper inferred resource of Shakardara stated in the AIM Admission Documentis not based on adit 12 but mainly from results from other parts of the deposit,including adit 10. Sampling will commence on adits 10 and 11, the other mainadits at Shakardara, following the clearance of blockages. Results from theseadits are therefore not expected until at least the end of March 2006.Continued sampling at Shakardara will help to establish the reasons for the goldgrade shortfall in and around adit 12 and to gain further information on thisproperty. Misdag Forty reconnaissance composite samples at 10 metre intervals have been taken atadits 12 and 13 at the Misdag property, which gave an average of 0.64% copper,including one sample at 3.78% copper. The Soviet data gave an average grade forMisdag of 0.43% copper. More extensive sampling work is due to commence in lateMarch. Going forward The Company has retained SRK Consulting to assist in the prioritisation of itsproperties. The CIL plant acquired by the Company in Australia is currently beingdismantled, put into containers and transported to the port of Mackay,Queensland. This is expected to be completed by late February, with a largepart of the plant already in the port vicinity. The Company will then be ableto store the plant at the port, maintaining flexibility for it to be moved atshort notice. A new portable modular analytical laboratory, capable of processing 300 samplesper day, is presently en route to Azerbaijan from the USA. This is expected tobe fully operational within three months. The exploration programme will be extended to the Gedebek property, whereextensive cleaning of adits and establishment of some infrastructure has alreadybeen carried out. Further sampling will be carried out at Misdag, Agyurt and Shakardara in orderto optimise the drilling programme planned for these properties. The Company had cash resources of $21.3 million at 31 December 2005, at whichpoint an estimated $5 million was outstanding on the plant and for completion ofthe dismantling contract. Once these obligations have been discharged, theCompany will own the containerised asset at the port in Australia. Reza Vaziri, Executive Chairman of Anglo Asian, commented, "The Gosha andPiyazbashi results give the Company comfort and encouragement in contrast to ourdisappointment with the first adit result at Shakardara. The full impact ofthis initial adit result on Shakardara will not be established until samplingfrom adits 10 and 11 have been analysed." -Ends- For further details, please contact: Anglo Asian Mining PLC Charles Hancock, Chief Executive +44 20 7409 3232 Numis Securities Limited John Harrison +44 20 7776 1590 Parkgreen Communications Justine Howarth / Victoria Thomas +44 20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
2nd Jun 20179:30 amRNSPosting of Annual Report & Notice of AGM
25th May 20177:00 amRNSFull year results - 2016
9th May 201710:00 amRNSNew Corporate Presentation
8th May 20177:00 amRNSUgur Gold Deposit Development & Strategy Update
18th Apr 20177:00 amRNSStrategy Update and Q1 2017 Review
16th Feb 201712:32 pmRNSPartial transfer of loan from Amsterdam Trade Bank
17th Jan 20179:00 amRNSDirectors' Dealing
17th Jan 20177:00 amRNSQ4 & FY 2016 Operations and Production Update
22nd Dec 201610:00 amRNSUpdate re Director Loan
16th Dec 20167:00 amRNSSignificant Oxide Zone Drilled at Ugur Deposit
30th Nov 20167:00 amRNSGedabek Connected to Power Grid & Operation Update
14th Nov 201612:13 pmRNSGrant of Options
3rd Nov 20169:00 amRNSUpdated Presentation and AISC for Gedabek Mine
2nd Nov 20164:40 pmRNSSecond Price Monitoring Extn
2nd Nov 20164:35 pmRNSPrice Monitoring Extension
17th Oct 20167:00 amRNSNew Gold Discovery at its Gedabek Licence Area
13th Oct 20167:00 amRNSQ3 2016 Operations & Production Update
12th Sep 20167:00 amRNSInterim Results
14th Jul 20169:05 amRNSSecond Price Monitoring Extn
14th Jul 20169:00 amRNSPrice Monitoring Extension
14th Jul 20167:00 amRNSQ2 & H1 2016, Production Update, Operations Review
29th Jun 20167:30 amRNSHedging of gold sales for remainder of 2016
28th Jun 20167:00 amRNSResult of AGM
27th Jun 20167:00 amRNSAGM Statement
6th Jun 201610:00 amRNSPosting of Report & Accounts and Notice of AGM
25th May 20167:00 amRNSFinal Results
13th Apr 20167:00 amRNSQ1 2016 operations and production update, Gedabek
11th Feb 20164:41 pmRNSSecond Price Monitoring Extn
11th Feb 20164:35 pmRNSPrice Monitoring Extension
8th Feb 20164:41 pmRNSSecond Price Monitoring Extn
8th Feb 20164:35 pmRNSPrice Monitoring Extension
28th Jan 20167:00 amRNSNotification of Adoption of FRS 101
14th Jan 20167:00 amRNSQ4 2015/ FY 2015 Production Update Gedabek
11th Jan 20164:12 pmRNSDirector loan and Company net debt
21st Dec 20153:03 pmRNSFloating exchange rate regime
24th Nov 20157:00 amRNSCopper Concentrate Shipment from Floatation Plant
23rd Oct 20153:30 pmRNSDirector's Shareholding
14th Oct 20157:00 amRNSQ3 2015 Production Update
6th Oct 20159:53 amRNSHolding(s) in Company
22nd Sep 20157:00 amRNSInterim Results
31st Jul 20157:00 amRNSTotal Voting Rights
22nd Jul 20153:50 pmRNSIssue of Shares / Directors Dealing
13th Jul 20157:00 amRNSQ2 & H1 2015 operations update from Gedabek Mine
8th Jul 20154:40 pmRNSSecond Price Monitoring Extn
8th Jul 20154:35 pmRNSPrice Monitoring Extension
8th Jul 201512:42 pmRNSHolding(s) in Company
29th Jun 20153:00 pmRNSResult of AGM
29th Jun 201511:00 amRNSAGM Statement
5th Jun 201510:05 amRNSNotice of AGM and Posting R&A
28th May 20157:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.