The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.30
Bid: 2.20
Ask: 2.40
Change: -0.10 (-4.17%)
Spread: 0.20 (9.091%)
Open: 2.40
High: 2.35
Low: 2.25
Prev. Close: 2.40
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2019 PRELIMINARY PRODUCTION RESULTS

16 Apr 2019 07:00

RNS Number : 2525W
Ariana Resources PLC
16 April 2019
 

 

 

 

 

 

 

16 April 2019

AIM: AAU

 

Q1 2019 PRELIMINARY PRODUCTION RESULTS

 

Ariana Resources plc ("Ariana" or "the Company"), the exploration and development company with gold mining operations in Turkey, is pleased to announce its preliminary production results for the quarter ended 31 March 2019 for the Kiziltepe Mine ("Kiziltepe" or "the Project"). Kiziltepe is part of the Red Rabbit Joint Venture ("JV") with Proccea Construction Co. and is 50% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S. ("Zenit").

 

First Quarter Preliminary Production Results*:

 

· Gold production for the quarter was 7,296 ounces (Q4 2018: 7,517 ounces), exceeding average annualised quarterly guidance by 17%.

 

· Total ore processed for the quarter was 46,824 tonnes (Q4 2018: 49,717 tonnes) at an average head grade to the plant of 4.83 g/t gold.

 

· Quarterly open pit ore mined was c. 26,746 tonnes, at an average mined grade of 4.04 g/t gold, and total material movement for the quarter was 771,190 tonnes.

 

· Average metallurgical plant recovery of gold for the quarter remains high at 93.7%.

 

* All figures are given gross with respect to the JV.

 

Dr. Kerim Sener, Managing Director, commented:

 

"We would like to congratulate the mine management team on an excellent set of first quarter 2019 results, in addition to achieving the scheduled pushbacks which accommodate final-stage pit expansion at Arzu South. Production during the quarter has exceeded our average quarterly guidance by 17%. While movement of ore from the open pit was limited by the pushbacks, output of the process plant was maintained at high levels through the planned drawdown on stockpiles. Activities within the open pit were also impacted during the period due to unusually wet weather, but as we approach the summer period, we are expecting a return to higher ore movements from the pit, particularly towards the latter half of this year."

 

 

 

Q1 2019 Preliminary Production Results

 

 

Unit

Q1 2019

Q4 2018

Q1 2018#

Open Pit - material moved (wet)

Tonnes

771,190

719,369

913,666

Open Pit - ore mined (wet)

Tonnes

26,746

63,759

68,591

Open Pit - mined grade

g/t Au

4.04

4.54

4.50

Process plant throughput

Tonnes

46,824

49,717

44,897

Plant feed grade

g/t Au

4.83

5.23

3.85

Metallurgical recovery rate

%

93.7

91.6

95.1

Gold produced

Troy Ounces

7,296

7,517

4,866

Silver produced

Troy Ounces

84,109

90,881

30,864

 

 

 

 

#As originally stated prior to year-end mine and mill reconciliation restatement as per announcement on 14 January 2019.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

 

Kerim Sener, Managing Director

 

 

 

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

 

 

 

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

James Stearns / Atholl Tweedie

 

 

 

Yellow Jersey PR Limited

Tel: +44 (0) 20 3004 9512

Tim Thompson / Felicity Winkles / Harriet Jackson

/ Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

Editors' Note:

 

About Ariana Resources:

 

Ariana is an exploration and development company with mining operations focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey, the largest gold producing country in Europe. The Company is developing a portfolio of prospective licences originally selected on the basis of its in-house geological and remote-sensing database, which now contain a total of 1.6 million ounces of gold and other metals (as at end-2017). Ariana's objective is to cost-effectively add value to its projects through focused exploration and to develop its operations, primarily through well-financed joint ventures.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, form part of a 50:50 Joint Venture with Proccea Construction Co. The Kiziltepe Sector of the Red Rabbit Project is fully-permitted and is currently in production. The total resource inventory at the Red Rabbit Project and wider project area stands at c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

In north-eastern Turkey, Ariana owns 100% of the Salinbas Gold Project, comprising the Salinbas gold-silver deposit and the Ardala copper-gold-molybdenum porphyry among other prospects. The total resource inventory of the Salinbas project area is c. 1 million ounces of gold equivalent. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEASLSFDENEFF
Date   Source Headline
7th Mar 20185:42 pmRNSDirector/PDMR Shareholdings
21st Dec 20177:00 amRNSEquity and options issue, Directors' dealings, TVR
7th Dec 20177:00 amRNSFurther Gold Discovery at Salinbas
14th Nov 20177:00 amRNSExcellent Results from Ardala Area, Salinbas
23rd Oct 20177:00 amRNSKiziltepe quarterly operational update
5th Sep 20177:00 amRNSExciting Results Across Hot Gold Corridor
30th Jun 20178:44 amRNSKiziltepe Operational Update
20th Jun 20177:00 amRNSPlacing and Subscription to raise £2 million
2nd Jun 201711:04 amRNSFinal Results
3rd May 20177:00 amRNSMajor increase in Kiziltepe Resource
18th Jul 20167:00 amRNSDrilling Programme Commencement
6th Jul 20162:05 pmRNSSecond Price Monitoring Extn
6th Jul 20162:00 pmRNSPrice Monitoring Extension
5th Jul 20164:40 pmRNSSecond Price Monitoring Extn
5th Jul 20164:35 pmRNSPrice Monitoring Extension
24th Mar 20168:00 amRNSRed Rabbit Gold-Silver Project Update
16th Mar 20168:00 amRNSSignificant Gold System Confirmed At Kepez West
7th Mar 20168:02 amRNS100% Increase in Kizilcukur Resource - Replacement
7th Mar 20167:00 amRNS100% Increase in Kizilcukur Resource
1st Mar 20162:00 pmRNSLithium-Tantalum Memorandum of Understanding
23rd Feb 20167:00 amRNSCompletion Of Lithium Transaction
11th Feb 20167:00 amRNSKiziltepe Construction Update
1st Feb 20167:00 amRNSKiziltepe Vein System Extended
18th Jan 20167:00 amRNSEXCELLENT RESULTS FROM KIZILCUKUR DRILLING
13th Jan 20167:00 amRNSLetter To Shareholders
18th Dec 20159:31 amRNSLithium Project Transaction
1st Dec 20157:00 amRNSPositive Drilling Results At Kiziltepe
18th Nov 20157:00 amRNSKIZILCUKUR PROJECT RECEIVES MINING PERMIT
19th Oct 20157:00 amRNSDrilling Programme - Kiziltepe sector
30th Sep 20157:00 amRNSInterim Results
20th Apr 20154:40 pmRNSSecond Price Monitoring Extn
20th Apr 20154:35 pmRNSPrice Monitoring Extension
5th Mar 201510:26 amRNSInvestor Relations App
19th Feb 20154:40 pmRNSSecond Price Monitoring Extn
19th Feb 20154:35 pmRNSPrice Monitoring Extension
16th Oct 20144:40 pmRNSSecond Price Monitoring Extn
16th Oct 20144:35 pmRNSPrice Monitoring Extension
10th Jun 20144:40 pmRNSSecond Price Monitoring Extn
10th Jun 20144:35 pmRNSPrice Monitoring Extension
20th May 20144:40 pmRNSSecond Price Monitoring Extn
20th May 20144:35 pmRNSPrice Monitoring Extension
15th May 20144:35 pmRNSPrice Monitoring Extension
8th May 20144:40 pmRNSSecond Price Monitoring Extn
8th May 20144:35 pmRNSPrice Monitoring Extension
6th May 20144:40 pmRNSSecond Price Monitoring Extn
6th May 20144:35 pmRNSPrice Monitoring Extension
1st May 20144:40 pmRNSSecond Price Monitoring Extn
1st May 20144:35 pmRNSPrice Monitoring Extension
1st Apr 20107:00 amRNSPlacing to raise ?1,000,000
17th Dec 20097:00 amRNSRed Rabbit Joint Venture Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.