Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

Share Price is delayed by 15 minutes
Get Live Data
2.00    0.22 (11.70%)
Bid:
1.90
Ask:
2.10
Spread: 0.20 (10.526%)
Market Cap: £55.78m
AAU Live PriceLast checked at - London Stock Exchange

Intraday Ariana Share Chart

Red Rabbit Joint Venture Update

17 Dec 2009 07:00

RNS Number : 2670E
Ariana Resources PLC
17 December 2009
 



17th December 2009

AIM / PLUS Markets: AAU

RED RABBIT JV UPDATE

Ariana Resources plc ("Ariana" or "the Company"), the gold exploration and development company focused on Turkey is pleased to announce further solid progress towards production on its proposed joint venture ("JV") with Proccea Construction Co. ("Proccea") on the Red Rabbit Project in western Turkey. Work is underway on a number of fronts in preparation for the planned 2010 feasibility study.

Highlights

Good-will payment of US$0.5 million received from Proccea 

Wardrop Engineering, a Tetra Tech Company ("Wardrop"), engaged to undertake a NI43-101 compliant mineral resource estimate

SGS Mineral Services engaged to undertake new metallurgical testwork

SRK Consulting engaged to commence environmental scoping

PriceWaterhouseCoopers engaged as financial consultant for the transaction

Dr. Kerim Sener, Managing Director, commented:

"The Company has taken several rapid steps forward for the development of the Red Rabbit Project. The Company has chosen to make these positive moves ahead of formal completion of our JV agreement in order to makoptimal use of time. Proccea is being highly supportive of these work programmes and is reinforcing the efforts being made by our team. Accordingly, we are confident that the JV agreement will be concluded during the first quarter of next year."

Current Progress

Following the signature of the Memorandum of Understanding ("MoU") with Proccea, the Company and its JV partner have initiated work on several core aspects of project development. In the first phase of this work, efforts are being directed toward the Kiziltepe sector of the Red Rabbit Project.

Under the terms of the MoU, Ariana's operating subsidiary has received US$0.5 million in cash from Proccea in exchange for a letter of guarantee from Türkiye Iş Bankasi in Turkey. The Company intends to hold this sum in a high interest bearing account until completion of the JV agreement, following which the funds will be directed towards new exploration in Turkey.

Wardrop has been commissioned to undertake a revised National Instrument 43-101 compliant mineral resource estimate for the Kiziltepe sector. In parallel with this work, SGS Mineral Services UK Ltd. will be commencing further metallurgical testwork on mineralised material from Kiziltepe to determine optimal grind, leach and tailing characteristics. The revised resource and the new metallurgical testwork will be used as part of project feasibility studies to be undertaken in 2010. Relating to this, Proccea is intending to establish its own laboratory on site to fast-track future metallurgical testwork.

SRK Consulting in Turkey has been engaged to commence environmental scoping in December 2009 prior to commencing a formal Environmental Impact Assessment ("EIA") for the project in the New Year. At the present time, the formal EIA is scheduled to be completed by September 2010. Funding of the EIA will be undertaken by Proccea as part of its earn-in on the Red Rabbit Project.

PriceWaterhouseCoopers in Turkey has been engaged to provide financial advice to the Company during the structuring of the formal JV agreement and for the establishment of the JV Company. This measure has been taken to ensure that the JV is structured financially in the most appropriate manner ahead of JV completion. Proccea and Ariana are currently working on the Shareholders' Agreement and are estimating completion of the JV within the first quarter 2010.

About Proccea

Proccea Construction Co. (www.proccea.comis an integrated construction firm specialising in turn-key solutions for a variety of business sectors ranging from the development of gold processing plants to designing and building major hotels. The mining service is provided by a business division of Proccea named CH Engineering & Consultancy ("CH").  CH provides a range of services to the mining industry, including the design of mining equipment and processing plants, manufacturing installation, commissioning, start-up and staff training for gold and silver extraction in the mining industry (www.chconsultants.com).

CH provides the installation and technical services for such gold mining processes as heap leach, CIL and CIP design and operations. CH has wide experience of designing and commissioning gold and silver processing plants. In Turkey this has included the Kişladag gold mine (Eldorado Gold), Copler gold mine (Anatolia Minerals), Mastra gold mine (Koza Gold) and the Gümüşköy silver mine (Eti Gümüş). Internationally, CH processing plant commissions have included the Zarcan gold mine in Iran, the Knelson gold mine in Kazakhstan, the Amesmessa gold mine in Algeria, the Kitila gold mine in Finland, the Minera Triton gold mine in Argentina and the Maaden gold mine in Saudi Arabia. CH has the technical support of the internationally renowned Summit Valley Equipment and Engineering firm based in Utah, U.S.A.

Contacts:

Ariana Resources plc

Michael Spriggs, Chairman

Tel: 020 7407 3616

Kerim SenerManaging Director

Beaumont Cornish Limited

Tel: 020 7628 3396

Roland Cornish

Alexander David Securities Limited

Tel: 020 7448 9820

Nick Bealer / David Scott

Loeb Aron & Company Ltd

Tel: 020 7628 1128

Peter Freeman / Frank Lucas

Editors' note:

About Ariana Resources

Ariana is an exploration and development company focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey. The Company is exploring a portfolio of prospective licences selected on the basis of its in-house geological and remote-sensing database, on its own in western Turkey and in Joint Venture with European Goldfields Limited in north-eastern Turkey.

The Company's flagship assets are its Sindirgi and Tavsan gold projects. Both projects contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, are presently being assessed as to their economic merits. The total resource inventory of the Company stands at 401,000 ounces of gold equivalent.

Loeb Aron & Company Ltd. and Alexander David Securities Limited are joint brokers to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

Ends

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
JVEUNSKRKARUAAA
Date   Source Headline
29th May 202612:45 pmRNSResult of AGM and Updated Corporate Presentation
26th May 20268:30 amRNSRevised PFS for Optimised Dokwe Gold Project
26th May 20267:00 amRNSAgreement for Strategic Investment - Tranche 2 CDI
18th May 20267:00 amRNSSale of 13.6% Interest in Zenit for US$19.5m Cash
14th May 20267:00 amRNSResource Growth Potential Identified at Dokwe
7th May 20267:00 amRNSUpdate on Dokwe Project Feasibility Activities
30th Apr 20267:00 amRNSQuarterly Activities Report 31 March 2026
29th Apr 20267:00 amRNSNotice of AGM
14th Apr 20267:00 amRNSAppointment of New Non-Executive Chairman
31st Mar 202610:30 amRNSAppointment of Chief Financial Officer
31st Mar 20267:00 amRNSFinal Audited Results for the Year Ended 31 Dec 25
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
25th Feb 202612:00 pmRNSResult of GM
4th Feb 20267:00 amRNSSettlement of Outstanding Debt to RiverFort & TVR
2nd Feb 20267:00 amRNS-RAttendance at 121 Mining Investment, Cape Town
30th Jan 202611:00 amRNSQuarterly Activities Report 31 December 2025
23rd Jan 20261:32 pmRNSXinhai Strategic Investment and Notice of GM
21st Jan 20267:00 amRNSDrilling Results from Main & South Zones at Tavşan
8th Jan 20267:00 amRNSHolding(s) in Company
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
12th Dec 20257:00 amRNSDokwe Drilling Update
9th Dec 20257:00 amRNSTerm Sheet for Strategic Investment in Dokwe
3rd Dec 202511:00 amRNSTavsan First Pour
27th Nov 20257:00 amRNSKizilcukur Drilling Identifies Potential Extension
24th Nov 20259:15 amRNS-RMines and Money London Conference Attendance
13th Nov 20257:00 amRNSHigh-Grade Gold in Drilling Results at Tavsan Mine
4th Nov 20257:00 amRNSExploration Drilling Commences at >1Moz Dokwe
31st Oct 20257:00 amRNSQuarterly Activities Report
23rd Oct 20257:00 amRNSSignificant Dokwe Exploration Update
15th Oct 20257:00 amRNSRig Mobilisation for Drilling Programme at Dokwe
9th Oct 20257:00 amRNS-RPresentation at Marketopen's Investor Sundowner
8th Oct 20257:00 amRNSTavşan Mine is now Fully Operational
30th Sep 202512:00 pmRNS-RCorporate Presentation - September 2025
29th Sep 20257:00 amRNSInterim Results
16th Sep 20257:00 amRNSSummary of Projects with Drilling Planned at Dokwe
10th Sep 20257:00 amRNSCommence Trading on Australian Securities Exchange
8th Sep 202512:37 pmRNSDual Listing on ASX and Total Voting Rights
28th Aug 20257:00 amRNS-RAfrica Down Under Conference Attendance in Perth
22nd Aug 20258:45 amRNSResults of ASX Offer for Dual Listing
18th Aug 20259:30 amRNSDirector/PDMR Shareholding
15th Aug 20258:21 amRNSDual Listing – Close of ASX Offer
8th Aug 20257:00 amRNSASX Offer Open and Tavsan Update
29th Jul 202510:45 amRNSLodgement of ASX Dual Listing Prospectus
28th Jul 20258:36 amRNSDual Listing – Close of Institutional Bookbuild
14th Jul 20257:00 amRNSOperational Update: Tavsan
9th Jul 20251:35 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.