REMINDER: Our focusIR Investor Webinar takes place TONIGHT with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.80
Bid: 2.70
Ask: 2.90
Change: 0.05 (1.82%)
Spread: 0.20 (7.407%)
Open: 2.75
High: 2.80
Low: 2.75
Prev. Close: 2.75
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

100% Increase in Kizilcukur Resource - Replacement

7 Mar 2016 08:02

RNS Number : 2135R
Ariana Resources PLC
07 March 2016
 

Associated PDF Amendment

 

The following replaces the 100% Increase in Kizilcukur Resource announcement released on 7 March 2016 at 07:00 under RNS No 1826R.

 

The announcement text is unchanged and is reproduced in full below.

 

 

 

 

7 March 2016

AIM: AAU

 

Ariana Resources

 

100% INCREASE IN KIZILCUKUR RESOURCE

 

Ariana Resources plc ("Ariana" or "the Company"), is pleased to announce an increase and upgrade of its JORC compliant Mineral Resource estimate for the Kizilcukur Project following its recent drilling programme in Turkey. Kizilcukur is located outside of the Red Rabbit joint venture with Proccea Construction Co. and is 100% owned by Ariana.

 

Highlights:

 

· 100% increase in the Mineral Resource to c.308,000 t @ 2.11g/t gold and 73.4g/t silver, for 33,000 oz gold equivalent (Indicated + Inferred)

 

· Mineral Resource largely defined within three shallow (40-90m deep) open-pit shells following Whittle optimisation

 

· Potential for 18 months of add-on mine life for the Kiziltepe mining operation if the Kizilcukur area is developed as a satellite mining region

 

· Significant exploration upside along strike and on sub-parallel vein splays; potential remains for resource growth

 

· Mining permit already in place for seven years, as announced on 18 November 2015

 

Dr. Kerim Sener, Managing Director, commented:

 

"This is a very encouraging result from our first drilling programme at Kizilcukur. For only 1,598m drilled we have been able to expand the Mineral Resource by approximately 100%. This represents an exploration discovery cost of approximately US$7 per ounce, which has again emphasised how cost-effectively we are able to deliver on our exploration programmes.

 

The merits of Kizilcukur as a potential satellite operation to the Kiziltepe Mine are obvious, as early scoping works point to a potential 18 months of additional combined project mine life. In addition, due to the high grades encountered at Kizilcukur, the ore is of higher value on a dollar per tonne basis than some existing Kiziltepe satellite pits, so it would be logical to bring Kizilcukur forward in the mining schedule for Red Rabbit. Consequently, we will be discussing the potential sale of Kizilcukur in to the Red Rabbit joint venture with our partners over the coming months."

Resource Estimate

Following the completion of a 1,598m Reverse Circulation ("RC") drilling programme in November 2015 (See 18 January 2016 Announcement), geological consultants Odessa Resources Pty. Ltd. undertook a resource estimate for Kizilcukur. The previous estimate, completed in 2013, identified a JORC 2004 compliant Inferred Mineral Resource of 162,000 tonnes at 2.39g/t gold and 48.5g/t silver, for 16,600 oz gold equivalent, based on 17 historic diamond drill holes. The addition of 26 new infill and extension drill holes at Kizilcukur has increased the Mineral Resource by approximately 100% (c.308,000 tonnes at 2.11g/t gold + 73.4g/t silver) and has confirmed northwest and southeast strike extensions of the Main Vein.

The new Kizilcukur JORC 2012 compliant Mineral Resource estimate has been defined by 43 holes on 75 cross-sections with 10m section spacing (see JORC Table 1). Wireframes were constructed using sectional polylines defined by a cut-off of 0.5 g/t gold. Four lodes were created from the sectional interpretations, which are orientated at 315 degrees (NW) and dip steeply at 85 degrees towards the southwest (Figure 1). No top-cut was applied and a bulk density of 2.55 g/cm3 was assumed for the whole resource. Grade interpolation was by the Inverse Distance Squared ("ID2") method.

Whittle Optimisation

Whittle Pit Optimisation Software was used by Auralia Mining Consulting Pty. Ltd. to define pit shells on all-materials that contained grade within the resource block model. The optimisation work generated three pit shells, to be referred to hereon as the Zeki, Ziya and Zafer pit shells (Figure 1). The Whittle base case optimisation work was run using the parameters provided in Table 2. The Zeki pit shell is the largest with dimensions of 315 x 140 x 90m, followed by the Ziya (220 x 75 x 60m) and Zafer (140 x 50 x 40m) pit shells. The output of the Whittle optimisations is provided in Table 3. It is important to note that actual pit designs may vary from these optimised pit shells based on a variety of factors that will result from an increase in the accuracy and definition of future work, notably additional confirmatory drilling, geotechnical analysis and mine planning.

Metallurgy

Kizilcukur ore typically consists of oxidised quartz veins containing gangue manganese, rhodochrosite and haematite. Deeper within the vein system (+80m from surface) sulphide minerals become recognisable, mainly in the form of pyrite, chalcopyrite, galena and sphalerite. No metallurgical studies have been completed on the mineralisation to date, though samples for initial bottle-roll testwork are in the process of being prepared and sent for analysis. As much of the current resource sits within pit shells to a maximum depth of 90m, oxide ore will be the focus of metallurgical test work.

Exploration Potential

To date, only 35% of the total vein system has adequately been tested by drilling. Future drilling will need to target significant soil anomalies (up to 5 ppm gold), identified on the south-eastern flanks of the Kizilcukur vein system (Figure 2). Induced Polarisation (IP) studies completed in 2011 also generated several additional targets which remain untested. These suggest the vein system locally jogs in places, possibly due to faulting and/or later dyke intrusion. Two other complementary resistivity/chargeability anomalies are also identified along strike of the primary ore zones (Figure 2). These targets will need to be followed-up in future drilling, with estimated target depths of 70-90m below surface.

Details of the Kizilcukur Project

 

The Kizilcukur Project consists of one mining licence located in the Balikesir Province in Western Turkey (coordinates: 626150 m E; 4360440 m N). The property lies 22km to the northeast (straight line) and 50km by road from the Kiziltepe Sector of the Company's Red Rabbit Project. A royalty will be payable to Dogu Akdeniz Mineralleri San. ve Tic. Ltd. of 2% Net Smelter Return on commercial production from the Project. Ariana has the option to sell the project to Zenit Madencilik San. ve Tic. A.S. (the operating company for the Kiziltepe Mine) at three times the exploration cost.

 

The Project covers an area containing a series of sub-parallel quartz veins hosted by ophiolitic units that trend northwest and extend for at least two kilometres. The Main Vein exhibits classic low-sulphidation epithermal features and attains a maximum true width of 8m. The western quartz vein extends over a strike length of 820m. Composite rock-chip sampling of 80m strike along this quartz vein returned encouraging assay results of 6m at 3.3 g/t gold, 2m at 9.6g/t gold and 1m at 7.2 g/t gold. The peak rock-chip assay result in this area was 152 g/t gold and 1,320 g/t silver.

 

Click on, or paste the following link into your web browser, to view the associated PDF document:

 

http://www.rns-pdf.londonstockexchange.com/rns/2135R_-2016-3-7.pdf

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

Kerim Sener, Managing Director

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Beaufort Securities Limited

Tel: +44 (0) 20 7382 8300

Jon Belliss

Loeb Aron & Company Ltd.

Tel: +44 (0) 20 7628 1128

John Beresford-Peirse

IFC Advisory Limited

Tel: +44 (0) 20 3053 8671

Tim Metcalfe

Graham Herring

Heather Armstrong

 

 

Editors' Note:

 

Competent Person

 

The information in this report that relates to Mineral Resources is based on information compiled by Mr. Alfred Gillman of Odessa Resources Pty. Ltd., who is a fellow of the Australasian Institute of Mining and Metallurgy. Mr. Gillman is a consultant to Ariana Resources plc and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration and to the subject matter of the report to qualify as Competent Person and defined in the 2012 edition of the Australasian Code for the Reporting of Exploration Results Mineral Resources and Ore Reserves (JORC Code). Mr. Gillman consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

About Ariana Resources

 

Ariana is an exploration and development company focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey. The Company is developing a portfolio of prospective licences selected on the basis of its in-house geological and remote-sensing database, on its own in western Turkey and in Joint Venture with Eldorado Gold Corporation in north-eastern Turkey. Eldorado owns 51% of this joint venture and are fully funding all exploration work on the JV properties, while Ariana owns 49%. The total resource inventory within this JV is 1.09 million ounces of gold.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, are presently being assessed as to their economic merits and now form part of a Joint Venture with Proccea Construction Co. The total resource inventory at the Red Rabbit Project stands at 475,000 ounces of gold equivalent.

 

Beaufort Securities Limited and Loeb Aron & Company Ltd. are joint brokers to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

 

Glossary of Technical Terms:

 

"Ag" the chemical symbol for silver;

 

"Au" the chemical symbol for gold;

 

"cut-off grade" The lowest grade, or quality, of mineralised material that qualifies as economically mineable and available in a given deposit. May be defined on the basis of economic evaluation, or on physical or chemical attributes that define an acceptable product specification;

 

"g/t" grams per tonne;

 

"Indicated resource" a part of a mineral resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed;

 

"Inferred resource" a part of a mineral resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and has assumed, but not verified, geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that may be limited or of uncertain quality and reliability;

 

"Inverse Distance Squared" a conventional mathematical method used to calculate mineral resources. Near sample points provide a greater weighting than samples further away for any given resource block;

 

"JORC" the Joint Ore Reserves Committee;

 

"JORC 2004" is the previous edition of the JORC Code, which was published in 2004. It has been superseded by JORC 2012;

 

"JORC 2012" is the current edition of the JORC Code, which was published in 2012. After a transition period, the 2012 Edition came into mandatory operation in Australasia from 1 December 2013;

 

"m" Metres;

 

"oz" Ounces;

 

"t" Tonnes;

 

"Whittle" computer software that uses the Lerch-Grossman algorithm, which is a 3-D algorithm that can be applied to the optimisation of open-pit mine designs. The purpose of optimisation is to produce the most cost effective and most profitable open-pit design from a resource block model.

 

 

Ends

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLJRMRTMBAMMAF
Date   Source Headline
9th May 20247:00 amRNSDokwe Gold Project Revised Pre-Feasibility Study
3rd May 20247:00 amRNSAttendance at 121 Mining Investment, London
1st May 20247:00 amRNS2024 Production Guidance
29th Apr 20247:00 amRNSAriana Resources to host Investor Webinar
25th Apr 20247:00 amRNSMerger with Rockover Holdings and Dual-List on ASX
11th Apr 20245:37 pmRNSHolding(s) in Company
26th Mar 20247:00 amRNSResource and Reserves Update
12th Mar 20247:00 amRNSHigh-Grade Drilling Results at Tavsan
22nd Feb 20247:00 amRNSFinal Drilling Results Received for Kizilcukur
15th Feb 20247:00 amRNSDokwe Due-Diligence Update
31st Jan 20247:00 amRNSAsgard Portfolio Update
17th Jan 20247:00 amRNS2023 Production Results and General Update
21st Dec 20237:00 amRNSSignificant New Drilling Results at Tavsan
6th Dec 20237:00 amRNSFurther Positive Drilling Results at Hizarliyayla
4th Dec 20237:00 amRNSCorporate Presentation
30th Nov 20237:00 amRNSSignificant Drilling Results at Salinbas
28th Nov 20237:00 amRNSDrilling Completed at Kizilcukur
22nd Nov 20237:00 amRNSDue Diligence Drilling Commences in Zimbabwe
20th Nov 20237:00 amRNSAttendance at Mines and Money London
13th Nov 20237:00 amRNSYear-End Update on Asgard Investments
18th Oct 20237:00 amRNSWestern Tethyan - Diamond Drilling Commences
29th Sep 20239:00 amRNSInterim Results
6th Sep 20237:00 amRNSWestern Tethyan - Slivova Positive PEA
23rd Aug 202310:00 amRNSGold Sponsor at the Society of Economic Geologists
16th Aug 20237:00 amRNS2023 Half-Year Production Results
15th Aug 20237:00 amRNSCurrent Exploration & Development at Kiziltepe
24th Jul 20237:00 amRNSKizilcukur Drilling and New Geophysical Targets
20th Jul 20237:00 amRNSVenus Minerals IPO Proceeding
19th Jul 20237:00 amRNSTavsan Mine Construction Recommences
17th Jul 20237:00 amRNSWestern Tethyan - Slivova Resource Update
29th Jun 202311:06 amRNSResult of AGM
21st Jun 20237:00 amRNSHizarliyayla Discovery Drilling
19th Jun 20237:00 amRNSSignificant Drilling Results at Salinbas & Ardala
12th Jun 20237:00 amRNSResolutions for AGM and proxy vote form
8th Jun 20237:00 amRNSHolding(s) in Company
7th Jun 20237:00 amRNSInvestor Presentation
6th Jun 20237:00 amRNSFinal Results For The Year Ended 31 December 2022
10th May 20237:00 amRNSWestern Tethyan Completes Slivova Gold Agreement
3rd Apr 20237:00 amRNSAppointment of Joint Broker
20th Mar 20237:00 amRNSInvestor Event In London
15th Mar 20237:00 amRNS2023 Production Guidance
14th Mar 20237:00 amRNSProject Leopard: First Exploration Licenses Given
13th Mar 20237:00 amRNSGeophysical Survey Results At Kepez
7th Mar 20237:00 amRNSVenus Financing and IPO Update
3rd Mar 20233:59 pmRNSTavsan Mine Construction Update
2nd Mar 20237:00 amRNSWestern Tethyan Completes Due Diligence
27th Feb 20237:00 amRNSInvestor Presentation
22nd Feb 20237:00 amRNSGeophysical Survey Results at Kiziltepe
25th Jan 20237:00 amRNSSUBSTANTIAL DRILLING PROGRESS AT SALINBAS
20th Jan 20237:00 amRNS2022 PRODUCTION RESULTS AND GENERAL UPDATE

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.