The next focusIR Investor Webinar takes place tomorrow with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.75
Bid: 2.60
Ask: 2.90
Change: 0.05 (1.85%)
Spread: 0.30 (11.538%)
Open: 2.70
High: 2.85
Low: 2.70
Prev. Close: 2.70
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kiziltepe Vein System Extended

1 Feb 2016 07:00

RNS Number : 5489N
Ariana Resources PLC
01 February 2016
 

 

 

1 February 2016

AIM: AAU

 

Ariana Resources plc

 

KIZILTEPE VEIN SYSTEM EXTENDED

 

Ariana Resources plc ("Ariana" or "the Company"), is pleased to announce the results from its final phase of drilling at Kiziltepe in 2015. Kiziltepe is part of the Red Rabbit Joint Venture with Proccea Construction Co. and will be 50% owned by Ariana once mine construction is completed in H2 2016.

 

Highlights:

 

Three new exploration holes into Arzu Central, between the Arzu North and Arzu South production areas, confirms the potential of a 600m extension to the known mineralised strike length of the Arzu vein system.  Best intercepts from this area include, 22m @ 2.93g/t gold + 29.76 silver, 10m @ 2.32 g/t gold + 46.79g/t silver and 5m @ 0.99g/t gold + 13.62 g/t silver. Near surface pre-production drilling over Arzu South provides for advanced scheduling before open-pit mining commences. Best pre-production drilling results include, 5m @ 3.23 g/t gold + 68.60g/t silver, 3m @ 4.98g/t gold + 74.57 silver and 4m @ 3.38 g/t gold + 76.40 g/t silver.

 

Dr. Kerim Sener, Managing Director, commented:

 

"This is an extremely exciting development in the exploration of the Kiziltepe Mine area. We have now confirmed the potential for Arzu Central to contain mineralisation of the same calibre as the rest of the Arzu vein system. The results are fully in line with our expectations following the establishment an Exploration Target in this area, which has the potential to double the current resources at Kiziltepe and will become a key focus for further exploration efforts. In time, such additions to the resource base may further increase the mine life of Kiziltepe well beyond the eight years currently planned. In addition, we are pleased to note that we will be submitting new forestry permit applications to enable drilling through this area as part of a broader programme.

 

"We are very encouraged by these results, following in such quick succession after the excellent drilling results from our Kizilcukur site, as announced on 18 January 2016. We look forward to announcing further exploration drilling results during early 2016. Such results are contributing significantly to our view that there will be extensions to the projected mine life at the Kiziltepe Mine."

 

 

Drilling Programme

 

In early October 2015, Ariana Resources successfully completed a series of deep (up to 150m) exploration holes at Arzu South (as announced 1 December 2015). Following the results of this initial phase of drilling, a second phase of exploration drilling was planned for Kiziltepe. This final phase of drilling, completed in early December 2015, was undertaken to achieve two objectives:

 

1) Drill three deep (up to 150m) exploration holes; two on the northernmost accessible limits of the Arzu South vein, and one hole drilling the southern-most limits of the Arzu North vein.

 

2) Drill eleven shallow (10 to 30m) pre-production holes, testing the Arzu South vein near surface, where the Company expects to start open-pit mining operations.

In this phase of work, a total of 614m of Reverse Circulation ("RC") drilling was completed at Kiziltepe (Table 1). Of this, 357m was used to test part of the Arzu Central Target between the planned Arzu South and Arzu North production pits; an area which demonstrates potential to host significant mineralisation over a further 600m of strike length (Figure 1 and 2). Arzu Central first demonstrated significant potential for mineralisation during an exploration drilling campaign in 2011/2, where drilling on an extension of the Derya vein intercepted "bonanza" grade mineralisation; 12.1m @ 13.1 g/t gold + 187.6 g/t silver (16.5 g/t gold equiv.), including 1m @ 65.9g/t gold + 760 g/t silver (79.7g/t gold equiv.), as announced 20 May 2012 (Figure 1). The 2015 drilling, aimed to test the northern-most extension of Arzu South, and the southern-most extension of Arzu North, in order to increase the Company's confidence that a non-outcropping mineralised corridor exists between these two areas.

Two fenced holes were drilled on the Arzu South side of the Arzu Central Target. This was necessary to better understand the geometry of the mineralisation beneath a cover unit of pumice rhyodacite ignimbrite. Hole KTP-RC07-15, from 69m to 78m, intercepted an eight metre mineralised quartz vein, with no outcrop seen in the cap-rock at surface. 600m further along strike to the northwest, a single hole was drilled from the Arzu North end of the Arzu Central Target. This hole was drilled due south into a region where the Arzu North quartz vein is obscured beneath the rhyodacite cap-rock unit. Hole KTP-RC19-15, from 105m to 110m, intercepted a five metre mineralised quartz vein.

Significant vein intercepts as identified in this drilling programme add confidence to the potential of the Arzu Central Target to host an additional 92,000 oz gold and 1,100,000 silver (as announced 23 May 2013). This area will need to be drill-tested further to improve confidence in this area to significantly add to the current resource base and to determine whether the vein system in this area will be amenable to underground mining in the future (Figure 3).

The Arzu South pre-production drilling totalled 255m for 11 holes, testing quartz vein mineralisation to an average depth of 23m. All holes intercepted their targets as expected and provide infill results to confirm near surface grade distribution. With open-pit mining currently planned to commence ahead of the summer, the completed pre-production holes will help inform advanced scheduling before mining operations are initiated.

 

In 2015, Ariana successfully completed a total of 1,208 metres of RC drilling within the Kiziltepe Mine area. The results for phase one (594m) were announced on the 1 December 2015, with phase two (614m) released here. Both phases of drilling demonstrate the potential to significantly grow the Kiziltepe resource; current JORC reserves - 1.1M tonnes @ 3.1 g/t gold and 39.8 g/t silver for 115,000 oz gold and 1,470,00 oz silver.

 

Sampling and Assaying Procedures

 

Samples were selected based on geological logging of RC chips during drilling, and sent for assay. All samples from the drilling programme undertaken by Ariana Resources plc, were prepared and assayed by 30g fire assay, and ICP-MS multi-element analysis, at the ALS Global preparation facility in Izmir. Routine re-assaying of all samples assaying greater than 10 g/t of gold and 100 g/t of silver has also been completed by ALS Global. Standard, blank and duplicate samples are being used in the sample batches, which is in line with the Company's quality control procedures. Laboratory sample preparation, assaying procedures and chain of custody are appropriately controlled. The Company maintains an archive of reference RC chip samples, in addition to all sample pulps and splits.

 

Click on, or paste the following link into your web browser, to view the associated PDF document:

http://www.rns-pdf.londonstockexchange.com/rns/5489N_1-2016-1-31.pdf 

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

 

Kerim Sener, Managing Director

 

 

 

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

 

 

 

Beaufort Securities Limited

Tel: +44 (0) 20 7382 8300

Jon Belliss

 

 

 

Loeb Aron & Company Ltd.

Tel: +44 (0) 20 7628 1128

John Beresford-Peirse

 

 

 

IFC Advisory Limited

Tel: +44 (0) 20 3053 8671

Tim Metcalfe

Graham Herring

Heather Armstrong

 

 

 

Editor's Notes:

 

Dr Kerim Sener, BSc (Hons), MSc, PhD, is the Managing Director of Ariana Resources plc. A graduate of the University of Southampton in Geology, he also holds a Master's degree from the Royal School of Mines (Imperial College, London) in Mineral Exploration and a doctorate from the University of Western Australia. He is a Fellow of The Geological Society of London and has worked in geological research and mineral consultancy in Africa, Australia and Europe. He has read and approved the technical disclosure in this regulatory announcement.

 

About Ariana Resources:

 

Ariana is an exploration and development company focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey. The Company is developing a portfolio of prospective licences selected on the basis of its in-house geological and remote-sensing database, on its own in western Turkey and in Joint Venture with Eldorado Gold Corporation in north-eastern Turkey. Eldorado owns 51% of this joint venture and are fully funding all exploration work on the JV properties, while Ariana owns 49%. The total resource inventory within this JV is 1.09 million ounces of gold.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, are presently being assessed as to their economic merits and now form part of a Joint Venture with Proccea Construction Co. The total resource inventory at the Red Rabbit Project stands at 475,000 ounces of gold equivalent.

 

Beaufort Securities Limited and Loeb Aron & Company Ltd. are joint brokers to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

 

Glossary of Technical Terms:

 

"g/t" grams per tonne

 

"JORC" the Joint Ore Reserves Committee

 

"m" Metres

 

"oz" Ounces

 

"Au" Gold

 

"Ag" Silver

 

 

Ends

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBBMLTMBIJBRF
Date   Source Headline
9th May 20247:00 amRNSDokwe Gold Project Revised Pre-Feasibility Study
3rd May 20247:00 amRNSAttendance at 121 Mining Investment, London
1st May 20247:00 amRNS2024 Production Guidance
29th Apr 20247:00 amRNSAriana Resources to host Investor Webinar
25th Apr 20247:00 amRNSMerger with Rockover Holdings and Dual-List on ASX
11th Apr 20245:37 pmRNSHolding(s) in Company
26th Mar 20247:00 amRNSResource and Reserves Update
12th Mar 20247:00 amRNSHigh-Grade Drilling Results at Tavsan
22nd Feb 20247:00 amRNSFinal Drilling Results Received for Kizilcukur
15th Feb 20247:00 amRNSDokwe Due-Diligence Update
31st Jan 20247:00 amRNSAsgard Portfolio Update
17th Jan 20247:00 amRNS2023 Production Results and General Update
21st Dec 20237:00 amRNSSignificant New Drilling Results at Tavsan
6th Dec 20237:00 amRNSFurther Positive Drilling Results at Hizarliyayla
4th Dec 20237:00 amRNSCorporate Presentation
30th Nov 20237:00 amRNSSignificant Drilling Results at Salinbas
28th Nov 20237:00 amRNSDrilling Completed at Kizilcukur
22nd Nov 20237:00 amRNSDue Diligence Drilling Commences in Zimbabwe
20th Nov 20237:00 amRNSAttendance at Mines and Money London
13th Nov 20237:00 amRNSYear-End Update on Asgard Investments
18th Oct 20237:00 amRNSWestern Tethyan - Diamond Drilling Commences
29th Sep 20239:00 amRNSInterim Results
6th Sep 20237:00 amRNSWestern Tethyan - Slivova Positive PEA
23rd Aug 202310:00 amRNSGold Sponsor at the Society of Economic Geologists
16th Aug 20237:00 amRNS2023 Half-Year Production Results
15th Aug 20237:00 amRNSCurrent Exploration & Development at Kiziltepe
24th Jul 20237:00 amRNSKizilcukur Drilling and New Geophysical Targets
20th Jul 20237:00 amRNSVenus Minerals IPO Proceeding
19th Jul 20237:00 amRNSTavsan Mine Construction Recommences
17th Jul 20237:00 amRNSWestern Tethyan - Slivova Resource Update
29th Jun 202311:06 amRNSResult of AGM
21st Jun 20237:00 amRNSHizarliyayla Discovery Drilling
19th Jun 20237:00 amRNSSignificant Drilling Results at Salinbas & Ardala
12th Jun 20237:00 amRNSResolutions for AGM and proxy vote form
8th Jun 20237:00 amRNSHolding(s) in Company
7th Jun 20237:00 amRNSInvestor Presentation
6th Jun 20237:00 amRNSFinal Results For The Year Ended 31 December 2022
10th May 20237:00 amRNSWestern Tethyan Completes Slivova Gold Agreement
3rd Apr 20237:00 amRNSAppointment of Joint Broker
20th Mar 20237:00 amRNSInvestor Event In London
15th Mar 20237:00 amRNS2023 Production Guidance
14th Mar 20237:00 amRNSProject Leopard: First Exploration Licenses Given
13th Mar 20237:00 amRNSGeophysical Survey Results At Kepez
7th Mar 20237:00 amRNSVenus Financing and IPO Update
3rd Mar 20233:59 pmRNSTavsan Mine Construction Update
2nd Mar 20237:00 amRNSWestern Tethyan Completes Due Diligence
27th Feb 20237:00 amRNSInvestor Presentation
22nd Feb 20237:00 amRNSGeophysical Survey Results at Kiziltepe
25th Jan 20237:00 amRNSSUBSTANTIAL DRILLING PROGRESS AT SALINBAS
20th Jan 20237:00 amRNS2022 PRODUCTION RESULTS AND GENERAL UPDATE

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.