Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.30    -0.025 (-1.89%)
Bid:
1.25
Ask:
1.35
Spread: 0.10 (8.00%)
Market Cap: £17.30m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Project Phoenix Update

19 Aug 2024 07:00

RNS Number : 8971A
88 Energy Limited
19 August 2024
 

This announcement contains inside information

19 August 2024

 

 

88 ENERGY LIMITED

PROJECT PHOENIX UPDATE

 

 

 

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) is pleased to provide an update on the Project Phoenix post flow test program, as well as progress made by its Joint Venture Partner Burgundy Xploration, LLC (Burgundy) regarding their funding and listing plans.

Background; Hickory-1 Discovery Well - Project Phoenix (~75% WI)

The Hickory-1 discovery well was drilled in February 2023 and flow tested during the Alaskan winter season in Q1/Q2 CY24. The testing operations focused on the two shallower primary targets, the SFS and SMD reservoirs. The Upper SFS (USFS) reservoir, previously untested, and the SMD-B reservoir were the primary focus. Each zone was independently isolated, stimulated, and flowed to the surface using nitrogen lift to facilitate efficient well clean-up.

Upper SFS (USFS) flow test results

· Peak flow rate: ~70 bopd

· Maximum oil cut: 15%

· Flow type: Natural flow (no nitrogen lift required)

· Oil samples: Multiple samples with gravities of 39.9 to 41.4 API (light crude oil)

The USFS zone's natural flow to the surface is noteworthy, as adjacent wells required nitrogen lift.

For full details, refer to the ASX announcement dated 2 April 2024.

SMD-B flow test results

· Peak flow rate: ~50 bopd

· Maximum oil cut: 10%

· Gas to oil ratio: Low, with little to no measurable gas

· Oil samples: Multiple samples with gravities of 38.5 to 39.5 API (light crude oil)

For full details, refer to the ASX announcement dated 15 April 2024.

Post-flow testing and next steps

Pressurised oil samples from both USFS and SMD tests are being analysed in Houston, with results expected in Q3 CY24. These results will confirm reservoir fluid characteristics. An Independent Contingent Resource assessment for the Upper SFS, Lower SFS, and SMD-B is anticipated in Q4 CY24. This assessment, in combination with the post-flow test analysis, will guide the next phase of Project Phoenix, including planning for a potential horizontal well production test at the existing Franklin Bluffs gravel pad location.

ResFrac has been engaged to review the Hickory-1 stimulation and flow design, and to model the production potential and optimise the completion strategy for a horizontal well. Additionally, 88E plans to initiate a formal farmout process to attract a strategic partner for future drilling and development.

 

Table 1: Indicative Project Phoenix development timeline.

H1-24

H2-24

H1-25

H2-25

H1-26

H2-26

Successful Hickory-1 flow test

P

Post-well testing and analysis

n

n

Targeted farmout

n

n

Planning/permitting/design for horizontal production test[1]

n

n

n

n

Extended horizontal production test1

n

n

 

Joint Venture Partner Update

Burgundy Xploration, LLC has met its 2023 financial obligations and signed the flow test Authority For Expenditure (AFE) on 15 February 2024. Under a standstill agreement executed in December 2023 with 88E's subsidiary, Accumulate Energy Alaska, Inc (88E-Accumulate), Burgundy was due to pay its share of the AFE cost (approximately US$3 million) by no later than 15 August 2024, through either a public listing or a private capital raise. If the obligation remained unpaid, Burgundy was to transfer 50% of its working interest in the Toolik River Unit leases to 88E-Accumulate.

Burgundy Xploration, LLC is a private Texas company historically funded by sophisticated oil and gas investors that has invested more than US$25 million into Project Phoenix over the life of the project. 88E understands that Burgundy's plans for a public listing are progressing well including the recent recruitment of a board and senior oil and gas executive with significant public company (AIM, TSX, and US markets) experience and success to facilitate the company's potential public listing.

After an extensive internal and third-party review of the latest Project Phoenix data by Burgundy, advanced discussions are underway in relation to a potential transaction whereby Burgundy would provide a carry to 88E across an anticipated 2025/26 work program to include (but not be limited to) the drilling, completion and extended flow testing of a horizontal well on the Dalton Highway in return for additional working interest in the Project. Any carry would by subject to Burgundy raising the capital required. Accordingly, at this stage there is no guarantee that a transaction with Burgundy will be completed.

Given the deadline on the previous standstill agreement, Burgundy has committed to a payment of US$0.35 million in the near term in return for the Company extending the December 2023 standstill agreement for outstanding Flow Test AFE costs until December 31, 2024. Given this commitment, Burgundy's intentions to proceed with a listing public listing, as well as the ongoing negotiations with the Company for a horizontal well carry, 88E has agreed to a further extension of the standstill arrangement.

Should Burgundy fail to meet its obligations by the revised deadline, the Company retains its rights under the joint operating agreement to enforce its terms if necessary.

 

This announcement has been authorised by the Board.

 

Media and Investor Relations

 

88 Energy Ltd

Ashley Gilbert, Managing Director

Tel: +61 8 9485 0990

Email: investor-relations@88energy.com

 

Fivemark Partners, Investor and Media Relations

Michael Vaughan Tel: +61 422 602 720

 

Euroz Hartleys Ltd, Dale Bryan Tel: + 61 8 9268 2829

 

Cavendish Capital Markets Limited Tel: + 44 131 220 6939

Pearl Kellie / Derrick Lee


[1] Subject to farm-out/funding as well as government and other approvals

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEASPNFSALEEA
Date   Source Headline
5th Sep 20227:00 amRNSSelection of Drilling Location in Icewine East
23rd Aug 20227:00 amRNSProject Icewine East Prospective Resource Estimate
11th Aug 20228:20 amRNSPlacement to raise A$14.9M
10th Aug 20222:00 pmRNSPrice Monitoring Extension
10th Aug 202211:05 amRNSSecond Price Monitoring Extn
10th Aug 202211:00 amRNSPrice Monitoring Extension
10th Aug 20227:03 amRNSProposed placing to raise up to A$10 million
10th Aug 20227:00 amRNSIcewine East - Maiden Prospective Resource
10th Aug 20227:00 amRNSInterim Report
18th Jul 20222:00 pmRNSPrice Monitoring Extension
14th Jul 20227:00 amRNSQuarterly Report and Appendix 5B
13th Jul 20224:40 pmRNSSecond Price Monitoring Extn
13th Jul 20224:35 pmRNSPrice Monitoring Extension
13th Jul 202211:05 amRNSSecond Price Monitoring Extn
13th Jul 202211:00 amRNSPrice Monitoring Extension
13th Jul 20229:05 amRNSSecond Price Monitoring Extn
13th Jul 20229:00 amRNSPrice Monitoring Extension
12th Jul 20224:40 pmRNSSecond Price Monitoring Extn
12th Jul 20224:36 pmRNSPrice Monitoring Extension
12th Jul 202211:06 amRNSSecond Price Monitoring Extn
12th Jul 202211:00 amRNSPrice Monitoring Extension
5th Jul 20222:01 pmRNSPrice Monitoring Extension
27th Jun 20227:00 amRNSProjects Update: Icewine East & Longhorn
16th May 20227:59 amRNSAGM Results
16th May 20227:00 amRNSAGM Presentation
9th May 20222:40 pmRNSProject Icewine – Independent Third-Party Mapping
14th Apr 20227:00 amRNSNotice of AGM
14th Apr 20227:00 amRNSQuarterly Report and Appendix 5B
12th Apr 20227:00 amRNSProject Longhorn-Texas Oil & Gas Production Update
8th Apr 20227:00 amRNSProject Icewine - Preliminary Mapping Complete
30th Mar 20229:05 amRNSSecond Price Monitoring Extn
30th Mar 20229:00 amRNSPrice Monitoring Extension
29th Mar 20222:05 pmRNSSecond Price Monitoring Extn
29th Mar 20222:00 pmRNSPrice Monitoring Extension
29th Mar 202211:21 amRNSWireline Logging Results at Merlin-2
23rd Mar 20227:00 amRNSMerlin-2 Well Reaches Total Depth
22nd Mar 20227:29 amRNSAnnual Report Shareholder Disclosures
18th Mar 20227:00 amRNSASX LODGEMENT OF ANNUAL REPORT
17th Mar 20227:00 amRNSMerlin-2 Drilling Ahead
8th Mar 20222:21 pmRNSMerlin-2 Well Spudded
4th Mar 20227:00 amRNSProject Icewine Update
1st Mar 20227:00 amRNSMerlin-2 Pre-Spud Operations On Track
25th Feb 202211:05 amRNSSecond Price Monitoring Extn
25th Feb 202211:00 amRNSPrice Monitoring Extension
22nd Feb 20227:00 amRNSIssue of Equity
21st Feb 20227:00 amRNSAcquisition of Texas Oil and Gas Production Assets
14th Feb 20227:00 amRNSCorporate Presentation
14th Feb 20227:00 amRNSPlacement to raise A$32M
10th Feb 20229:05 amRNSSecond Price Monitoring Extn
10th Feb 20229:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.