Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.325    0.00 (0.00%)
Bid:
1.20
Ask:
1.45
Spread: 0.25 (20.833%)
Market Cap: £17.30m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Merlin-2 Well Spudded

8 Mar 2022 14:21

RNS Number : 0692E
88 Energy Limited
08 March 2022
 

This announcement contains inside information

8 March 2022

88 Energy Limited

Merlin-2 Well Spudded

Highlights

· Drilling of the Merlin-2 appraisal well has commenced.

· Initial surface hole to be drilled to approx. 2,000 feet, cased and BOP system tested.

· Drilling then set to deepen through the N18, N19 and N20 target horizons to the maximum planned Total Depth of approx. 8,000 feet.

 

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) is pleased to report that the Arctic Fox rig commenced drilling the Merlin-2 appraisal well, located in Project Peregrine in the NPR-A region of the North Slope of Alaska, at 7:00pm on 7th March 2022 (Alaska time).

The Merlin-2 appraisal well is planned for a Total Depth (TD) of approximately 8,000 feet, and is targeting 652 million barrels of oil1,2 in the highly prospective N18, N19 and N20 targets that were encountered in the successful Merlin-1 well (drilled in March 2021 to a depth of 5,267 feet).

The well is to be initially drilled to approximately 2,000 feet, with the surface casing then installed and the Blow Out Preventer (BOP) system tested. This is anticipated to take approximately one week in total. Drilling is then set to deepen the well through the N18, N19 and N20 target horizons in the Nanushuk Formation to the planned TD. This deeper drilling is anticipated to take up to approximately four weeks.

Logging while drilling and mudlogging will provide initial indications as to the prospectivity of the target horizons at the Merlin-2 location. After reaching TD, it is planned to run a more sophisticated wireline logging program, which includes collection of down hole samples and side wall cores.

A production test program for the Merlin-2 well has been designed and equipment placed on standby during initial well site operations. Flow testing of Merlin-2 will be contingent upon the wireline results, in particular the MDT outcomes, as well as government approvals and weather window considerations.

1 Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

2 Mean unrisked prospective resource - Net Entitlement to 88 Energy. Refer announcement released to ASX on 16 August 2021

 

The graphics below can be viewed in the pdf version of this announcement, which is available on the Company's website www.88energy.com:

 

· Figure 1. Wireframe image showing respective Merlin-1 and Merlin-2 well locations, facing east and overlain with predicted reservoir sands profile.

· Map of Project Peregrine and Recent Nanushuk Discoveries

 

Media and Investor Relations:

88 Energy Ltd

Ashley Gilbert, Managing Director

Tel: +61 8 9485 0990

Email:investor-relations@88energy.com

Finlay Thomson, Investor Relations

Tel: +44 7976 248471

Fivemark Partners, Investor and Media Relations

Andrew Edge / Michael Vaughan

Tel: +61 410 276 744

Tel: +61 422 602 720

EurozHartleys Ltd

Dale Bryan

Tel: +61 8 9268 2829

Cenkos Securities

Neil McDonald / Derrick Lee

Tel: +44 131 220 6939

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 35 years' experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist/Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the resource and reserve estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

 

About Project Peregrine

Project Peregrine is located in the NPR-A region of the North Slope of Alaska and encompasses approximately 195,000 contiguous acres. It is situated on trend to recent discoveries in a newly successful play type in topset sands in the Nanushuk formation. 88 Energy has a 100% working interest in the project.

The Merlin-1 well was spudded in March 2021 with drilling operations completed in April 2021. Interpretation of results was completed in August 2021 with post-well evaluation successfully demonstrating the presence of oil in N20, N19 and N18 targets, with 41 feet of net log pay across the three reservoir intervals noted and geochemical analysis determining the oil to have an estimated API gravity between mid-30 to low-40 API (light oil).

A second well, the Merlin-2 appraisal well, spudded in early March 2022 as a follow-up well to the Merlin-1 exploration well. Merlin-2 is targeting a net entitlement mean Prospective Resource of 652 million barrels (unrisked)1,2.

To view the Company's video and animated presentations of Project Peregrine, as well as the Merlin-1 well results and details of the Merlin-2 well, please click on the link to the 88 Energy website www.88energy.com.

Independent oil and gas reservoir evaluation consultancy, ERCE Australia Pty Ltd (ERCE), conducted an updated assessment of the Project Peregrine prospective resources post the Merlin-1 well results. The updated prospective resource estimates and risking assessments for Project Peregrine are noted below.

Revised Project Peregrine Prospective Resources

Project Peregrine: Alaska North Slope

Unrisked Net Entitlement to 88E 1, 4 Prospective Oil Resources (MMstb)

Prospects (Probabilistic Calculations)

Low (1U)

Best (2U)

High (3U)

Mean

COS 3

Merlin-2 (Nanushuk - N20, N19 and N18)

64

329

1,467

652

56%

Merlin-1A (Nanushuk - N14S)

25

87

282

132

17%

Harrier (Nanushuk)

41

175

796

353

24%

Harrier Deep (Torok)

35

226

1,132

486

20%

Prospects Total

1,6242

 

1. The Prospective Resources presented here are the result of a risked probabilistic aggregation of the individual stacked prospective layers in each prospect; the success case estimates present the distribution of possible outcomes in the event that at least one prospective layer is successful.

2. Unrisked mean total is not representative of the expected total from the four prospects and assumes a success case in all four wells.

3. COS represents the geological chance of success of at least one of the stacked layers which comprise each prospect. This excludes phase risk which ERCE has estimated to be 70% oil (30% gas). The Prospective Resources have also not been adjusted for the chance of development, which is estimated by 88 Energy to be 60% (including phase risk), ERCE sees this as reasonable based on the data available. Quantifying the chance of development (COD) requires consideration of both economic contingencies and other contingencies, such as legal, regulatory, market access, political, social license, internal and external approvals and commitment to project finance and development timing. As many of these factors are out-with the knowledge of ERCE they must be used with caution.

4. Gross Prospective Resources include off-block volumes over which 88 Energy has no mineral rights. Net working interest Prospective Resources are based on the on-block volumes and 88 Energy's 100% working interest. Net entitlement Prospective Resources are the net working interest Prospective Resources less royalties payable to others. The net entitlement interest to 88 Energy is calculated as 84.7% of net working interest after deduction of state royalty (12.5%) and overriding royalty interests (1.3%and 1.5%).

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEALDPEFNAEFA
Date   Source Headline
26th May 20267:00 amRNSAGM Results
20th May 20267:00 amRNSSouth Prudhoe Augusta-1 Exploration Well Update
18th May 20267:00 amRNSSouth Prudhoe Prospective Resource Upgrade
11th May 20267:00 amRNSAmended PEL93 Farm-In Terms and Exploration Update
7th May 20267:00 amRNSRig Secured for Augusta-1 Exploration Well
27th Apr 20267:00 amRNSProject Phoenix - PA Amendment
24th Apr 20267:00 amRNSNotice of Annual General Meeting
16th Apr 20267:00 amRNSQuarterly Report and Appendix 5B
7th Apr 20267:00 amRNSKad River 3D Survey Secured
30th Mar 20267:00 amRNSAugusta-1 Exploration Well Planning Underway
27th Mar 20267:00 amRNSSuccessful Placement to Raise A$5 Million
25th Mar 20267:37 amRNSProposed placing to raise up to A$5.03 million
23rd Mar 20267:27 amRNSLodgement of Annual Report
10th Mar 20267:00 amRNSCompletion of Small Holding Share Sale Facility
9th Mar 20267:09 amRNSCorporate Presentation
19th Feb 20267:01 amRNSNAPE Presentation
19th Feb 20267:00 amRNSSouth Prudhoe Prospective Resource Update
9th Feb 20269:30 amRNSPEL 93 Update
30th Jan 20267:00 amRNSQuarterly Report and Appendix 5B
27th Jan 20267:00 amRNSSchrader Bluff 3D Seismic Survey Secured
5th Jan 20262:42 pmRNSDirector Dealings
27th Nov 20257:00 amRNSCorporate Presentation
26th Nov 20257:00 amRNSProject Phoenix - 2026 Production Test Program
20th Nov 20257:00 amRNSNew North Slope Acreage Secured
30th Oct 20257:02 amRNSQuarterly Report and Appendix 5B
26th Aug 20257:00 amRNS2025 Half-year Report
22nd Aug 20257:00 amRNSDirectorate Change
18th Aug 20257:00 amRNSSale of Non-Core Permian Basin Interest
1st Aug 20257:53 amRNSSmall Holding Share Sale Facility Update
22nd Jul 20257:00 amRNSQuarterly Report and Appendix 5B
2nd Jul 20257:00 amRNSLicence Extension & New Program Launched at PEL 93
18th Jun 20258:16 amRNSSmall Holding Share Sale Facility Letter
16th Jun 20259:29 amRNSSmall Holding Share Sale Facility
13th May 20257:30 amRNSRestoration - 88 Energy Limited
12th May 20252:39 pmRNSCompletion of Consolidation of Capital
12th May 20257:30 amRNSSuspension - 88 Energy Limited
8th May 20254:42 pmRNSTemporary Suspension of Trading
6th May 20258:20 amRNSResult of AGM
17th Apr 20257:09 amRNSQuarterly Report and Appendix 5B
4th Apr 20257:00 amRNSNotice of AGM and Proposed Capital Consolidation
31st Mar 20257:00 amRNSReceipt of Outstanding Project Phoenix Funds
12th Mar 20257:00 amRNSNotice of AGM and Director Nomination
11th Mar 20259:21 amRNSLodgement of Annual Report
18th Feb 20257:00 amRNSCorporate Presentation
17th Feb 20257:00 amRNSFarm-out for Project Phoenix Horizontal Test Well
30th Jan 20257:00 amRNSMaiden Prospective Resource for Canning Prospect
21st Jan 20257:00 amRNSQuarterly Report and Appendix 5B
31st Dec 20247:19 amRNSProject Phoenix Update
12th Dec 20247:36 amRNSHighly Prospective New Leases in Alaska
10th Dec 20247:00 amRNSInitial Interpretation of PEL 93 2D Seismic

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.