Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.175    0.00 (0.00%)
Bid:
1.15
Ask:
1.20
Spread: 0.05 (4.348%)
Market Cap: £15.64m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Operations Update

29 Mar 2021 07:00

RNS Number : 7267T
88 Energy Limited
29 March 2021
 

29th March 2021

 

This announcement contains inside information

 

88 Energy Limited

 

Operations Update

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM:88E, OTC:EEENF) is pleased to provide the following update related to its operations in the NPR-A region of the North Slope of Alaska.

 

Highlights

· Interpretation of logging while drilling data ("LWD") indicates multiple potentially hydrocarbon bearing zones have been encountered in the Nanushuk Formation whilst drilling Merlin-1

· Wireline logging will commence shortly to confirm whether mobile hydrocarbons are present

 

Details

The Nanushuk Formation, which contains the primary targets for the Merlin-1 well, was encountered ~600' low to prognosis and is interpreted to be ~500' thicker than that encountered in the wells drilled into the Willow Oil Field ("Analogue Wells") to the north of the Project Peregrine acreage. Encouragingly, the gamma log indicates the presence of more sand packages than those in the Analogue Wells and that the sand packages in Merlin-1 are generally cleaner in nature. Reservoir quality will only be known once analysis of the wireline logging is complete.

 

Oil shows were recorded over multiple intervals in the Nanushuk while drilling Merlin-1, including the primary targets. Fluorescence ranged from relatively weak to moderate "dry" fluorescence with slow to moderate sometimes fast streaming cut when exposed to solvent. Mud gas peaks were also recorded and, although generally not of the same scale of the increase in total gas above background as that seen in the Analogue Wells, one of the prospective horizons in Merlin-1 did have substantially elevated total gas, similar to that in the Analogue Wells. Heavier gas components, including C5, were observed over multiple intervals. Resistivity was elevated over these intervals and is encouraging, particularly in the context that the Nanushuk is considered a low resistivity play type.

 

Fluorescence was also observed in the drilling mud ("pops") accompanied by a petroliferous odour over three of the target intervals. Significantly, one of these intervals is interpreted to be part of a, potentially separate, sand package that is also present in the Harrier prospect.

 

The results are considered encouraging and the wireline program will now be run over the next week to determine the presence of mobile hydrocarbons, post a mandatory test of the Blow Out Preventer. Until the wireline has been completed and interpreted, it will not be possible to define whether a discovery has been made.

 

Managing Director, Dave Wall, commented: "Whilst there is still work to do to confirm a discovery, the results to date are encouraging and we look forward to providing an additional update on the wireline program in 7 to 10 days."

 

About Project Peregrine - Imminent Drilling

Project Peregrine is located in the NPR-A region of the North Slope of Alaska and encompasses ~195,000 contiguous acres. It is situated on trend to recent discoveries in a newly successful play type in topset sands in the Nanushuk formation. 88 Energy has a 100% working interest in the project that will reduce to 50% post the completion of funding as part of a recent farm-in, whereby 88E is carried on the first US$10m (of an estimated US$12.6m total cost) for the Merlin-1 well.

 

The Merlin-1 well is spud in March 2021 and is targeting 645 million barrels of gross mean prospective resource#. Wireline logging at Merlin-1 will commence shortly. A second well, Harrier-1, is planned to be drilled in 2022 and is targeting gross mean prospective resource of 417 million barrels#.

 

Independent Resource Assessment#

 

Project Peregrine: Alaska North Slope

Unrisked Net Entitlement to 88E Prospective Oil Resources (MMstb)

Prospects (Probabilistic Calculations)

Low (1U)

Best (2U)

High (3U)

Mean

COS

Merlin (Nanushuk)

41

270

1,463

645

37%

Harrier (Nanushuk)

48

207

940

417

24%

Harrier Deep (Torok)

42

267

1,336

574

20%

Prospects Total

 

 

 

1,636

 

 

#Please refer to release dated 23 February 2021 for full details with respect to the Prospective Resource estimate, associated risking and applicable Cautionary Statement.

 

Each of the Merlin and Harrier prospects is located on trend to an existing discovery, in the same play type (Nanushuk topsets). This has de-risked the prospects considerably and resulted in a relatively high independently estimated geologic chance of success.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

 

The below graphics can be found in the pdf version of this announcement available from the Company's website;

· Figure 1: Oil Shows: Fluorescence and Cut Observed over Multiple Intervals

· Figure 2: Project Peregrine and Recent Nanushuk Discoveries

· Figure 3Merlin-1 - on trend to large Willow oil field

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

Email: admin@88energy.com 

 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

EurozHartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities Tel: + 44 131 220 6939

Neil McDonald / Derrick Lee

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFIFSEVRIAFIL
Date   Source Headline
20th Mar 20197:00 amRNSAlaska Projects Update
19th Mar 20192:06 pmRNSSecond Price Monitoring Extn
19th Mar 20192:00 pmRNSPrice Monitoring Extension
13th Mar 20194:41 pmRNSSecond Price Monitoring Extn
13th Mar 20194:35 pmRNSPrice Monitoring Extension
13th Mar 201911:05 amRNSSecond Price Monitoring Extn
13th Mar 201911:00 amRNSPrice Monitoring Extension
13th Mar 20197:00 amRNSOperations Update - Winx-1 Final Report
12th Mar 20199:19 amRNSNotice of Annual General Meeting
6th Mar 20194:40 pmRNSSecond Price Monitoring Extn
6th Mar 20194:35 pmRNSPrice Monitoring Extension
6th Mar 20192:05 pmRNSSecond Price Monitoring Extn
6th Mar 20192:00 pmRNSPrice Monitoring Extension
6th Mar 20197:00 amRNSOperations Update - Total Depth Reached
4th Mar 20194:40 pmRNSSecond Price Monitoring Extn
4th Mar 20194:35 pmRNSPrice Monitoring Extension
4th Mar 20197:00 amRNSAdditional Interim Results from Drilling
1st Mar 20199:05 amRNSSecond Price Monitoring Extn
1st Mar 20199:00 amRNSPrice Monitoring Extension
1st Mar 20197:45 amRNSInterim Results from Drilling
26th Feb 20197:30 amRNSDrilling of Primary Target Interval Commences
25th Feb 201910:07 amRNSASX Lodgement of Annual Report
22nd Feb 20197:00 amRNSOperations Update: Surface Casing Successfully Run
18th Feb 20197:00 amRNSOperations Update
15th Feb 20197:00 amRNSOperations Update - Spud on Schedule
5th Feb 20197:00 amRNSOperations Update - Rig Mobilisation Under Way
31st Jan 20197:00 amRNSCorporate Presentation
25th Jan 20197:00 amRNSQuarterly Report & Appendix 5B
24th Jan 20197:00 amRNSOperations Update - Ice Road Nears Completion
17th Jan 20198:00 amRNSOperations Update - Permit to Drill Approved
7th Jan 20197:00 amRNSOperations Update
20th Dec 20187:00 amRNSOperations Update
17th Dec 20187:00 amRNSOperations Update
9th Nov 201811:20 amRNSResult of Placing
8th Nov 20187:00 amRNSProposed placing to raise up to £5.9 million
7th Nov 20187:00 amRNSOperations Update
31st Oct 20187:00 amRNSIssued Share Capital & Appendix 3B
30th Oct 20187:00 amRNSPassing of Brent Villemarette, Non Exec Director
29th Oct 20187:19 amRNSRights Issue Results and Shortfall Notice
29th Oct 20187:00 amRNSQuarterly Report & Appendix 5B
24th Oct 20181:43 pmRNSReplacement: Options Exercise & Performance Rights
24th Oct 20189:46 amRNSExercise of Options & Issue of Performance Rights
23rd Oct 20187:00 amRNSConventional Portfolio Update
12th Oct 20187:46 amRNSRights Issue - Dispatch of Offer Document
5th Oct 201811:23 amRNSRights Issue Timetable - Clarification
5th Oct 20187:00 amRNSRights Issue Notice
3rd Oct 20187:00 amRNSNon-Renounceable Rights Issue / Open Offer
28th Sep 20187:00 amRNSAddendum to Notice of Meeting
28th Sep 20187:00 amRNSOperations Update
17th Sep 20182:16 pmRNSNotice of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.