Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.30    0.00 (0.00%)
Bid:
1.20
Ask:
1.40
Spread: 0.20 (16.667%)
Market Cap: £17.30m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Operations Update - Winx-1 Final Report

13 Mar 2019 07:00

RNS Number : 6726S
88 Energy Limited
13 March 2019
 

13th March 2019

 

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION AS DEFINED IN ARTICLE 7 OF THE MARKET ABUSE REGULATION NO. 596/2014 ("MAR"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

 

 

88 Energy Limited

 

Operations Update - Winx-1 Final Report

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) advises the following in relation to its oil and gas operations on the North Slope of Alaska.

 

Highlights: Winx-1

 

· Comprehensive wireline logging program successfully completed at Winx-1, full petrophysical analysis and review commenced

· Provisional petrophysical analysis of the wireline logging program indicates low oil saturations in the primary Nanushuk Topset objectives; testing and fluid sampling indicates that reservoir quality and fluid mobility at this location is insufficient to warrant production testing, despite encouragement from oil shows and logging while drilling (LWD) data

· Zones of interest in the Torok formation, secondary objectives, were identified on wireline logs, which similarly exhibited low oil saturations and did not flow hydrocarbons during the Modular Formation Dynamics Test (MDT) pressure testing and fluid sampling program

 

Western Leases - Winx-1 Exploration Well

Petrophysical interpretation of the LWD data at Winx-1 indicated elevated resistivities associated with increased mud gas ratios (C1 - C5) in the distinctive Nanushuk Topset sequence comparable with other successful neighbouring wells in the Nanushuk play fairway. Early indications were encouraging and, on this basis, a comprehensive wireline program was undertaken to further evaluate the interval of interest.

 

The wireline program was designed to fully evaluate and quantify the reservoir potential and associated shows in the Nanushuk Topsets. The suite comprised specialist logging tools capable of quantifying laminated pay zones, including nuclear magnetic resonance; a triaxial induction tool that measures both horizontal and vertical resistivity, FMI (formation micro imager) and an MDT program to determine pressure gradients and sample fluids from the zones of interest.

 

Provisional wireline results indicate low oil saturations in the Nanushuk Topsets not conducive to successfully flowing the formation, as borne out by the MDT sampling results, which did not retrieve hydrocarbon samples. Reservoir properties appear to be compromised by dispersed clay in the matrix at Winx-1. This clay is often present in other successful Nanushuk wells but in discrete laminations with decent quality, high resistivity, oil saturated sandstones in between. The dispersed clay in the Nanushuk at Winx impacts both fluid mobility and oil saturations. The clay serves to bind much of the fluid present in place so it cannot flow. It also occupies pore space within the formation, resulting in a lower relative hydrocarbon saturation. This means that, whilst oil is present in the reservoir, there is less of it and it is not mobile. Further evaluation will be undertaken post drill to fully understand the implications of the petrophysical results.

 

The reservoir performance in the Torok Channel Sequence was better than the Nanushuk in the Winx-1 well as evidenced by relatively faster influx of fluid during MDT sampling. On completion of the wireline logging program it is apparent that the oil saturations in the zone of interest are also low and not conducive to hydrocarbon flow. While the oil saturations are evidence of an active petroleum system and charge, further work is required to determine whether there is an effective trapping mechanism at this location.

 

The forward plan is to further evaluate and integrate the valuable data acquired at Winx-1 and reprocess the Nanuq 3D seismic (2004) in order to evaluate the remaining prospectivity on the Western Leases including the Nanushuk Fairway potential. Winx-1 will now be plugged and abandoned.

 

88 Energy Ltd's Managing Director, Dave Wall, commented: "The early encouragement seen at Winx has not been confirmed by the results from the wireline logging program, despite many of the hallmarks of a successful Nanushuk play being present. Analysis of the data is ongoing; however, it is deemed unlikely to change the current view in a material fashion.

We appreciate that this is disappointing for investors but, at the same time, we look to the future and continue our forward path to ultimate success at our projects in Alaska.

 

An update will be provided on the broader Alaska project portfolio in the near term."

 

Media and Investor Relations:

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

Email: admin@88energy.com 

 

Finlay Thomson, Investor Relations Tel: +44 797 624 8471

 

Hartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities

Neil McDonald/Derrick Lee Tel: +44 131 220 6939

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDDXGDXBXBBGCD
Date   Source Headline
26th May 20267:00 amRNSAGM Results
20th May 20267:00 amRNSSouth Prudhoe Augusta-1 Exploration Well Update
18th May 20267:00 amRNSSouth Prudhoe Prospective Resource Upgrade
11th May 20267:00 amRNSAmended PEL93 Farm-In Terms and Exploration Update
7th May 20267:00 amRNSRig Secured for Augusta-1 Exploration Well
27th Apr 20267:00 amRNSProject Phoenix - PA Amendment
24th Apr 20267:00 amRNSNotice of Annual General Meeting
16th Apr 20267:00 amRNSQuarterly Report and Appendix 5B
7th Apr 20267:00 amRNSKad River 3D Survey Secured
30th Mar 20267:00 amRNSAugusta-1 Exploration Well Planning Underway
27th Mar 20267:00 amRNSSuccessful Placement to Raise A$5 Million
25th Mar 20267:37 amRNSProposed placing to raise up to A$5.03 million
23rd Mar 20267:27 amRNSLodgement of Annual Report
10th Mar 20267:00 amRNSCompletion of Small Holding Share Sale Facility
9th Mar 20267:09 amRNSCorporate Presentation
19th Feb 20267:01 amRNSNAPE Presentation
19th Feb 20267:00 amRNSSouth Prudhoe Prospective Resource Update
9th Feb 20269:30 amRNSPEL 93 Update
30th Jan 20267:00 amRNSQuarterly Report and Appendix 5B
27th Jan 20267:00 amRNSSchrader Bluff 3D Seismic Survey Secured
5th Jan 20262:42 pmRNSDirector Dealings
27th Nov 20257:00 amRNSCorporate Presentation
26th Nov 20257:00 amRNSProject Phoenix - 2026 Production Test Program
20th Nov 20257:00 amRNSNew North Slope Acreage Secured
30th Oct 20257:02 amRNSQuarterly Report and Appendix 5B
26th Aug 20257:00 amRNS2025 Half-year Report
22nd Aug 20257:00 amRNSDirectorate Change
18th Aug 20257:00 amRNSSale of Non-Core Permian Basin Interest
1st Aug 20257:53 amRNSSmall Holding Share Sale Facility Update
22nd Jul 20257:00 amRNSQuarterly Report and Appendix 5B
2nd Jul 20257:00 amRNSLicence Extension & New Program Launched at PEL 93
18th Jun 20258:16 amRNSSmall Holding Share Sale Facility Letter
16th Jun 20259:29 amRNSSmall Holding Share Sale Facility
13th May 20257:30 amRNSRestoration - 88 Energy Limited
12th May 20252:39 pmRNSCompletion of Consolidation of Capital
12th May 20257:30 amRNSSuspension - 88 Energy Limited
8th May 20254:42 pmRNSTemporary Suspension of Trading
6th May 20258:20 amRNSResult of AGM
17th Apr 20257:09 amRNSQuarterly Report and Appendix 5B
4th Apr 20257:00 amRNSNotice of AGM and Proposed Capital Consolidation
31st Mar 20257:00 amRNSReceipt of Outstanding Project Phoenix Funds
12th Mar 20257:00 amRNSNotice of AGM and Director Nomination
11th Mar 20259:21 amRNSLodgement of Annual Report
18th Feb 20257:00 amRNSCorporate Presentation
17th Feb 20257:00 amRNSFarm-out for Project Phoenix Horizontal Test Well
30th Jan 20257:00 amRNSMaiden Prospective Resource for Canning Prospect
21st Jan 20257:00 amRNSQuarterly Report and Appendix 5B
31st Dec 20247:19 amRNSProject Phoenix Update
12th Dec 20247:36 amRNSHighly Prospective New Leases in Alaska
10th Dec 20247:00 amRNSInitial Interpretation of PEL 93 2D Seismic

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.