Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.16
Bid: 0.155
Ask: 0.165
Change: 0.00 (0.00%)
Spread: 0.01 (6.452%)
Open: 0.16
High: 0.16
Low: 0.16
Prev. Close: 0.16
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update - Winx-1 Final Report

13 Mar 2019 07:00

RNS Number : 6726S
88 Energy Limited
13 March 2019
 

13th March 2019

 

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION AS DEFINED IN ARTICLE 7 OF THE MARKET ABUSE REGULATION NO. 596/2014 ("MAR"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

 

 

88 Energy Limited

 

Operations Update - Winx-1 Final Report

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) advises the following in relation to its oil and gas operations on the North Slope of Alaska.

 

Highlights: Winx-1

 

· Comprehensive wireline logging program successfully completed at Winx-1, full petrophysical analysis and review commenced

· Provisional petrophysical analysis of the wireline logging program indicates low oil saturations in the primary Nanushuk Topset objectives; testing and fluid sampling indicates that reservoir quality and fluid mobility at this location is insufficient to warrant production testing, despite encouragement from oil shows and logging while drilling (LWD) data

· Zones of interest in the Torok formation, secondary objectives, were identified on wireline logs, which similarly exhibited low oil saturations and did not flow hydrocarbons during the Modular Formation Dynamics Test (MDT) pressure testing and fluid sampling program

 

Western Leases - Winx-1 Exploration Well

Petrophysical interpretation of the LWD data at Winx-1 indicated elevated resistivities associated with increased mud gas ratios (C1 - C5) in the distinctive Nanushuk Topset sequence comparable with other successful neighbouring wells in the Nanushuk play fairway. Early indications were encouraging and, on this basis, a comprehensive wireline program was undertaken to further evaluate the interval of interest.

 

The wireline program was designed to fully evaluate and quantify the reservoir potential and associated shows in the Nanushuk Topsets. The suite comprised specialist logging tools capable of quantifying laminated pay zones, including nuclear magnetic resonance; a triaxial induction tool that measures both horizontal and vertical resistivity, FMI (formation micro imager) and an MDT program to determine pressure gradients and sample fluids from the zones of interest.

 

Provisional wireline results indicate low oil saturations in the Nanushuk Topsets not conducive to successfully flowing the formation, as borne out by the MDT sampling results, which did not retrieve hydrocarbon samples. Reservoir properties appear to be compromised by dispersed clay in the matrix at Winx-1. This clay is often present in other successful Nanushuk wells but in discrete laminations with decent quality, high resistivity, oil saturated sandstones in between. The dispersed clay in the Nanushuk at Winx impacts both fluid mobility and oil saturations. The clay serves to bind much of the fluid present in place so it cannot flow. It also occupies pore space within the formation, resulting in a lower relative hydrocarbon saturation. This means that, whilst oil is present in the reservoir, there is less of it and it is not mobile. Further evaluation will be undertaken post drill to fully understand the implications of the petrophysical results.

 

The reservoir performance in the Torok Channel Sequence was better than the Nanushuk in the Winx-1 well as evidenced by relatively faster influx of fluid during MDT sampling. On completion of the wireline logging program it is apparent that the oil saturations in the zone of interest are also low and not conducive to hydrocarbon flow. While the oil saturations are evidence of an active petroleum system and charge, further work is required to determine whether there is an effective trapping mechanism at this location.

 

The forward plan is to further evaluate and integrate the valuable data acquired at Winx-1 and reprocess the Nanuq 3D seismic (2004) in order to evaluate the remaining prospectivity on the Western Leases including the Nanushuk Fairway potential. Winx-1 will now be plugged and abandoned.

 

88 Energy Ltd's Managing Director, Dave Wall, commented: "The early encouragement seen at Winx has not been confirmed by the results from the wireline logging program, despite many of the hallmarks of a successful Nanushuk play being present. Analysis of the data is ongoing; however, it is deemed unlikely to change the current view in a material fashion.

We appreciate that this is disappointing for investors but, at the same time, we look to the future and continue our forward path to ultimate success at our projects in Alaska.

 

An update will be provided on the broader Alaska project portfolio in the near term."

 

Media and Investor Relations:

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

Email: admin@88energy.com 

 

Finlay Thomson, Investor Relations Tel: +44 797 624 8471

 

Hartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities

Neil McDonald/Derrick Lee Tel: +44 131 220 6939

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDDXGDXBXBBGCD
Date   Source Headline
13th Jul 202211:00 amRNSPrice Monitoring Extension
13th Jul 20229:05 amRNSSecond Price Monitoring Extn
13th Jul 20229:00 amRNSPrice Monitoring Extension
12th Jul 20224:40 pmRNSSecond Price Monitoring Extn
12th Jul 20224:36 pmRNSPrice Monitoring Extension
12th Jul 202211:06 amRNSSecond Price Monitoring Extn
12th Jul 202211:00 amRNSPrice Monitoring Extension
5th Jul 20222:01 pmRNSPrice Monitoring Extension
27th Jun 20227:00 amRNSProjects Update: Icewine East & Longhorn
16th May 20227:59 amRNSAGM Results
16th May 20227:00 amRNSAGM Presentation
9th May 20222:40 pmRNSProject Icewine – Independent Third-Party Mapping
14th Apr 20227:00 amRNSNotice of AGM
14th Apr 20227:00 amRNSQuarterly Report and Appendix 5B
12th Apr 20227:00 amRNSProject Longhorn-Texas Oil & Gas Production Update
8th Apr 20227:00 amRNSProject Icewine - Preliminary Mapping Complete
30th Mar 20229:05 amRNSSecond Price Monitoring Extn
30th Mar 20229:00 amRNSPrice Monitoring Extension
29th Mar 20222:05 pmRNSSecond Price Monitoring Extn
29th Mar 20222:00 pmRNSPrice Monitoring Extension
29th Mar 202211:21 amRNSWireline Logging Results at Merlin-2
23rd Mar 20227:00 amRNSMerlin-2 Well Reaches Total Depth
22nd Mar 20227:29 amRNSAnnual Report Shareholder Disclosures
18th Mar 20227:00 amRNSASX LODGEMENT OF ANNUAL REPORT
17th Mar 20227:00 amRNSMerlin-2 Drilling Ahead
8th Mar 20222:21 pmRNSMerlin-2 Well Spudded
4th Mar 20227:00 amRNSProject Icewine Update
1st Mar 20227:00 amRNSMerlin-2 Pre-Spud Operations On Track
25th Feb 202211:05 amRNSSecond Price Monitoring Extn
25th Feb 202211:00 amRNSPrice Monitoring Extension
22nd Feb 20227:00 amRNSIssue of Equity
21st Feb 20227:00 amRNSAcquisition of Texas Oil and Gas Production Assets
14th Feb 20227:00 amRNSCorporate Presentation
14th Feb 20227:00 amRNSPlacement to raise A$32M
10th Feb 20229:05 amRNSSecond Price Monitoring Extn
10th Feb 20229:00 amRNSPrice Monitoring Extension
10th Feb 20228:01 amRNSProposed placing to raise up to A$30.0 million
10th Feb 20227:00 amRNSMerlin-2 Permit to Drill Approved
26th Jan 20224:41 pmRNSSecond Price Monitoring Extn
26th Jan 20224:36 pmRNSPrice Monitoring Extension
26th Jan 20222:05 pmRNSSecond Price Monitoring Extn
26th Jan 20222:00 pmRNSPrice Monitoring Extension
26th Jan 202211:06 amRNSSecond Price Monitoring Extn
26th Jan 202211:01 amRNSPrice Monitoring Extension
24th Jan 20224:41 pmRNSSecond Price Monitoring Extn
24th Jan 20224:36 pmRNSPrice Monitoring Extension
24th Jan 20222:06 pmRNSSecond Price Monitoring Extn
24th Jan 20222:00 pmRNSPrice Monitoring Extension
21st Jan 20227:00 amRNS88 Energy Commences Trading on the US OTCQB
20th Jan 20229:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.