Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.30    -0.025 (-1.89%)
Bid:
1.25
Ask:
1.35
Spread: 0.10 (8.00%)
Market Cap: £17.30m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Operations Update

31 Mar 2021 07:52

RNS Number : 0951U
88 Energy Limited
31 March 2021
 

31st March 2021

 

This announcement contains inside information

 

88 Energy Limited

 

Operations Update

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM:88E, OTC:EEENF) is pleased to provide the following update related to its operations in the NPR-A region of the North Slope of Alaska.

 

Highlights

· Umiat Oil Field acquisition conditions satisfied

· Wireline logging continues at Merlin-1

 

Details

The final condition related to the acquisition of the Umiat Oil Field ("Umiat") is now complete with cement work associated with plugging and abandoning of two historical wells at the field now executed. Remedial site work will be finalised in the near term.

 

Umiat is an historic oil discovery, made in 1945 in shallow Brookian (Nanushuk) sandstones, located immediately adjacent to the southern boundary of Project Peregrine.

The field is covered by two leases comprising 17,633 acres, which are in a unit that was formed in September 2019 with an initial 10 year term. The current conditions of the unit stipulate a well commitment (exploration or appraisal) by 31st August 2022.

 

Umiat was discovered in the mid-1940s with 11 appraisal wells drilled by 1953, several of which were tested. Umiat-5 flowed 268 barrels per day on a 3 month test and Umiat-8 had a peak flow rate of 5.9mmcf/d of natural gas during a 4 day test. Little work was done until 2013/2014 when Linc Energy drilled two wells, Umiat-18 and Umiat-23H. Umiat-23H was tested with a maximum flow rate of 800 barrels per day and sustained flow of 200 barrels per day. Refer to ASX announcement dated 11 January 2021 for further details.

 

Wireline logging operations at the Merlin-1 well at Project Peregrine are underway, with preliminary results expected over the weekend.

 

Managing Director, Dave Wall, commented: "The acquisition of the proven oil field at Umiat is a significant milestone for the Company and its shareholders, particularly in the context of any discovery made at Project Peregrine, where wireline logging is currently underway."

 

About Project Peregrine - Logging Underway

Project Peregrine is located in the NPR-A region of the North Slope of Alaska and encompasses ~195,000 contiguous acres. It is situated on trend to recent discoveries in a newly successful play type in topset sands in the Nanushuk formation. 88 Energy has a 100% working interest in the project that will reduce to 50% post the completion of funding as part of a recent farm-in, whereby 88E is carried on the first US$10m (of an initially estimated US$12.6m total cost) for the Merlin-1 well.

 

The Merlin-1 well is spud in March 2021 and is targeting 645 million barrels of gross mean prospective resource#. A second well, Harrier-1, is planned to be drilled in 2022 and is targeting gross mean prospective resource of 417 million barrels#.

 

Independent Resource Assessment#

 

Project Peregrine: Alaska North Slope

Unrisked Net Entitlement to 88E Prospective Oil Resources (MMstb)

Prospects (Probabilistic Calculations)

Low (1U)

Best (2U)

High (3U)

Mean

COS

Merlin (Nanushuk)

41

270

1,463

645

37%

Harrier (Nanushuk)

48

207

940

417

24%

Harrier Deep (Torok)

42

267

1,336

574

20%

Prospects Total

1,636

 

#Please refer to release dated 23 February 2021 for full details with respect to the Prospective Resource estimate, associated risking and applicable Cautionary Statement.

 

Each of the Merlin and Harrier prospects is located on trend to an existing discovery, in the same play type (Nanushuk topsets). This has de-risked the prospects considerably and resulted in a relatively high independently estimated geologic chance of success.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

 

The below graphics can be found in the pdf version of this announcement available from the Company's website;

· Figure 1: Umiat Oil Field Location

· Figure 2: Project Peregrine and Recent Nanushuk Discoveries

· Figure 3Merlin-1 - on trend to large Willow oil field

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

Email: admin@88energy.com 

 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

EurozHartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities Tel: + 44 131 220 6939

Neil McDonald / Derrick Lee

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFIFERVIILVIL
Date   Source Headline
31st Oct 20247:00 amRNSSeismic Processing Complete PEL 93
29th Oct 20247:19 amRNSQuarterly Report and Appendix 5B
10th Oct 20248:00 amRNSProject Phoenix Presentation
18th Sep 20247:00 amRNSContingent Resource Update for Project Phoenix
2nd Sep 20247:00 amRNS2024 Half Year Report
19th Aug 20247:00 amRNSProject Phoenix Update
31st Jul 202411:48 amRNSExercise of Performance Rights and Issue of Equity
26th Jul 20247:00 amRNSQuarterly Report and Appendix 5B
24th Jul 20247:00 amRNS2D Seismic Acquisition Completed for PEL 93
8th Jul 20247:00 amRNSCommencement of 2D Seismic Acquisition for PEL 93
4th Jun 20247:00 amRNSProject Leonis: Prospective Resource Estimate
22nd May 20241:59 pmRNSIssue of Performance Rights
13th May 20247:27 amRNSResult of AGM
10th May 20247:00 amRNS2D Seismic Contract Awarded for Namibian PEL 93
24th Apr 20247:00 amRNSSuccessful Placement To Raise A$9.9M
23rd Apr 20247:08 amRNSProposed placing to raise up to A$9.8 million
19th Apr 20247:00 amRNSFurther Information on Hickory-1 Flow Test Results
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.