RE: see if the farce ends next week14 Jun 2019 14:36
Alan,
Thanks for pointing the not to scale detail out, however scaled is also roughly approximate. There are 11 triangles there representing perforations over 195m. The plug is set at the bottom 3, this gives you roughly 50m and this more or less agrees with a previous post of yours where you was expecting the plug to be set at the bottom of the well. If I recall correctly, you said they could not log that part.
On the test equipment question, I don’t understand why you could not give a brief answer rather than refer me to a previous post. Anyway, I reread your post dated 4th June titled “Positive RNS”, I think this is the one you referred me to.
In this post your view, as I understand it, is that they need the well test equipment installed before they can begin the “preparatory work” which involves cleaning the well.
If I understood your post correctly, then simply put, without the test equipment installed they will not be able to do the preparatory works and proceed to Stage 2.
Up to now equipment has not been seen going to site. A post by FOTH claimed that there is nothing happening at site. Therefore, they have not as yet moved any equipment to site to enable them to start the preparatory works.
Looks like equipment will be moving to site next week. Have you any idea, upon arrival of equipment to site, how long it will take them to install the equipment and complete the preparatory works?