RE: Large supply vessels around the rig?27 Oct 2022 22:48
Think they mix the cement onboard with fixed equipment on the rig. They always planned to plug / cap the well below the seabed so all that equipment would already be on the boat, now the sidetrack packers and casing etc may have been stored on the beach.
So I would not read too much into boat operation around the Rig, however the runs to the beach could mean something.
Anyway it certainly going to be communicated soon hey.