1:18 27/12/2017 Shaikan pipeline link in two months.
DANA @rezgawr Follow Follow @rezgawr More DANA Retweeted Baxtiyar Goran This is gulf keystone petroleum in sheikhan block which Will be connecting to the atrush oil exporting system. Baxtiyar GoranVerified account @BaxtiyarGoran Follow Follow @BaxtiyarGoran New pipeline connecting Atrush oil field to Sheikhan field then link it to the main Kurdistan-Turkey pipeline. Expected to be operational within next two months.