RE: On Monday...5 Apr 2019 22:32
Redbus I think the market will want to see at least 800 BOPD conformed based on those openly disclosed prior to shut in. With well 38 awaiting sidetracking I would like to think a proportion of the material upside of a 5 well programme based on analogous geology/proximity would be priced in. £40-45m mcap would seem realistic to me and achievable if results exceed 800BOPD, especially with well 38 getting underway almost immediately. If we exceed 1100 BOPD then 60-75m Mcap near term post well 38 validation.