RE: 150 day EWT ends 23/11/1815 Nov 2018 16:51
im not saying that I don't agree but what I am trying to get is hard facts of what is agreed
you read the link that you gave and it says nothing about facts but only about what is planned after phase 1 (210 days)
now those 210 days were actually accepted as 150 Days...yes
See another extract from your link the EGA did grant phase 1 but only 150 days.
1. Planning Permission was granted by Surrey County Council (SCC) in November 2017 for:
The retention of the existing exploratory well site and vehicular access onto Horse Hill;
The appraisal and further flow testing of the existing borehole, Horse Hill-1 (HH-1) for hydrocarbons, including the drilling of a (deviated) sidetrack well and flow testing for hydrocarbons;
Installation of a second well cellar and drilling of a second (deviated) borehole, Horse Hill-2 (HH-2) and flow testing for hydrocarbons;
Site preparation including erection of security fencing on an extended site area, modifications to the internal access track, installation of plant, cabins and equipment, all on some 2.08ha, for a temporary period of three years, with subsequent restoration to agriculture and woodland.
The Environment Agency (EA) has granted the necessary permits to enable HHDL to carry out extended flow tests at HH-1, store any produced oil, drill and test both a sidetrack from the existing HH-1 well and new borehole HH-2.