RNS27 Nov 2019 13:06
A5
looking good
The drilling phase has been completed without incident and Baker Hughes has been contracted to undertake the cementing work.
The side-track, which commenced from a depth of 3,976 meters has reached a Total Depth (TD) of 4,404 meters. Abundant hydrocarbon shows were observed while drilling consistent with the shows observed in the previous side-track which had a successful short term flow test. Wireline logging has just been completed and evaluation of reservoir properties and fluids is ongoing. Pressure in the well remains high and stable.