RE: Yeah it only goes down Scandic2 Aug 2018 13:38
also read the RNS's
"Forward EWT Plans
The well will now be shut in for a planned 24-hour pressure build-up test. Operations will then include further flow parameter optimisation, followed by the first of three planned flow sequences designed to assess whether the Portland oil pool contains a commercially viable volume of oil. The first test sequence will likely include an optimised maximum rate test, prior to choking back the well to provide the steady state flow conditions necessary to determine the Portland oil pool's connected oil volume. Note that in order to collect the required data during these steady state flow periods, rates will likely be below any future optimised production rates." Hence reduced number of tanker to that required for normal operation.