Meanwhile over on Twitter....26 Jul 2018 21:07
there is a conversation where there is a screen shot of EDM's power project pipeline I assume from the EDM 10 Year Strategy paper.
Within the table, there is a project identified as Tete, a coal project at 300MW, with a $300m investment. Construction start date 2019 and construction end date 2023.
This will not come as any surprise to the researched on this BB. The timings match ours perfectly and we are the only one in the Tete area...
However, if you take time to look further down the table, what pops up.......?
Only another project identified as Tete, and surprise suprise, its a coal project at 300MW, with a $300m investment. Construction start date 2023 and construction end date 2026 i.e. starts as soon as the first one finishes.
I suspect if the table continued after 2026, several other coal projects in Tete, at 300MW, with the same investment and a 3 year construction period would pop up to the tune of a total of, oh, lets say........1800MW.
Now, who on earth could be involved in that?
This is ON, doubly ON, trebly ON, quadruply ON, quintupley ON and sextupley ON!