INDEPENDENT VERIFICATION OF TEST RESULTS3 Apr 2021 16:50
The test results by CLJ Ltd states this about both upper and lower zones at Cascadura-1ST1
Final 24-hour extended flow test rate, limited by capacity of surface test equipment, averaged 5,472 barrels of oil equivalent per day ("boe/d"), 86% natural gas, at a final sandface drawdown of 4%. Pressure data suggests that the well was still cleaning up at the end of the extended test period.
Does this mean the well has the capacity to produce more due to the statement above. And also this is the same test equipment that's going to test the deep so how do they test the deep when it couldn't cope with whats above.
Am I missing something here all.