Txp14 Dec 2021 19:52
6184/2021 2021-02-23 Primera Oil and Gas Limited 25, 26(a), 27 the drilling, completion and extended testing of four (4) oil and gas development wells from CASCADURA-B site and the construction of a buried 10-20 inch Natural Gas pipeline FROM CASCADURA-B to the main facility at CASCADURA-1ST1 wellsite within the Ortoire Blocks
Application Withdrawn 10-May-2021.
So the pipeline between the 2 sites can hold up to 200 MMcf/d and probably the same size to the 3rd drilling pad . That's 8 wells of these 2 pads and if they are as good as the first 2 wells and remember we haven't even reached the bottom then will the pipeline be big enough to carry that volume of gas.
As Cascadura is evolving do we have a big enough pipeline was what I was thinking.
Off pad B remember we are going deeper to find the bottom and if that's as good as the second drill at Cascadura that's a sh.. load more gas coming out the ground so you would think the others would do the same.
I asked a question a few months ago and MJ said that up to 4 wells off a pad can be done and if memory serves me right he said its better to do the 4 wells and then bring them online as it's safer than bringing them on line individually as one is online or stopped while you drill the next, but please pull me up if I have the wrong MJ
It's just my opinion as always .
I just think Cascadura is going to be bigger than we all think.