RE: Momentum building14 Nov 2025 09:29
· 68 samples sent for chemical analysis on 2nd October to SGS Geosol with grade results anticipated to be ready in 30 days.
· Visible sulphides are present in multiple samples.
· 14 grab samples collected from TP3.2 area, a high-grade shallow target zone, which will be sent to the lab with additional samples from the remaining trenches as part of the QAQC verification programme.
The above taken from the RNS 9th October.
Results obviously landing any day.