Ben Richardson, CEO at SulNOx, confident they can cost-effectively decarbonise commercial shipping. Watch the video here.
Proposed Joint Venture with Hydrogen Utopia International Plc for a non-recyclable Waste Plastic to Hydrogen facility in the Republic of Ireland.
RNS from PHE & HUI
Shorters will only have themselves to blame. Nobody else.
The De Nora IPO is scheduled for June so will be interesting to see what comes out from AFC. Let's hope for a positive week. GLAGH.
Keltbray to Lease Hybrid Fuel Cell System for London Construction Site
RNS Results Out
For those who have been following the hydrogen economy for a while it all seems a bit bizarre why it has taken so long for the penny to start to drop. Even last week on the main news the options were quoted as wind, solar and nuclear. We all know it is coming but the doubters seem to have their heads in the sand.
I have contacted the company
https://fuelcellsworks.com/news/u-k-proposed-industrial-hydrogen-accelerator-programme/
Apologies if already posted. Applicable to PHE & HUI? Do you have a route in Dr A? I can email PHE direct if required.
my post was around formal notification of correspondence dated 2 March - nothing more
I have had a look and they contain for example
Expiry 3 years
iaw plans
iaw drainage scheme
iaw flood risk assessment
iaw contruction management traffic plan
iaw agreed hgv movements
iaw emergency access
iaw protection of trees amd landscaping
iaw noise
iaw construction times
iaw air quality
iaw contamination found during construction
iaw lighting
iaw environment reqs
there is a note about no construction during nesting season but if vegetation works required permission to be requested
have timed out for now but I believe none of this is new.
I believe the conditions are just formalising everything which has gone before such as noise and hgv movements etc. but happy to be corrected. link within https://pa.cheshirewestandchester.gov.uk/..... I havent pasted the link to the conditions in case I am not supposed to copy and paste it / dont have the permission.
Dated 2 March 2022 - Notice of Planning Permission (Section 73)
Proposal: Variation of Condition 2 (Approved Drawings) 8 (Permitted number of daily HGV
movements), 9 (Access road, emergency exit and internal road layout) and Condition 10 (Emergency
Access) of 19/03489/FUL (Hydrogen production facility and electricity generating plant)
Location: Area 10B, Ince Resource Recovery Park, Marsh Lane, Ince,
In pursuance of their powers under the above Acts, the Council hereby grants PERMISSION for the
above development to be carried out, subject to compliance with the following conditions:
Rns out
I think having both Extreme E and Extreme H is great given that there is more than enough room for EV and FCEV in the market. Imho
https://denora.com/insights.html
2022Il Consiglio di Amministrazione del Gruppo De Nora approva l’avvio dell’iter di quotazione in Borsa
2022 The Board of Directors of the De Nora Group approves the start of the listing process on the Stock Exchange
https://www.abb-conversations.com/2022/02/three-ways-to-future-proof-your-data-center/
Fuel Cells get a mention.
I am seeing this as positive also and think HUI have made the right move. They have advised immediately and I note that the relationship with PHE seems to be in a good place given that the RNS came from PHE. GLAH
Hydrogen One invests £10M in Bramble Energy RNS today.
When Does Planning Permission Expire? Normally, planning permission is valid for three years from the time the local planning authority grants it. There are exceptions, but they are rare and, if your case is one of them, it should say so clearly in your letter of approval.