From 9th October RNS24 Nov 2025 14:39
The programme aims to expand the current resource from 210,000 to ~350,000 oz Au under the JORC code, and fast-track a PEA for a high-grade, open pit mine producing ~20,000 oz Au/year. The priority is the high-grade TP2 - c.106,600 oz @ 16.65 g/t Au and TP3.2 (within TP3) - c.34,600 oz @ 1.35 g/t Au zones, two of the six identified targets along the 8km mineralised corridor which has 15+ high-grade gold occurrences and historical sampling up to 135 g/t Au.