C377 Jan 2019 10:52
What we are aiming to do...
the identified structure measures approximately 3 square kilometres with a significant degree of closure indicated by a thickness of approximately 100 metres.
· The study recommends that well C-37's total depth, 3,987 metres, be deepened by approximately 200-250 metres with the following two objectives:
1.) Penetrate sandstone layers found in the adjacent well C-22 where historical well data indicates that initial production was approximately 700 barrels per day from the Middle Eocene formation upon drilling in 1986.
2.) Penetrate the Mesozoic (Upper Cretaceous) formation, which has not been previously tested in this structure to verify its fluid content. The new Cretaceous play could potentially unlock valuable new prospective exploration activity to be performed in the Muradkhanli and Zardab fields.
strategy..
The Company's operational team plans to divide drilling activities in two phases. Initially, well C-37's total depth, 3,987 metres, will be deepened by 15-20 metres into the Middle Eocene formation and a production test will be performed. The Company's geological and reservoir investigations have indicated that the Middle Eocene formation in this well may hold significant oil reserves. This has been supported by the fact that an adjacent well, C-22, achieved a sizeable rate of production from the interval between 3,902-4,014 metres.
In the event of negative results from the first Middle Eocene target zone, Zenith will proceed with deepening the well by 200-250 metres to test the Upper Cretaceous formation.
tender...
The Company will provide an update once the preparatory work is concluded and a 180-ton rig, contracted from a local service company, is mobilised to the well location in order to commence drilling activities.