'Other exploration and development interests :
• Beetaloo Basin – multi-decade opportunity'
-
'In the Beetaloo Basin, we have a 70% interest in exploration permits over 18,500km2 and in late 2018 commenced Stage 2 of a farm-in work program targeting two independent potentially liquids rich shale gas plays. Over FY2020, we plan to drill and fracture stimulate two horizontal wells and then undertake extended flow testing of both liquids and gas.'
-
'Corporate
FY2020 corporate costs are estimated to be $70–$80 million.
Capital expenditure (including investments) is estimated to be $530–$580 million including $110–$120 million exploration and appraisal spend, primarily relating to Beetaloo Stage 2 appraisal and preparation for Stage 3.'
-
'• Exploration and appraisal spend ($18 million) primarily related to Beetaloo.'
-
Operations
Beetaloo (Northern Territory)
Origin has a 70% interest in exploration permits over 18,500 km2 in the Beetaloo Basin. In February 2017, a 2C contingent resource of 6.6TCF1 (100%) relating to the Velkerri B shale dry gas play was booked following a production test of the Amungee NW-1H well.
Interpretation of data obtained from the Amungee well, and other wells drilled in the Beetaloo Basin indicates a promising exploration opportunity with four stacked, unconventional hydrocarbon plays. Stage 2 appraisal is underway, targeting the Kyalla and Velkerri shale liquids rich gas plays. Two horizontal appraisal wells are planned to be drilled, fracture stimulated and put on extended production testing during FY2020. A number of preparatory activities were completed during the year including sacred site clearances, other access negotiations, water bore drilling to obtain baseline data, well pad and access road preparation, environmental approvals, and securing all services required for the campaign including the Ensign 963 rig. Current well status:
• Kyalla – drilling and stimulation, water bore and civils Environment Management Plans have been approved and water extraction licence is in place. Water bores have been drilled and access road and well pad construction are nearing completion.
• Velkerri – water bore and access roads Environmental Management Plans have been approved and water extraction licence is in place. Awaiting well pad civils and drilling and stimulation approvals. Survey work is being completed and water bores are being drilled.
The objective of the Stage 2 campaign is to test the ability to flow liquids-rich gas from the two independent liquids-rich gas plays.'