Licence commitment well also 3rd Lanc producer?27 Apr 2020 01:18
Looking at the RNS for the 7 vertical pilot well on 9sept2016 - it saying:-
"DST testing of the basement reservoir yielded a maximum, natural flow rate of 6,600 bopd and a maximum flow rate of 11,000 bopd (artificial lift with an electrical submersible pump) of good quality 38 API oil with no formation water produced."
If from a vert well one can get such good flow rates near the FPSO, why would you not 'kill 2 birds with 1 stone' and drill the commitment well, to please the OGA and find the measured depth of the oil water contact, as they require - but drill it close to the FPSO so it can then be hooked up as a producer. If there is the gas flare problem for production amounts above 20k bopd then at least HUR would have a 3rd well option to select and could use it rather than the 7Z well with its current water cut - that's assuming the new well had a lesser water cut, of course. Whatever, it would give the security of having a 3rd well in hand should, at any time, the need arise. They after all do say that testing has shown that the oil is coming from the first few meters of the horizontal wells so why drill a 1 km horizontal .
So, what's the snag, I've not spotted, with this idea?