ACP - Armadale Capital PLC4 Oct 2023 11:47
Still watching from the sideline.
It's still falling.
Tro - tough ti call the bottom on this one?
Are they close to getting the funding they need?
> Feasibility study details..
US$882m pre-tax cashflow generated from initial 17 year mine life utilises just 25% of the resource, which remains open in multiple directions offering significant further upside;
· Estimated pre-tax NPV of US$358m and IRR of 91% with scope for further positive improvement upon economics in near-term through delivery of optimised DFS
· Staged ramp-up planned to facilitate near term production with 60,000tpa graphite concentrate to be produced for the first four years (Stage 1) before increasing to 90,000tpa (Stage 2)
· Capital cost estimate for Stage 1 is US$38.6m, which includes a contingency of U$S4.1m or 15% of total direct capital cost, a slight increase on the scoping study allowing for the staged ramp up
· 1.6 year payback for Stage 1 (after tax) based on an average sales price of US$1,179/t
· Stage 2 expansion is expected to be funded from cashflow.