RE: RE;Re-SP14 Aug 2020 18:06
Trollhunter,
So has it really been a successful strategy so far believing those RNS that are so 'positive' (but please don't read the caveats). Is Turkey next for the over-hyped, under delivery treatment, or Loxley, or IOW - enabling those ramping posts?
HH-2z:-
'building confidence that the previously reported 720-1,080 bopd horizontal well production targets are increasingly attainable'
'Storage tank upgrade now installed and hooked-up with 2,000+ barrels total capacity for imminent HH-2z flow testing'
'routine intervention'
'this is an excellent result for the Company as it has enabled HH-2z to flow dry oil to surface at encouraging initial rates'
BB-1/1z
'provides further "proof of concept" that the Kimmeridge of the central Weald may contain an extensive, thick, continuous oil deposit'
'...completion of the well as a potential oil-producer...designed to provide significant future cost and potential test performance benefits'
'Broadford Bridge-1z ("BB-1z") sidetrack completed as a potential oil producer'
'Broadford Bridge Oil Pouring Part One'
'This £10 MM funding, the largest in the Company's short history, ensures that our stated drilling and testing programme, spanning four wells over the next 12 months, is fully funded'
HH-1 Kimmeridge:-
'Impact of Kimmeridge Limestone Oil on UK Economy'
'Future peak oil production could provide approximately 4% to 27% of 2014 UK daily oil demand over the life of the project
The Gross Value Added to the UK economy could range from £7.1 billion to £52.6 billion
Generation of between approximately 1,000 to 5,600 jobs in the UK, averaged over the project's lifetime
Lifetime tax revenues of between £2.1 billion to £18.1 billion'
'this "Weald hybrid play" has the potential for significant daily oil production.'
'we should not lose sight of the significance of the potential prize that lies in the underlying primary Kimmeridge objective'
HH-1 Portland 2016:-
'Final Portland Flow Test........A larger 26-ft stroke pump was installed resulting in a maximum rate in excess of 360 bopd and an average stable rate of 323 bopd over 8.5 hours. This flow rate was still limited by pump capacity'
'The Portland also has greater flow potential as rates were limited by the test pump's maximum capacity'
2020:- 'The Horse Hill-1 well (HH-1) continued producing at high rates of over 300 bopd almost continuously during the period. Post period a higher capacity and energy efficient linear rod pump was installed on HH-1, leading to increased production from the Portland interval.'
Only if someone has traded and sold on spikes will you have made money since 2017 - nothing wrong with that unless they throw all morality out of the window and claim to be buying, averaging down, and holding for whatever crazy price they are currently posting is going to happen 'within weeks' whilst selling and denigrating anyone who disagrees - and then come on here gloating and goading.