RE: another prospect3 Oct 2020 10:11
Ocelot,
But UKOG and SS in his cosy chats were responsible for not identifying the risks and raising expectations. If anyone pointed out the caveats in the small print it was met on this board with 'they have to put that' as if it didn't apply - but never that the caveats are there because the risks are real.
Continued use of the combined highest flow rates in the 2016 ewt in RNS, pouring oil and installing a production completion in BB before even testing (!), 'routine intervention before HH-2z water shut off, but after it was 'successful' 'However, success, particularly in horizontal wellbores and where water ingress is via open natural fractures, is by no means guaranteed'. Very apt.
UKOG have to deal with the geology they have, but they have a huge amount of data, yet seem to only put out the positive stuff until it is no longer viable to conceal bad news, and only proceed on the basis of the most positive outcome with no plan B. Continually cash raising to buy up the Weald before it was proven, massive step out to BB when HH could have been fully tested. There was no need for the haste, if the Weald was viable everywhere (as Nutech sort of promised if you didn't read the small print) there were plenty of clapped out fields that could have been rejuvenated with Kimmeridge prroduction.
I'm afraid it shows SS's big company background, unable to nurture a small company's assets but spend, fail and move on.