RE: Very HOT share3 Jun 2022 23:43
Adrian,
'As most sane rational people know UKOG have been held back by planning red tape and nimby councilors. Horsehill, Dunsfold and others.'
Hmmm - sane rational, but that wasn't what you tweeted (or posted under a different name here) when you weren't invested:-
'TheFoolonTheHill@davethedrill1
Feb 7
Replying to @JCranam
#UKOG Then there's the other problem John. SS. Then how many months years after the EA permit is out for #Horsehill will Sanderson take to mobilise reinjector equipment to HH. He is never in a hurry. He still gets paid.Ill wait to see equipment arriving.'
Don't know about looooo etc. though,
IGas have a structure map that clearly shows a saddle between Godley Bridge and where Loxley is planned to be drilled that's at a similar depth to the Portland as the dry GB-2 and GB-2z - are they showing a map in the CPR they don't believe in?
The map in the Star Energy application for the acreage looks like the map in the CPR and covers the UKOG acreage This is a comment made in thatapplication:-
'An west-east seismic line from Godley Bridge to Alfold at a vertical exaggeration of 10 times shows the Godley Bridge closure. The leads to the east are either extremely subtle, or closed by static artefacts. The Godley Bridge structure has less vertical relief than the static artefacts.'
Note that the 'leads to the east are either extremely subtle, or closed by static artefacts' is what UKOG plan to drill at Loxley. If I were IGas I'd let someone else pay to find out if their map is correct or not.
But your argument is looooo.....etc
Then there's:-
'But the BRX4 well reperf in to the Portland could produce 3 or 400 barells a day according to MD George Lucan'
Could.
Sounds like he's hoping to spoof investors with an initial test - remember the 2016 HH-1 testing - HH-1 1688bopd constantly predicted by FOTH and freeasabird. A few years later and awapping testing between Kimmeridge and Portland and stopping and starting for various reasons enabling pressure recovery then RNSing selected flow rates - production start rate 300+bopd, 6 months later an average of about 100bopd (plus water), 2 years later about 60bopd, plus water.