RE: Yes, Alkaid: only 3.4% of PANR’s 2.3billion…9 Jan 2023 13:01
Re oilman Jim
Confirming 200 barrels only as flowrate is slightly I believe misleading
The 500 barrel as stated by jay is a 3 part mixture
Oil condensate ngl and has also been said is normal in industry and is same for prudroe bay
But does come at a slight discount but is still at a premium for Alaskan light
Also after full clean out of blockage and frac sand and water this can change again in mixture and during life of well
With blockage cleared
From 40% to 60% + water cleared
And well valve pressure increased due to reduced risk
I’m assuming 500 can easily achieve 750 plus
I’d like to know if there is any further risk to horizontal pipe with a work over rig coming in or is it just a formality from here
Good
Luck all