RE: Niger18 Jul 2019 13:12
Looks okay
According to Article 9 of the PSC, during the Initial Period, the Contractor undertakes to execute the following Minimum Works Programme: (i) acquisition, processing and interpretation of 2000 km of new 2D seismic profiles whose 2/3 at least shall be effected on the Block R2; (ii) acquisition, processing and interpretation of 1000 km2 of new 3D seismic profiles whose at least 50 per cent. shall be effected on the Block R1; (iii) drilling of 5 Exploration Wells to a minimum depth of two thousand, five hundred (2,500) metres with at least one (1) well in each of the Block R1 and Block R2.
If a renewal exploration period is granted (each of which is up to two years in length), the Contractor shall implement the following Minimum Works Programme:
• For the first renewal period: (i) acquisition, processing and interpretation of 1000 km of new 2D seismic profiles whose 2/3 at least shall be effected on the Block R2; (ii) acquisition, processing and interpretation of 500 km2 of new 3D seismic profiles whose at least 50 per cent. shall be effected on the Block R1; (iii) drilling of 2 Exploration Wells to a minimum depth of two thousand, five hundred (2,500) metres with at least one (1) well in each of the Block R1 and Block R2.
• For the second renewal period: (i) acquisition, processing and interpretation of 500 km of new 2D seismic on the Block R2; (ii) acquisition, processing and interpretation of 500 km2 of new 3D seismic profiles whose at least 50 per cent. shall be effected on the Block R1; (iii) drilling of 2 Exploration Wells to a minimum depth of two thousand, five hundred (2,500) metres with at least one (1) well either on Block R1 or Block R2.
If the Contractor fails to satisfy the Minimum Works Programme obligation either at the Initial Period or if due to the total renunciation or the withdrawal of the EEA during these periods, the works have not achieved the minimum undertakings required for that period, the Contractor shall pay the Government, as a lump sum payment, within thirty (30) Days after the end of the period concerned, the effective date of the total renunciation or the date of the withdrawal of the Exclusive Exploration Authorization, a penalty equivalent to: (i) one million (1,000,000) dollars for each undrilled Well; (ii) eight hundred