RE: Baron Oil: is the next catalyst coming? by Charles Archer November 1, 20232 Nov 2023 10:25
And the assumptions about shell are wrong, they wanted to take Sunrise to Woodsides Darwin facilities, they had a jv within the jv with Conoco Phillips, to take the majority of production to the S.W USA states from 2003, in 2008 tried again with FLNG, first denied by Gusamo, the second by Horta , TL 0% Holding at the time, just territorial rights, Shell said leaving, moved Chuditch Australian license over to Mitra and waited on TL Gov for years, until they stumped up $650m to pay for Shell/Conoco 56%, with immediate double standard, as Majority holder, the JV should do what we want !
Shell announced the FLNG Ship was under construction in a Korean shipyard and specifically for first use Sunrise, with a 26/28 wellhead plan, so if allowed, pretty sure they would have retained Chuditch, to drain after Sunrise back then. 🤔
The current Mitra connection remains, they also planned FLNG, the license disappeared, resurfacing in Nov 2019 as the new TL license and NON tender award to Sundagas for services rendered since 2016, pretty sure I remember reading those original directors had a connection with being ex Mitra.
Why keep saying Andy Butler is our secret weapon in all this, helped TL set up its own industry, still involved in the training and development via Sundagas, did not float in Singapore until 2018/19 in prep for the Chuditch award, at which time he also got a $20 or was it $25m development loan agreement with a Singapore bank (untouched as far as I know) no idea if that money still sits in the background, since we absorbed SG in 3 stages, after the full RTO failed in 2020, due to Baron not being able to raise the funds (prob no one would stump up on a stalled region risk) so took 33% 25% Chuditch to set the ball rolling.
So still wonder about that Singapore funding link, if we do end up going it alone, lesser rig partner, with that legacy funding being non dilutive loan , vice equity ?🤔
The amount £ 20/25m was what was also announced on the bid round, potential bidders having to prove they had that sum to develop if license awarded, in order to qualify. 🤔