RE: TL ready to participate in Expo 2025 Osaka Kansai30 Mar 2023 19:03
As said the TL side , jump the gun , over react and make things up as they go along
that's why we need to see , the other side of the House Woodside , Australia and or
other companies/countries making their own POSITIVE statements.
The TL side have pumped , talked with all and sundry about the importance of Sunrise
for two decades and it being progress all the way in many an interview (total bs) hence
little faith in what they continue to come out with, until it's backed up by someone else.
In our case, all we need is confirmation a permitted processing route EXISTS, or a Major
Tier1 , coming to take us away ha ha, on the prospect it will happen this time/decade. lol
As said many times before, something has to give soon, the other project up North at
Metinaro, expected some 5 years before Beaco, someone has to supply it for all their
domestic needs plus 90 day emergency storage for the 3 being converted Island power
stations.
Defeats the objective laid out in Parliament, to save them millions per annum , if they have
to go elsewhere for more expensive Imports, over the original plan of using their own Gas.
That plan was to co-locate the Island Gas/LNG Import facilities with the Gas/LNG Exports
at Beaco on the South Coast , supplied from the Sunrise pipeline.
The Import fac's , stripped away from Beaco , still years if ever , before any production.
Why I've always fancied a Chuditch , Sundagas plan to FPSO, to initially cater for that
Domestic need supply, then once if established, expanded production via the hub
pipeline to Beaco, with a multi production well FFD
Chuditch could end up at least as big as Sunrise, its FLNG plan by Shell, was 26/28
wellheads to the platform, for 30 years, before Gusmao Horta and co, thwarted them
for a second time, so they left.