RE: Very positive update1 Sep 2022 10:27
The higher the grade of ore processed, other things being equal, the lower the AISC.
This is why AISC at Yanfolila should be significantly lower in the second half of this year.
Processing volumes are already back at optimum levels as demonstrated in the Q2 results. The primary source of ore now, according to the mine plan, will be the high-grade Komana East pit which has reserves of 2.99g/tonne which will boost the amount of gold produce and lower AISC as total costs are spread out over a higher amount of production.