RE: Sensible RNS27 Nov 2020 12:02
Over recent months BPC has undertaken an extensive body of work, in conjunction with Stena Drilling and a number of BPC's key contractors, to develop a Covid-19 mitigation plan. This plan is designed to minimise the chance of importing the virus on to the Stena IceMAX drill ship, and thus to ensure continuous operations whilst also providing a series of plans for outbreak containment and business continuity.
Accordingly, the Company's Covid-19 mitigation plan has defined a series of Covid-19 protocols (isolation, testing and quarantine) to be applied ahead of and throughout the drilling campaign. Moreover, given the highly fluid nature of the global Covid-19 situation, the Covid-19 plan as developed contemplates a wide range of potential Covid-19 scenarios, with a tiered range of specific mitigation measures applicable.
In recent days and weeks international measures taken to mitigate the ever-evolving Covid-19 situation have had an emerging impact on BPC's intended operations. For example, in the United Kingdom, where approximately half of the rig crew are based and where almost all of the rig crew will assemble pre-mobilisation, a national lockdown had been reimposed along with heightened tier responses. Equally, the United States, being the location from which much of the technical support and supplies for the rig will emanate, is experiencing record levels of Covid-19, and the likelihood of tighter restrictions and new lock-downs appear to be increasing. In The Bahamas a State of Emergency remains in place and there is considerable and growing uncertainty as to the uninterrupted availability of required services, for example regular scheduled flights and accommodation.
In view of this evolving situation, BPC and Stena Drilling have decided to move to implement an even more rigorous Covid-19 mitigation plan, so as to ensure creation of a series of effective Covid-19-free "bubbles" that completely isolate and test all crew, staff and vendor personnel on an enhanced basis, and thus "shields" the vessel to the maximum extent possible from the risk of Covid-19 importation / disruption.