Energia del Sur6 Feb 2019 13:16
Now that the power plant is back in full production, it got me wondering what the power plant would cost to build today and what our 50% ownership of the plant may be worth.
Don't know if anyone has any expertise in this area, but so far I have only come across a 225MW combined-cycle gas turbine power plant being built in Turkey which has an estimated total project cost of $300m.
EdS has a 136MW capacity, which is clearly a lot less than 225MW, but I would still guess the cost to build a plant of that size today would be a material sum.
In 2005 Rurelec paid $6m for a 50% ownership of the then 77MW power plant, and a little later EdS borrowed £18m to expand the capacity to 136MW.
I would imagine a new off-take deal has been agreed with CAMESSA following the granting of the recent loan, and the fact that EdS have recommenced the repayment of the outstanding loans and interest to Rurelec is a very positive sign that the plant is generating both profit and income.
On a historic cost basis, EdS had a value of circa $30m, but I would imagine it would cost a lot more to build the same thing now.
Food for thought, but I still maintain our net assets are worth substantially more than the current mkt cap.