RE: 3rd place8 Sep 2021 11:26
Horse Hill (UKOG, Surrey), at 7th place, overtook Scampton North (IGas, Lincolnshire)...
Barrels of oil per day at Horse Hill were down slightly at 100.2, compared with 101.1 in April and 104.7 in March. But total production for the month was up slightly at 494m3 and 417.9 tonnes in May 2021, compared with 482m3 and 407.8 tonnes in April 2021.
Water production in barrels of water per day was 40 in May 2021, down from 46.8 in April 2021.
The water cut at Horse Hill (water as a proportion of total liquid produced) has continued to fall. It was 29% in May 2021, down from 31.6% in April and 32.5% in March.