RE: Morning RNS25 Apr 2022 18:38
Questions A and B of an Investor Question asked on 27/10/21 and the answers provided:
... So my questions are:
A What is the predicted output of Saltfleetby without the sidetrack being drilled? Will it be enough to cover the 5.4mmscfd of the hedge in November 2022?
B If the sidetrack is successfully drilled, what would you hope would be the total gas output of Saltfleetby mmscfd in a worst, probable and best case scenario? ...
A.The lenders technical advisers and Angus evaluated the deliverability of the existing two wells as being likely to be greater than 5 mmscfd. The reasoning was twofold. In the last years of delivery to the old Conoco refinery, average production was constrained by persistent issues with the main compressor at Theddlethorpe. Secondly it was the view of technical experts that, following a prolonged shut-in, the two wells should have improved deliverability in the first 18 months or so of operations. This is because prior to shut in there was an area of reduced pressure around the producing wells. Since then the pressure has equilibrated across the field resulting in significantly higher pressure around the producers. So it is our view that the hedged production should be able to be covered by these two wells in the event of failure of the sidetrack
B. Finger in the air: Worst 7mmscfd, Probable 10mmscfd, Best 10mmscfd (but extended for a longer period of time) Note, the combined deliverability of the three wells will exceed the production rate during the plateau period which is limited to 10mmscfd by virtue of the process equipment ...